Concrete Formwork System’s Operating Platform
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Operating Platform
As operating platform, the shaft platform is mainly used in the concrete pouring of elevator shaft, equipment shaft, stair shaft of high-rise building etc.
2. Main Features of Operating Platform
A) The length of shaft beam is adjustable. Lmin=1450, Lmax=5800.
B) Flexible structure makes lifting easier.
3. Operating Platform Images
4. Operating Platform Specification
Lmin=1450, Lmax=5800.
5. FAQ of Operating Platform
1) What can we do for you?
We can ensure the quality of the vinyl banner and avoid extra expenses for customers.
We can provide you the professional design team.
We can provide fashionable and newest styles for you.
We can design the artwork for you.
Please feel free to customize.
2) What promises can be done by us?
If interested in Operating Platform, please feel free to write us for any QUOTE.
If printing required, please advise asap because the whole set need much more time to complete.
Please DO check goods when courier knocks your door and contact us asap if any issue.
3) What about of our after-sale service?
Response will be carried out in 24hours after receiving any complain or request.
If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
Packing: As Customer's Requirements
Shipping: We have various shipping ways for our customers, such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.
Shipping time:Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. Other mass qty of Operating Platform, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.
- Q:What is well in the construction project
- There is no specific definition of "wellbore" in the construction project. It is estimated that you may say that the underground pipe network and the pipeline repair well are surrounded by the cylindrical part of the tank, and the high-rise building is reserved for the elevator.
- Q:A lot of housing elevator shaft why have set up before and after the hole, obviously only one elevator front room, behind the structure of the hole to open what he used to do? Or in order to reduce the structural stiffness? Or in order to reduce the load? Seek the design elite to give thanks Thank you
- This situation should be spare, there are some for the elevator through the door design
- Q:My family to buy a new house, a total of five floors, my second floor, the first floor with a basement, basement north of a row of garage. Now my house downstairs to buy two adjacent garage, with the basement to get through, in the basement built elevator directly to the first floor. Does this have any effect on my family? Housing quality, firmness, noise and so on! Thank you!
- Must have an impact to consider his elevator is built indoors or outdoors outside the estimated impact of small but the property does not agree that the property may be regardless of the elevator, then the difference is estimated that there is no noise to see what the elevator is manned or direct Is not built on the wall
- Q:Concrete is also used, grouting also note, the water does not leak are used, is infiltration
- It was you did not find a good construction team. Because you said the treatment, it is estimated that each time are handled separately it Cost is also a separate to it Tough leaking, the need for a one-time comprehensive management Caixing. We generally as a plugging to the subsequent free warranty for 5 years. So for the construction of the terms, more than a maintenance will be much more cost. Only once repaired, in order to produce a certain profit.
- Q:Why did the Anping platform mean that the work surface could be mined?
- Coal seam along the direction of the mining order forward and backward. In the field within the field, to the wellbore as a benchmark, from the wellbore to the border in advance of the forward type, and vice versa called back. In the mining area, the working surface from the upper (lower) mountain to the boundary to promote the district forward, on the contrary called the district back type.
- Q:What are the quotas for the concrete
- If the inspection wells in your project are the stereotypes in the standard set, you can select the corresponding quotient subheads with the corresponding sounding wells. If the non-stereotyping wells can be installed by the cast iron cover, such as the underlaying, the bottom of the well, the borehole, the covers, and the cast iron covers can be used to calculate and apply the quotas separately.
- Q:Check the wellbore height and well height respectively
- Manhole: connection (manhole) Sewage sewer and drainage pipes Maintenance workers Check through piping to prevent clogging of the structure. Precipitation and manholes are generally located at the intersection of the station's ground drains, drains, sewers or elevation changes that are prone to siltation, obstructions where it is convenient for dredging and a sedimentation draining well.
- Q:How much is the elevator floor
- First look at what you are the speed of the elevator, the elevator speed is different, the buffer distance is not the same, requiring the height of the engine room is not the same, such as 2.5m / s elevator, with 4.0m / s elevator, the buffer distance is not the same The height of the engine room is not the same.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Concrete Formwork System’s Operating Platform
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords