• Concrete Formwork System’s Operating Platform System 1
  • Concrete Formwork System’s Operating Platform System 2
  • Concrete Formwork System’s Operating Platform System 3
  • Concrete Formwork System’s Operating Platform System 4
  • Concrete Formwork System’s Operating Platform System 5
Concrete Formwork System’s Operating Platform

Concrete Formwork System’s Operating Platform

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Operating Platform

As operating platform, the shaft platform is mainly used in the concrete pouring of elevator shaft, equipment shaft, stair shaft of high-rise building etc.

 

2. Main Features of Operating Platform

A) The length of shaft beam is adjustable. Lmin=1450, Lmax=5800.
B) Flexible structure makes lifting easier.

 

3. Operating Platform Images

 

 

 

4. Operating Platform Specification

Lmin=1450, Lmax=5800.

 

5. FAQ of Operating Platform

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.    

Please feel free to customize.  

 

2) What promises can be done by us?

If interested in Operating Platform, please feel free to write us for any QUOTE.

If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

Response will be carried out in 24hours  after receiving any complain or request.

If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

Shipping time:Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. Other mass qty of Operating Platform, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  

Q: A lot of housing elevator shaft why have set up before and after the hole, obviously only one elevator front room, behind the structure of the hole to open what he used to do? Or in order to reduce the structural stiffness? Or in order to reduce the load? Seek the design elite to give thanks Thank you
In order to open the door on both sides, especially the cargo ladder. This is usually used to open the door before and after, mainly spare
Q: Check the wellbore height and well height respectively
The height of the wellbore is the height of the wellbore to the height of the wellhead. Well, is the space in the well to carry out the relevant operation. Check the chute of the well, with the same elevation of the same base, when people enter the inspection wells, to stand on both sides of the sink. So the bottom is filled with fine stone concrete, accounting for a certain height of the wellbore, the remaining wells, the net height is the height of the well
Q: Concrete is also used, grouting also note, the water does not leak are used, is infiltration
There are two ways to solve. First, in the pit to do a water foundation pit, can put the depth of the submersible pump, water to a certain depth, the water will be automatically out of this approach more practical. Second, the elevator pit plugging program
Q: Why did the Anping platform mean that the work surface could be mined?
Coal seam along the direction of the mining order forward and backward. In the field within the field, to the wellbore as a benchmark, from the wellbore to the border in advance of the forward type, and vice versa called back. In the mining area, the working surface from the upper (lower) mountain to the boundary to promote the district forward, on the contrary called the district back type.
Q: What are the quotas for the concrete
(Concrete prefabricated) Prefabricated cover plate Installation of wellbore covers and associated scaffolding templates and even concrete transport, etc.
Q: What is well in the construction project
After the completion of the wellbore for the elevator, in the construction process of many ancients are in the wellbore, compared to what the crane
Q: My family to buy a new house, a total of five floors, my second floor, the first floor with a basement, basement north of a row of garage. Now my house downstairs to buy two adjacent garage, with the basement to get through, in the basement built elevator directly to the first floor. Does this have any effect on my family? Housing quality, firmness, noise and so on! Thank you!
Must have an impact to consider his elevator is built indoors or outdoors outside the estimated impact of small but the property does not agree that the property may be regardless of the elevator, then the difference is estimated that there is no noise to see what the elevator is manned or direct Is not built on the wall
Q: How much is the elevator floor
This is based on the requirements of the elevator manufacturers, generally in the design of the time, the owners have not set the elevator manufacturers, but can have intention, according to the intention of the manufacturers of samples, the appropriate amplification, in the structure before the construction, and then modify the official information Yes.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords