• Scaffolding U Head Jack Base/screw base jack System 1
  • Scaffolding U Head Jack Base/screw base jack System 2
  • Scaffolding U Head Jack Base/screw base jack System 3
  • Scaffolding U Head Jack Base/screw base jack System 4
  • Scaffolding U Head Jack Base/screw base jack System 5
  • Scaffolding U Head Jack Base/screw base jack System 6
Scaffolding U Head Jack Base/screw base jack

Scaffolding U Head Jack Base/screw base jack

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
100000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Scaffolding jack base

 

 

 

Solid Jack Base

Dimensions: Diameter 32/34/38mm,

Base plate 150x150x5/6mm,As your request 

length 600,914,1524mm as your request

Feature:       

1)Heavy duty steel construction.

2)Galvanised for long lasting protection.

3)Used for propping timber or steel beams.


 

  Scaffolding U Head Jack Base/screw base jack

 

 

 Scaffolding U Head Jack Base/screw base jack

 

Hollow Screw Jack Base

Dimensions: Diameter 32/34/38mm,

Base plate 143x143x5/6mm,As your request 

length 600,914,1524mm as your request 

Surface: Electro galvanized, Hot dip galvanized, or painted

Standards: EN74

OEM service available

 

 

Item

Hollow Screw Jack Base

Material

Q235

Dimensions

35/38mm, 100x150mm, 600,914,1524mm

Surface

Hot-dip galvanization, electro galvanization

Standard

EN74

Note

OEM service is available

MOQ

1000pieces

Package

in steel pallet ,or as your request

Payment Terms

TT,L/C, we can contact in detail

Delivery Time

20-30days

 

 

 Scaffolding U Head Jack Base/screw base jackScaffolding U Head Jack Base/screw base jack

 

 Scaffolding U Head Jack Base/screw base jack

 

Scaffolding U Head Jack Base/screw base jack




We are professional manufacturer and supplier of scaffolding systems, scaffolding couplers, and other related products. With good quality and competitive price, our products are very popular in European, Australia, North America, Mid-east, and South East Asia and some African countries.

 

 

 

 

 Scaffolding U Head Jack Base/screw base jack

 

 


Packing

in bulk , pallet or as your request

 

 

Scaffolding U Head Jack Base/screw base jack

 

 Scaffolding U Head Jack Base/screw base jack



Q: i need as much detail you can give me on these symbols in the book scarlet letter by Nathaniel Hawthorne. if you have any website references besides cliffs notes and spark notes i would greatly appreciate it!!!
The letter A on Hester's chest AND the letter A traced in the sky the night the governor died. The A on Hester's chest was, of course, a sybol of Adultry. But in the end, Hester chooses to wear it after she doesn't need to anymore, and most people take that to mean that the meaning of the symbol has changed, it became more something she overcame, it comes to stand for able. The letter A traced in the sky when the governor dies has two different meanings, the general public took it to mean that the governor was now in heaven as an angel, but Dimmesdale saw it as a symbol of his own adultry. The scaffold, as you said, which I think is a symbol of judgement and sin. Pearl is also a symbol - she is a literal symbol of the love affair, but also a symbol of innocence. For websites, just google scarlet letter - thats what I did and found lots of good information.
Q: Please help me in building professional people (scaffolding)
Please know a good personLearn slowlyWell then consider whether or not to kick offMore types of scaffolding
Q: What are the characteristics of disc scaffolding
Disc scaffolding and scaffolding, for manufacturers, construction units, rental units refer to a scaffold, just two different names. The same scaffolding.
Q: Room 29 meters outside the wall of the two rows of steel pipe scaffolding installation, demolition, joint protection measures in Wuhan, the price per square is how much money? A friend to help refer to Kazakhstan
With regard to the design and construction of floor type (double pole type) single and double row steel pipe scaffold for industrial and civil construction, and the design and construction of formwork support in the construction of horizontal concrete structure. National compulsory technical norms, because of its complexity, and you proposed "one square meter standard steel scaffolding the number of meters" is a vague and unclear description of the problem, considering the matter of security,
Q: Where to use scaffolding in construction
5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.
Q: What are the main safety problems when dismantling the scaffold
1, all the rods and fasteners in the demolition of the separation, not on the rod attached fasteners or two rods connected to the ground.2, all the feet of the hand, should be erected from the outside of the handle, in order to prevent the feet and garbage from falling.
Q: Find the demolishing scheme of scaffold
Removal methodThe development of the demolition plan, the program should include the removal of the steps and methods, safety measures, etc.. Demolition order should be observed from top to bottom, the first after the demolition, after taking the first demolition principle. That is, first remove the railings, scaffolding, scissors support, diagonal bracing, and then small beams, large cross bars, vertical poles, etc., and according to the principle of one step clear in order to be prohibited from top to bottom at the same time the demolition work. Remove the shelf of the high-altitude personnel should wear safety helmet, safety belt, wear soft shoes on the shelf, at the same time, around the railing or set up a warning sign and a special command, in order to avoid casualties.
Q: What are the common rules for calculating the amount of scaffolding works
The calculation of masonry construction height within 1.35 ~ 3.6m according to the calculation in the scaffold; scaffold height above 3.6m, the independent brick columns are less than 3.6m in height according to the circumference of the core column is built by scaffolding in height according to the calculation; at an altitude of 3.6m and above at the circumference of the core column is built by 3.6m and calculated by single row height scaffolding.
Q: Introduction of external scaffolding
2 the size and surface quality of steel pipe shall meet the following requirements:1) the new steel pipe should have quality certificate, quality inspection report; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth of steel pipe; allowable deviation table item allowable deviation inspection tool 1 welded steel pipe size (mm) diameter 48 wall 3.5 -0.5 thick 2 vernier caliper at two ends of the steel tube shear diagonal deviation 1.7 corner ruler feeler, the outer surface of the steel pipe 3 corrosion depth is less than or equal to 0.50 bar 4 vernier caliper end bend L = 1.5m = 5, 5 pole bending steel ruler 3m<l = 4m4m<l = 6.5m = 12 = 206 level bar, inclined bar bending steel pipe L = 6.5m = 302) from drilling pipe.
Q: Compared to Pankou scaffolding and scaffolding have what distinction, what are the advantages
3, Pankou scaffolding load intensity up to 200KN capacity4, Pankou scaffolding scaffolding activities. Abandon the traditional parts easily lost, easily damaged, and compared with the ordinary bowl-scaffold, saving up to 2/3 more than the amount of steel, so to a certain extent, greatly shorten the construction unit cost and economic loss.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords