Scaffolding Parts-Galvanized Wing
- Loading Port:
- XINGANG
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 2000 Unit/Units pc
- Supply Capability:
- 10000 Unit/Units Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
The steel formwork scaffolding part-Galvanized Wing Nut :
1.Name: The formwork scaffolding accessories— wing nut
2.Material: casting steel, ZG25
3.Surface treatment: Raw/ HDG
4.Specification: as clients' drawing
5.Use: suit for formwork scaffolding
Specifications of Scaffolding Parts-Galvanized Wing Nut :
1) Scaffolding wing nut ,Q235 Steel material
2) Surface: Cold dipped galvanized
3) Dia.: various sizes are available
4) Weight: Standard or as customers request
Name | Wing Nut |
Materail | Ductile Cast Iron |
Surface finished | zinc plate |
Size | Dia 26mm |
Weight | 0.35kg |
Supply Ability | 5000pieces per month |
MOQ | Negotiation |
Payment Terms | L/C,T/T,Western Union |
Delivery Time | 20-45days or as your quantity |
OEM service | Available |
Standard | BS1139,EN74 |
Details of Scaffolding Parts-Galvanized Wing Nut :
1. Raw Material: ductile iron or forged carbon steel
2. Weight: Standard or as customers request
3. Standards: BS1139, EN74 class A & B
4. Working load: minimum 17kn
Specifications of Scaffolding Parts-Galvanized Wing Nut:
Ductile wing nuts
2.Material: ductile iron
3.Various specifications available.
4.Surface: Plain, white galv. or color galv.
Details of Scaffolding Parts-Galvanized Wing Nut :
Electroplate Surface
Weight: 1-1.8kg
Ductile Iron Material
Different kinds of design as per your requirement
Material:ductile iron
Diameter:18mm
Surface treat:zinc plate
working load: minimum 17kn
With different kinds of design
High Quality Competitive Price
cast iron tie rod nut
1. We also call it Alignment coupler
2. It used to entighten the connection of each two formwork panels
3. Increase the strength of formwork
4. This BFD Coupler Panel Formwork clamp's infill area up to 100mm
5. Adjust size:94mm to 225mm
6. Material is high grade steel,Q235
7. Surface treatment: Elec.galvanized (Yellow or white)
8. Application: PERI formwork system
Packaging & Delivery of Scaffolding Parts-Galvanized Wing Nut:
Packaging Detail:Plywood case or pallet or as your request.
Delivery Detail:10-30 days after receive remittance
We are specializes in designing & manufacturing of various kinds of formwork systems, including H20 timber-beam formwork, aluminum formwork, steel (aluminum)- frame formwork etc.
All the equipments & formwork systems produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.
- Q:What are the general requirements for fire protection facilities?
- No water or extreme water shortage in the construction site, may not set up temporary fire water supply system, but according to the provisions of Article 6.2.2 of the provisions of the 2.0 times the number of fire extinguishers
- Q:What are the aspects installation of the construction site?
- What are the aspects installation of the construction site?
- Q:How to manage the construction equipment at the construction site
- Personnel training, accreditation of staff training, including job skills training and personnel safety education and training
1. Manufacturer Overview |
|
---|---|
Location | Hebei, China |
Year Established | 2008 |
Annual Output Value | Above US$ 200 Million |
Main Markets | 50.00% Mid East 5.00% North America 5.00% Eastern Asia 30.00% Eastern Europe 8.00% Southeast Asia 2.00% Western Europe |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Xingang |
Export Percentage | |
No.of Employees in Trade Department | 0 |
Language Spoken: | Chinese |
b)Factory Information | |
Factory Size: | Above 1,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | Design Service Offered |
Product Price Range | Average |
Send your message to us
Scaffolding Parts-Galvanized Wing
- Loading Port:
- XINGANG
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 2000 Unit/Units pc
- Supply Capability:
- 10000 Unit/Units Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords