• scaffolding parts base plate System 1
scaffolding parts base plate

scaffolding parts base plate

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:
Hebei China (Mainland)


Model Number:
steel square post base plate
Type:
Scaffolding Parts
Scaffolding Part Type:
base plate
Company:
Shijiazhuang Dongzhechisheng Metal Products Co.,Ltd
Material:
Carbon Steel Q235
surface:
Galvanized
Usage:
used in scaffolding or frame
Package:
in steel pallet or as your quest
MOQ:
1000 PCS Base Plate
Size:
140*140*5.5 mm
Weight:
0.65kg

Packaging & Delivery

Packaging Detail:in steel pallet or as your requirement
Delivery Detail:Within 7-15 weekdays after receiving the deposit.

Specifications

steel square post base plate
Material:Carbon Steel
Surface:galvanized
Size:140*140*5.5 mm
Weight:0.65kg

Product Name:  steel square post base plate

Material: Q235

Surface:galvanized

Weight:0.65kg

Size: 140*140*5.5 mm


Q: The outer hanging scaffold board 12 embedded parts embedded in the crack?
Is the pre embedded parts installation (burial) component hidden in the works inside. Is placed in the structure of casting fittings, for masonry superstructure when the lap. In order to facilitate the installation of engineering equipment based on external fixation. Most embedded parts made of metal, such as steel or iron, can also be used in wood, plastic and other nonmetallic rigid materials.
Q: What is a bar in the scaffold
Scaffolding is 1.5 meters of the cross bar is called the cross bar; long to such as the steel pipe is generally called the 6 horizontal pull rod
Q: Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
Disc scaffolding systemIs a new type of scaffolding, the product was introduced in Europe in the last century in 80s, is the upgrading of products after the bowl buckle scaffold. Also called chrysanthemum disc scaffolding, scaffold system, disc scaffolding system, buckle disc scaffolding, layher frame (layer frame, Lei Ya frame, because the basic principle of the scaffold is by the German LAYHER (Lei Ya)'s invention, the industry has been called the "thunder sub frame"
Q: I'm reading the novel by nathaniel hawthorne. There seems to be a lot going on in the scaffold scenes that i kind of not understand. Can someone explain the significance of these scenes? I am not a fan of cliffnotes or sparknotes because i actually READ the books. please someone who has read it tell me, i appreciate it.
do you mean the part where she's on the scaffold with pearl when she's just born or when the three of them hold hands and then the priest has to leave? Well either way, the scaffold means embarrassment, it's like having to wear the A but being more upfront with people so you don't really have to explain yourself, everyone just knows. That's the reason, i forget his name, the priest that's pearl's father, goes up to the scaffold, because no one knows he secretly wears the A that's why going on the scaffold allows him to free himself of guilt, he wanted everyone to know so he would stop living in hidden pain but when pearl and her mother come, it makes it too real for him, he kind of wakes up, you could say, so he becomes too frightened and decides not to carry out his plan.
Q: Scaffold removal should comply with those requirements......
Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
Q: In the Scarlet Letter, when Dimmesdale asks Hester who Chillingworth really is, why does she keep her oath to him of not revealing that he is her husband? Guilt? Morals? Thanks
The rosebush grew to become in front of the darkened, detrimental penal complicated, between many much less suitable flowers. i think of of it symbolized that there is popularity in even the worst of souls. it may serve, enable us to need, to advise some candy ethical blossom, that's found alongside the song, or relieve the darkening of a tale of human frailty and sorrow.
Q: Was thinking of getting one. How much do they cost?
Only a professional piercer can decide if your ear can handle and industrial piercing. Consultations are free and I highly recommend booking one before you get the piercing. Mine was $70, but my regular piercer does them for $50. It just depends on what shop you go to.
Q: how did they turn the cells into a polymer for the heart scaffold ?
May have misunderstood. The heart is gently stripped of cells by using a detergent - this leaves the extracelllular matrix - a polymer of collagen - inert and insoluble. New cells (stem cells) will then be added to the structure to repopulate it with living heart muscle which gain coordination and structure from the matrix.
Q: i have an interview tomorrow but have a scafold piercing in , its been in there for about 2/3 months nearly healed competely , how ling can i leave it out for , maybe 30-45 minutes? thanks
They take around 6-9 months to heal completely...you shouldn't be taking it out at all. I stupidly took mine out after 3 months to clean a bit behind the bar and the bar would never go back through the top hole. It hurt like crap and bled profusely if I tried to push it through.
Q: scaffolding business?
scaffolding business would refer to building the business up in steps that are connected. A gradual increase, building up from what is already in place.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords