• HDPE Anti-skid Point Geomembrane System 1
  • HDPE Anti-skid Point Geomembrane System 2
  • HDPE Anti-skid Point Geomembrane System 3
HDPE Anti-skid Point Geomembrane

HDPE Anti-skid Point Geomembrane

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification sheet


No.

Item

             Test Value

0.75mm

1.0 mm

1.25 mm

1.5 mm

2.0 mm

2.5 mm

3.0mm

1

Minimum Density(g/cm³)

0.939

2

Tensile Property

Strength at yield,N/mm

11

15

18

22

29

37

44

Strength at break ,N/mm

20

27

33

40

53

67

80

Elongation at yield,%

12

Elongation at break,%

700

3

Tear Resistance   N

93

125

156

187

249

311

374

4

Puncture Resistance  N

240

320

400

480

640

800

960

5

Stress Crack Resistance, hrs

300

6

Carbon Black Content, %

2.0-3.0

Carbon Black Dispersion

1  or  2

7

Standard OTI  Min

100

High Pressure OTI  Min

400

8

Impact Cold Crack at -70°C

Pass

9

Water vapor permeability

(g.cm/cm2 .s.Pa)

≤1.0×10-13

10

Dimensional Stability (%)

±2



Features

  1. Complete variety of specifications of width and thickness. Thickness: 0.08-2mm/Width: 2-16m .

  2. Excellent environmental stress resistant cracking performance.

  3. Excellent performance of chemical erosion resistance.

  4. Big scope of application temperature and long service life .

  5. Applied in landfill waste site, sewage and filth treatment site, tailings depot and underground construction project


Q: How to do waterproof bathroom, construction process is what
Second, the construction process: 1, grass-roots treatment: grass-roots surface must be smooth and smooth, there must be no pit phenomenon may not loose, trachoma or hole exists. If the above phenomenon should be smooth and smooth after the construction, the surface must be dry, there must be a pipe at the root of the head must be wiped into a circular arc, the pipe must be strong. 2, brushing the primary treatment agent, the "Liang wall" waterproof primer at the end of uniform mixing, and then use a long brush or rubber brush scraper, scratching the waterproof material, even brush to the grass-roots level, brushing Can not be stacked and exposed white bottom, brushing the amount of each time to 0.4kg / square meters is appropriate, the first time after the full dry before brushing the second time. 点击图标下载 App
Q: What is PE waterproof cloth and PVC tarpaulin
PE tarpaulin, anti-aging, anti-aging, anti-corrosion, light, easy to fold, relative to the PVC tarpaulin, PE tarpaulin cheaper price for the freight yard, the service life will be shorter.
Q: Can acrylic materials be perforated? How to do waterproof after punching?
Anti-corrosion nine PCT board size is greater than the size of the hole, that is, just in the hole on the nine-plate, This can play a certain role in strengthening.
Q: Roof membrane waterproof construction process, what should be noted that?
Four do not: 1 surface can not afford sand 2 surface can not afford skin 3 surface is not crisp 4 does not crack
Q: What material waterproofing can be mixed with cement sand
Construction can also be used to produce waterproof pulp, waterproofing agent for the amount of cement 3 ‰ -4 ‰, the use of cement label not less than 32.5MPa.
Q: How does the finished ventilator manufacturer waterproof?
Rooftop natural ventilator waterproofing measures are mainly two kinds, one is the traditional silicone, adhesive tape waterproof, the other is the structure of water, the national standard Atlas 11CJ33 "ventilation and light skylight" recommended the use of structural waterproof technology.
Q: Js waterproof coating without powder can brushing
5. Coating maintenance: JS cement-based waterproof emulsion coating construction after 24 hours after the end with a damp cloth to cover the coating or spray water to maintain the coating, usually 2-3 days; air humidity, poor ventilation of the local dry The time period may be longer, and vice versa; 6. Check the construction of JS waterproof coating (closed water test): bathroom, pool and other parts in the JS cement-based waterproof emulsion waterproof layer after dry (at least 24 hours in summer, at least 48 hours in winter) stored water for 48 hours to see the water Construction is not qualified. Light wall must do the water test. JS waterproof coating See the amount of: under normal circumstances, the amount of about 0.6-1kg / ㎡, the actual amount from the use, the use of parts, rough surface roughness, environmental factors such as the decision.
Q: I would like to ask how to do in the warm water above,
Do nothing to use, because the biggest leak to the hidden danger is to warm the water, but your waterproof design does not include the warm water, you say your waterproof layer construction, in the end how much significance. It is recommended to make the waterproof floor to warm the following, as to what kind of good is not good to say that good things, that kind of good is good.
Q: How can the toilet waterproof works fail?
Can only do a new waterproof, and now have engaged in the base of the waterproof coating, the effect is very good. It is best to ask professionals to do their own difficult.
Q: How does the waterproofing membrane work?
5, lap seam treatment: the roll is rolled, the adjacent two webs of the joints with a short stove welding welding sticky, heated to spill hot melt adhesive for the degree, and then use the flame and iron wipe The sub-joints will be evenly heated to wipe the edge; 6, the coil side of the sealing side of the construction.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords