Ringlock Scaffolding Layer Easy Assembly Top Quality Metal
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Ringlock Scaffolding
Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance.
Ringlock scaffold has the following features:
1.Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection.
2.Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights.
Main Features of the Ringlock Scaffolding
Place of Origin | Beijing, China (Mainland) |
Product Name: | Ringlock Scaffolding |
Custom Code | 7308400000 |
Color | Silver, golden |
Surface treatment | Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating |
Material | Q235,Q345.etc |
Package | Customized Package |
Payment Terms | T/T,L/C |
Delivery Detail | 15-25 Days |
Quality Control | IS09001 Certification, Quality Test |
Standard | 48.3*3.25*4000mm |
Ledger | 48.3*3.25*3072mm |
Ledger End | 1.2kg |
Advantages
1)To be erected easily and quickly
2)Installed to different angels with rosettes of
two different hole being positioned there
3)Ringlock scaffolding provides complete flexibility to lock in any angel.
4)Diagonal braces are to be tailored in
accordance with the lengths of vertical and horizontal tubes
Specification of Ringlock Scaffolding
The Standards(Verticals) | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
3000 | 3/3.25 | 48 | HDG/Painted | |
2500 | 3/3.25 | 48 | HDG/Painted | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1500 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
500 | 3/3.25 | 48 | HDG/Painted | |
The Ledgers(Horizontals) | ||||
Effective Length(mm) | Tube Thickness(mm) | Tube Diameter | Surface Treatment | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1770 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
The Diagonal Brace | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
2411 | 3 | 48 | HDG/Painted | |
2244 | 3 | 48 | HDG/Painted | |
The bracket | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
730 | 3 | 48 | HDG/Painted | |
Plank | ||||
Effective Length(mm) | Width(mm) | Height(mm) | Surface Treatme | |
2050 | 480 | 45 | HDG | |
1820 | 480 | 45 | HDG | |
3000 | 240 | 45 | HDG | |
2000 | 240 | 45 | HDG | |
1000 | 240 | 45 | HDG | |
Hollow Head Jack And Jack Base | ||||
Length(mm) | Tube Diameter(mm) | Size of Plate(mm) | Surface Treatment | |
600 | 38 | 150*120*50*4 | HDG | |
600 | 38 | 150*150*4 | HDG |
Accessories
Packing
Inspection
Project
More Photos
- Q: An 800N painter stands 3.00m from the left end of a scaffold that is 4.00m long. The uniform wooden scaffold weighs 100N and is hung by a chain at each end. What is the tension in each chain?A uniform meter stick weighs 25 N. An 80 N weight is hung at the 20.0cm mark. A 70.0N weight is hung at the 90cm mark. what is the magnitude of the upward force needed to balance the meter stick?Please help! I have a huge exam on these and my teacher wouldn't help me! I am so stumped please help!
- Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
- Q: Wankou scaffolding steel scaffolding and look like? What is the difference
- Each node of the bowl buckle scaffold is made of a button which is shaped like a bowl, and the frame body is built,
- Q: In my mind it was and still is one of the most dangerous matches in wrestling history in my mind what's your opinion on the scaffold match?
- It is an incredibly dangerous match, but that's what makes it such a spectacle. It's almost the same as watching a tightrope walker or trapeze artist at the circus, because there's always that danger of suffering a life-threatening fall if just one coordinated move goes wrong. Go back and watch NWA Starrcade '86 and watch the Skywalker's Match between the Road Warriors and the Rock 'n' Roll Express. Still makes me antsy to this day.
- Q: I got my scaffold/industrial piercing today..about 4 or 5 hours ago and The glands in my neck are now swollen pretty bad..I usually suffer with swollen glands but not this much..is this from the piercing?? Is it dangerous? Also my ear still stings is that normal?Thanks in advance
- There are a lot of viruses/allergies/sinuses going around right now, and I would say that the swollen glands aren't from the piercing, but it could very well be a lymph node in your neck with a collection of white blood cells grouping together to go fight the bacteria possibly from the piercing. And the stinging is fine, mine hurt for a really long time after I got it. Actually it still hurts quite often. But just keep applying the sea salt mixture three times daily and you should be healed up in no time! (:
- Q: Is there any reason why you shouldn't?
- They will have a shorter life than decking as they won't have been pressure impregnated. But a very good idea, though. Treat it with Cuprinol (if you have a local, friendly timber yard they might have a pressure impregnator and then you're laughing.)
- Q: I love scaffolding piercings - and I really want one.But everyones talking about Cauliflower Ear, and how the piercing can cause it.Is it common to get cauliflower ear from a cartilage piercing?Can I prevent cauliflower ear in anyway? Please help.
- You can get one and to prevent it you have to clean the piercing with listerine a girl i know named myra she got a cauliflower because she cleaned it with alcholo and it looks so nastyyou need to clean it with listerine.
- Q: Japan SS 03 scaffolding system advanced
- The structure, construction and convenient disassembly, basic structure and special components, allows the system to adapt for various buildings; only is composed of an upright rod and the transverse and oblique rod of three kinds of component, vertical rod and the transverse and oblique rod all made in the factory, is a maximum to prevent the traditional scaffolding activities of spare parts easily lost, easily damaged, reduce construction unit economic losses; two is no movable locking member, no security risks maximally prevent the traditional scaffolding caused by movable locking member.
- Q: Why do so many buildings in Manhattan have scaffolding on the street level?
- A few years ago pieces of building facades were falling onto the sidewalks. The city then insisted that all building facades be inspected and repaired. You are seeing the results of the inspections.
- Q: Cuplock scaffolding every 6 meters set a longitudinal scissors is what mean
- When the inner support mould is set up, is there a horizontal and vertical horizontal bar? Six meters along the vertical direction of the horizontal rod set up a scissors on the line
- Q: The main load-bearing structure of the bridge is a hole L0=36 m reinforced concrete arch, with a total width of 3.4 meters, the highest to the lowest level of 17 meters, the use of bowl buckle scaffolding, scaffolding longitudinal 0.6m, transverse 0.9m, step 1.2m. Help me to calculate the bearing capacity of ah thank you!
- Fulcrum spacing is 60cm longitudinal timbers, fulcrum M, square distance is W then according to uniform load distribution Q=p/wThen according to the number of cross W-1 span continuous beams with calculated Pmax and MmaxIn the calculation of I, W, E the final Mmax/W< limit stress but also to calculate the degree of winding </1400L (I value according to the size of the calculation, i=bh^2/6)The first layer of wood even finished the calculationThen go down and check it outThe second layer is the fulcrum of wood 90cm
Send your message to us
Ringlock Scaffolding Layer Easy Assembly Top Quality Metal
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords