Construction Ringlock Scaffolding Easy Assembly Top Quality Metal
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Ringlock Scaffolding
Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance.
Ringlock scaffold has the following features:
1.Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection.
2.Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights.
Main Features of the Ringlock Scaffolding
Place of Origin | Beijing, China (Mainland) |
Product Name: | Ringlock Scaffolding |
Custom Code | 7308400000 |
Color | Silver, golden |
Surface treatment | Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating |
Material | Q235,Q345.etc |
Package | Customized Package |
Payment Terms | T/T,L/C |
Delivery Detail | 15-25 Days |
Quality Control | IS09001 Certification, Quality Test |
Standard | 48.3*3.25*4000mm |
Ledger | 48.3*3.25*3072mm |
Ledger End | 1.2kg |
Advantages
1)To be erected easily and quickly
2)Installed to different angels with rosettes of
two different hole being positioned there
3)Ringlock scaffolding provides complete flexibility to lock in any angel.
4)Diagonal braces are to be tailored in
accordance with the lengths of vertical and horizontal tubes
Specification of Ringlock Scaffolding
The Standards(Verticals) | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
3000 | 3/3.25 | 48 | HDG/Painted | |
2500 | 3/3.25 | 48 | HDG/Painted | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1500 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
500 | 3/3.25 | 48 | HDG/Painted | |
The Ledgers(Horizontals) | ||||
Effective Length(mm) | Tube Thickness(mm) | Tube Diameter | Surface Treatment | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1770 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
The Diagonal Brace | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
2411 | 3 | 48 | HDG/Painted | |
2244 | 3 | 48 | HDG/Painted | |
The bracket | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
730 | 3 | 48 | HDG/Painted | |
Plank | ||||
Effective Length(mm) | Width(mm) | Height(mm) | Surface Treatme | |
2050 | 480 | 45 | HDG | |
1820 | 480 | 45 | HDG | |
3000 | 240 | 45 | HDG | |
2000 | 240 | 45 | HDG | |
1000 | 240 | 45 | HDG | |
Hollow Head Jack And Jack Base | ||||
Length(mm) | Tube Diameter(mm) | Size of Plate(mm) | Surface Treatment | |
600 | 38 | 150*120*50*4 | HDG | |
600 | 38 | 150*150*4 | HDG |
Accessories
Packing
Inspection
Project
More Photos
- Q: Bowl buckle type steel pipe scaffold and fastener type scaffolding comparison, which is good stability
- Check the overall stability of the bowl - shaped steel pipe scaffolding, the current test is not enough (still in progress)
- Q: I have been siding my house using pump jack scaffolding on wood poles. I am at a second floor section that is located over a pitch roof. Is there a safe way to mount poles on top of pitch roof to finish this section?
- At that height you need support beams, scaffolding alone won't cover it.
- Q: in the safety scaffolding?
- If your talking about jobs, try Gladstone in Queensland or Karratha in WA. Plenty of jobs in safety and scaffolding there. Otherwise I don't know what you mean.
- Q: I've pierced my ears a few times myself, but never through the cartilage.I want to know from anyone who has a scaffold piercing, if it hurts?Cause I'm getting it done in 25 days.Thanks in advance x
- yes i would give it a 5 out of 10. well worth it! For americans that don't know.... she is talking about an industrial piercing it's called a scaffold piercing in the UK.
- Q: Everybody calls it either one, i want the one that goes across the top of your ear. Would it be safer to have two helix done instead of putting the bar straight in and getting the actual piercing or should i get two helix and put a bar in once it has healed? i would ask the piercer to line the two up. ive heard that industrails go wrong alot if a bar is put right in.
- As long as the bar's the correct length (long enough to accomodate a little bit of swelling, but not too long), and you have a good piercer, you shouldn't have a problem. Getting two and then changing to a bar later also costs twice as much money :P
- Q: Can the horizontal bar of the bowl buckle scaffold be oblique, the vertical position of the vertical bar is a parallelogram, not square
- If it is possible to form a honeycomb hexagon (with an angle of 120 degrees)
- Q: Okay well it's been 4 weeks now and I think that the front part is infected I'm not sure. But just next to the piercing there's a bump in my ear and puss comes out, but it's not that much. How can I tell if it is infected? And if it is, is there anything I can do about it? Thanks. :)
- It may be getting infected, I would just put alchoal on a Q-tip and rub it on at night and in the morning. Good luck (:
- Q: Why do a mobile tower scaffolds have wheels fitted with brakes?
- So it can be partially assembled, moved into position, then the brakes are put on so it doesn't move while it's in use.
- Q: The role of scaffolding and the basic requirements for scaffolding
- 1, to have enough firmness and stability, to ensure that during the construction of the specified load and climate conditions, no deformation, tilt and shaking2, to have enough area to meet the requirements of material, transportation, operation and walking3, the structure should be simple, erection, demolition and handling to facilitate
- Q: above the ground by pulling on a rope weighting 6lb/ft. Set up the integral of how much work is required ( only the integrand)? Let x denote the height above ground.What is the total work?
- Integral 0 to 85 [440 +(85-x)]x dx
Send your message to us
Construction Ringlock Scaffolding Easy Assembly Top Quality Metal
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords