• Ring Lock Scaffolding For Construction System 1
  • Ring Lock Scaffolding For Construction System 2
Ring Lock Scaffolding For Construction

Ring Lock Scaffolding For Construction

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:
Tianjin China (Mainland)


Model Number:
RL-YP-500
Tube size:
OD48.3x3.03.5mm
parts:
Diagonal Brace,Ledger (horizontal),Standard (vertical)
surface:
galvanized ,painted

Packaging & Delivery

Packaging Detail:BUNDLE
Delivery Detail:30 DAYS

Specifications

Quick Lock Scaffolding For Sales
1.Q235
2.Tube size OD48.3x3.0-3.5mm
3.galvanzied


Q: An 800N painter stands 3.00m from the left end of a scaffold that is 4.00m long. The uniform wooden scaffold weighs 100N and is hung by a chain at each end. What is the tension in each chain?A uniform meter stick weighs 25 N. An 80 N weight is hung at the 20.0cm mark. A 70.0N weight is hung at the 90cm mark. what is the magnitude of the upward force needed to balance the meter stick?Please help! I have a huge exam on these and my teacher wouldn't help me! I am so stumped please help!
Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
Q: left end. What is the Tension in EACH wire??can anyone help
And you asked this physics question in the math section of answers because? Let Tl and Tr be the tensions in the left and right wires. We are told the weight of the box is W and that the scaffold is weightless.
Q: There are three instances (hester alone, dimmesdale at night and the last time) and itd be reallllly great if someone could help me find quotes :)
I Yahooed it and got plenty of quotes so try 'Scarlet Letter + scaffold'.
Q: how much does a scaffolding business earn a year?
Given the collapsing housing and construction sectors of the economy, it's highly likely that few if any scaffolding companies are making so much as pennies these days.
Q: Bowl buckle type steel pipe scaffold and full fastener type scaffolding are long what kind of? What is the difference
Fastener type scaffolding is composed of shelves and fasteners, and the bowl buckle scaffold is made up of the bowl buckle, the lower bowl buckle, cross bar joints, vertical rods, beams and other components, the method of building some differences
Q: Scaffolding and scaffolding, what is the difference between manufacturers, there is no professional answer?
Scaffolding and scaffolding, there is a big difference, manufacturers only than the ordinary user to better understand the scaffolding characteristics.
Q: how can you tell is a scaffolding piercing is infected?
Excessive redness extending well beyond the piercing area, hot to the touch, yellow/green pus with an odor.
Q: Im wondering what scaffolding means because my husband is going to louisiana to go work quot;scaffoldingquot; and i was wondering what they do
Scaffolding is the framework of metal tubes and wooden planks which is built up around a building, so the workers can stand safely.
Q: im in the midwest
we bought 9' planks here in AZ. and paid $50.00 each. pressure treated and a bolt thru them, they are $65.00
Q: Im going to get a scaffold.how much are they and 1 being no pain and 10 being the worse what would be your rate on the pain 1-10
I would say about a 6 maybe 7... and its a pain for the first few months.. like it gets sore if you lay on it to much ect :)

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords