Ring-Lock Scaffolding System and Accessories
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 400 pc
- Supply Capability:
- 40000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Ring-lock Scaffolding
Ring-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections.
It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.
2. Main Features of Ring-lock Scaffolding
Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.
Avoid using bolt in assembly and low down labor intensity.
Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal.
Not easy to lose fastener, portable firm and easy to maintain and transport.
3. Ring-lock Scaffolding Pictures
4. Ring-lock Scaffolding Specification
There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar 5 times fast of adapter plug assembly and disassembly than normal
Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage.
5. FAQ of Ring-lock Scaffolding
What promises can be done by us?
If interested in Ring-lock system, please feel free to write us for any QUOTE.
If printing required, please advise asap because the whole set need much more time to complete.
Please DO check goods when courier knocks your door and contact us asap if any issue.
- Q:Japan SS 03 scaffolding system advanced
- Is a new type of scaffolding, the product was introduced in Europe in the last century in 80s, is the upgrading of products after the bowl buckle scaffold. Also called chrysanthemum disc scaffolding, scaffold system, disc scaffolding system, buckle disc scaffolding, layher frame (layer frame, Lei Ya frame, because the basic principle of the scaffold is by the German LAYHER (Lei Ya)'s invention, the industry has been called the "thunder sub frame". The utility model is mainly used for a light frame and a background frame of a large-scale concert Disc type multifunctional scaffolding, after the bowl buckle scaffold after the upgrading of products. The socket diameter of 133mm scaffold, 10mm thick disc, 8 hole disc, adopting 48*3.5mm, Q345B pipe master component, the vertical rod is in the pipe length of every 0.60m welding on a disc, rail connection using this novel and beautiful disc, the bottom with the connecting sleeve. The cross bar is made of a plug with a plug welded on both ends of the steel pipe.
- Q:I am doing a resource in class about the benefit of bamboo scaffolding and I can't find anything where in the us that it is used?
- I suspect that it doesn't meet the requirements of OSHA.
- Q:Is there any reason why you shouldn't?
- They will have a shorter life than decking as they won't have been pressure impregnated. But a very good idea, though. Treat it with Cuprinol (if you have a local, friendly timber yard they might have a pressure impregnator and then you're laughing.)
- Q:Ariel Atom Supercar, Hypercar or a just a bunch of scaffolding?
- No such thing as a Hyper car. It is a Sports car. It does not even classify as a Supercar because its top speed is around 125mph. A Supercar's top speed is 185mph+. A high-end sportscar is 155mph+ A regular sports car is 130mph-155mph. I am counting the Ariel as a sportscar because of its quick acceleration. It is a great car. Very fun to drive. Lasts forever with the Honda Civic engine that it has. It is an exciting car.
- Q:A window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 210 N and is 3.30 m long. What is the tension in each rope when the 690 N worker stands 2.30 m from one end?______ N (smaller tension)______ N (larger tension)
- assuming the scaffold is uniform weight, take moments around 1 end to get the tension in the rope of the other the ∑M = 0, take the rope tension direction as positive 690 x 2.3 + 210 x (3.3 / 2) = T1 x 3.3 T1 = 586N Now moments around the other end 690 x (3.3-2.3) + 210 x (3.3/2) = T2 x 3.3 T2 = 314N You can check your answers as ∑F = 0, so 586 + 314 - 210 - 690 = 0
- Q:Normally scaffolding platforms are for climbing working safely at heights more than 2 m and are erected by approved scaffolders and inspected safe for use . so why should one need safety harness a mandatory PPE?I See it as a only a proactive approach but is there a international standard which specifies it as a mandatory ppe?
- Navy blue feathers.
- Q:Why do a mobile tower scaffolds have wheels fitted with brakes?
- So it can be partially assembled, moved into position, then the brakes are put on so it doesn't move while it's in use.
- Q:The difference between bowl buckle scaffold and fastener scaffold
- Scaffolding classificationScaffolding is a temporary structure frame for the construction, installation and construction of materials, materials and construction operations.1 according to the materials used: divided into wooden scaffolding, steel scaffolding and ladders.2 according to whether it can be moved: divided into mobile scaffolding and fixed scaffolding.3 according to the nature of the construction: divided into construction scaffolding and installation scaffolding.
- Q:I've been wanting an industrial piercing for quite a while now, and thankfully I convinced my parents to let me get it done about two weeks ago. We were on vacation in Florida last week and my mom said I could get it done there if I wanted, so we went into a tattoo shop and asked about it. They told me something I'd never heard before, that they would pierce the holes with hoops and in about a month I could put the barbell in. The piercers told me it would heal a lot easier this way and if the barbell was put in right away I'd end up taking it out because of the pain. This makes sense of course, but I have NEVER heard of it being pierced this way, and once the holes heal, won't they be off in aligning the bar with the piercings, causing me even more pain?They told me if I get it pierced in my home town to tell the piercer to do it the way they suggested but I'm not sure at all. I could take the pain if that was the only issue, but if it would heal better.. I'm not sure. Help? Thanks!
- Stretching shouldn't hurt if you're giving it enough time... so this really isn't a good comparison! A single cartilage piercing doesn't hurt much more than your standard earlobe (lobe being 2, cartilage piercing being 3 on a scale of 1 to 10). But I've never had a scaffold or orbital of any kind, so I don't have much first hand experience. Honestly though I wouldn't worry about it. It will be over in 30 seconds, 1 minute tops. And you get to come away with a pretty new piercing! Yay!
- Q:How to calculate the amount of steel pipe in the bowl buckle scaffold formwork system? What is the good software or experience of the eldest brother?
- Probably on the line. The number of entry sized frame. In the actual construction, workers will be more skilled are arranged according to the room.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Ring-Lock Scaffolding System and Accessories
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 400 pc
- Supply Capability:
- 40000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords