Ring Locked Scaffolding of High Workplace Safety
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 1000000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Ring-lock Scaffolding
Ring-lock Scaffolding consists of cup-lock connector, post, cross bar, diagonal brace, base and top brace. Safe and convenient to operation, fast to assemble and dismantle, widely used in scaffolding construction, such as formwork scaffold and fitment construction.
It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.
2. Main Features of Ring-lock Scaffolding
.Each Ring-lock is welded on post every 0.6m. Choose step pitch based on mechanical requirements
.When installing the scaffolding, insert ledger connector into the pole of the cup-lock, then hammer ledger connector to finish fastening
.The more load, the more reliable fasten
.Ring-lock Scaffolding has no special retaining member and no active parts. It’s easy and convenient to operation with integral low costs
3. Ring-lock Scaffolding Images
4. Ring-lock Scaffolding Specification
.Buckling resistance: 2KN.M when concentrate load on cantilever and 6-9KN.m when evenly distributed load
.Design load of cross bar
.Design Lord of base:Pmax=60KN
5. FAQ of Ring-lock Scaffolding
1) What can we do for you?
We can ensure the quality of the vinyl banner and avoid extra expenses for customers.
.We can provide you the professional design team.
.We can provide fashionable and newest styles for you.
.We can design the artwork for you.
. Please feel free to customize.
2) What promises can be done by us?
. If interested in Ring-lock Scaffolding, please feel free to write us for any QUOTE.
. If printing required, please advise asap because the whole set need much more time to complete.
. Please DO check goods when courier knocks your door and contact us asap if any issue.
3) What about of our after-sale service?
. Response will be carried out in 24hours after receiving any complain or request.
. Frame-Connected Scaffolding cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: As Customer's Requirements
.Shipping: We have various shipping ways for our customers, such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.
.Shipping time:
Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days.
Other mass qty of Ring-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.
- Q: How much is the price of the bowl buckle scaffold
- The average price of 150 yuan / ton / month, bowl buckle scaffolding rental costs of -3 minutes / M / day, different regions, different prices.
- Q: Hello, in a Construction project who is required to check the scaffolding equipment?check the installation? and frequently check the scaffold during the day?is it the Planning supervisor, Contractor, Principle contractor, CDM coordinator or Works manager
- Each construction site is supposed to have a Safety Officer. If that is not the case...The superintendent of the company using and supplying the scaffolding need to comply with OSHA standards at the minimum. The primary contractor will be somewhat responsible to ensure things are properly inspected. The Army Corps Of Engineers insist that the scaffolding be inspected each day prior to use. Should an accident happen you need to make sure all sub-contractors have proper general liability and workers comp insurance. Otherwise total responsibility goes to the primary contractor.
- Q: I Got It On The 16th Of Feb This Year, I'm 14 Year's Old, So Don't Laugh, Okay I Can't Unscrew The Ball Things And How Long Does It Take To Heal Fully? __Ciara-Chemical__
- Thats an awesome piercing, nice job! I'm not laughing about being unable to unscrew it - I have a piercing in my pinna I've never been able to get out - had it for like 6 months. What I will say it that you shouldn't be taking it out yet really anyway. If you wash it in sea-salt and warm water once a day it should be almost totally healed in 8 weeks, which is still about two weeks away if you got it on the 16th Feb. Even then for the first 6 months or so it'll close pretty quickly (not in like an hour or anything, but it could get tighter in as little as 3 or 4 hours), so you should try to leave it in all the time for that 6 month period.
- Q: this work wont start till tuesday and the scaffold has blocked my sky tv. am i within my rights to remove this scaffolding?
- No you are not within your rights to remove the scaffolding. Call the landlord to see if anything can be done. Or you could read, go for a walk. It is not the end of the world to not have tv.
- Q: So I have 2 paws on my wrist and had my belly done years ago as well as my ears. Now im interested in getting a scaffold piercing but ive been told it hurts, a lot! im not too botherd about the pain cause I know there will be something good at the end but can you tell me more?
- I didn't think it hurt at all, but what sucks about this particular piercing is that your hair always gets stuck in it and it gets infected really easy. I think it was more painful actually having it than getting it done.
- Q: I got my scaffolding piercing yesterday (a bar through the cartilage) and when i woke up this morning there was quite a lot of blood, i mean like there was big clumps of it around the holes. I've cleaned it up and it seems to look okay and it isn't any more painful than when i got it done yesterday. Is this normal?Thanks (:
- well when i got my lip pierced idk if this is the same thing but when i woke up the next morning there was blood on my pillow, my face, and running down my neck and now its fine just be sure to clean it every day and it should be fine
- Q: A scaffold of mass 69 kg and length 5.5 m is supported in a horizontal position by a vertical cable at each end. A window washer of mass 79 kg stands at a point 1.0 m from one end.(a) What is the tension in the cable closer to the painter? (b) What is the tension in the cable further from the painter?
- Closer to the window washer ... T = 168 N ... Farther from the window washer ... T = 75 N ...
- Q: In the settlement, there are also iron welded steel pipe welded pipe unit price information price, should I be in the settlement in which unit pricing is reasonable? What is the difference between these two materials? Can provide a better basis for authority. Thank you
- Safe and reliable: the joint design, taking into account the upper bowl buckle spiral friction and self gravity, so that the connector has a reliable self-locking capacity. The load acting on the cross bar is transferred to the vertical rod through the lower bowl buckle, and the lower bowl buckle has a strong shearing force (the maximum is 199kN). Even if the upper bowl buckle is not pressed, the joint of the cross bar is not caused by an accident. At the same time equipped with a safety net support, inter bar, foot board, block board, ladder. Pick up the beam, wall support and other rod accessories, the use of safe and reliable. 6 easy to process: the main component with 48 *, Q235B welded steel pipe, the manufacturing process is simple, the cost is moderate, can directly on the existing fastener type scaffolding processing transformation.
- Q: How to calculate the amount of steel pipe in the bowl buckle scaffold formwork system? What is the good software or experience of the eldest brother?
- Probably on the line. The number of entry sized frame. In the actual construction, workers will be more skilled are arranged according to the room.
- Q: above the ground by pulling on a rope weighting 6lb/ft. Set up the integral of how much work is required ( only the integrand)? Let x denote the height above ground.What is the total work?
- tie 3 concrete blocks to the end of the rope and let that bucket fly up = let gravity do the work
Send your message to us
Ring Locked Scaffolding of High Workplace Safety
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 1000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords