• Ring-lock Scaffolding,Superior Quality, Best Saling System 1
  • Ring-lock Scaffolding,Superior Quality, Best Saling System 2
  • Ring-lock Scaffolding,Superior Quality, Best Saling System 3
Ring-lock Scaffolding,Superior Quality, Best Saling

Ring-lock Scaffolding,Superior Quality, Best Saling

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 pc
Supply Capability:
30000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Main Description of Ring-lock Scaffolding:

 

  • Ring-Lock Scaffolding System consists of hot dipped galvanized steel pie and modular components that are assembled together using integral wedge connectors. ADTO ring-Lock system is a modular scaffold system which can provide major saving in labor cost while meeting the demands for safety, ease of handling and reductions in maintenance.


2. Main Futures of Ring-lock Scaffolding

 

  • Standard:  Made of 48mm O.D. x 3.2mm thickness high grade steel tube, 1 discal leg 0.5meter, Length: 3000, 2500, 2000, 1500, 1000,  500mm etc.

  • Ledger: Made of 48mm O.D. x 3.2mm thickness high grade steel tube, length800mm/ 1500mm, length can be ordered.

  • Ring: Made from cast-steel or pressed steel.

  • Ledger connection-peg: made from cast-steel.

  • Base screw jack: length 600mmx3.5mm thickness strength tube, length to be order, solid tube available.

  • U head screw jack: length 600mmx3.5mm thickness strength tube with U head plate, length can to be order, solid tube available.

  • Surface: painted/electro (hot dipped) galvanized or to be order.

  • Also can be customized.

 

3. Detailed Pictures about Ring-lock Scaffolding

 

 

Ring-lock Scaffolding,Superior Quality, Best Saling

 

 

 

Ring-lock Scaffolding,Superior Quality, Best Saling

 

4. FAQ

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        

 

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.


Q: Found two different bowl buckle scaffold specification JGJ166-2008
Are you sure is a type steel pipe scaffold? Steel pipe is a fastener link
Q: I got mine done this morning, and like the dumba** I am, I got it on the side that I sleep on. A friend of mine said she slept on hers the first night and didn't hurt and it was fine, but I don't believe that to be true. If I have to sleep on my other side, I could but it's very hard for me to fall asleep like that, and I often switch positions while asleep unconsciously. Any tips?
Invest in a travel pillow that looks like a donut. That way when the side of your head is touching the pillow your ear can be in the center of it and you're not putting pressure on the piercing as it is healing. If you have a bigger bed and roll from one side to the other, get two.
Q: Another from the ministry of silly questions…I’d like to support a lightweight tarpaulin over my back yard. Single slope, high side attached to the house and low side attached to a scaffolding pole, running horizontally between two walls. Fair weather, no high winds or pooling. The run of pole would be 8 meters. The longest poles seem to be 6m, so I need to use a coupling. Will this be strong enough – ish? I imagine the most stressed point would be just around the edges of the coupling, so If I used two joints/couplings in the bar, wouldn’t I half the strain on a single one?Also if I made the joints at 1m and 7m would that be better than to have a joint in the middle where the most flexing will be?Also bit more expensive, but with Aluminium the bar will be 20kg lighter – buy will it be as strong joint wise?Will a tubular coupling be as good as a external one?If anyone knows.. Thanks!
The problem with your proposal is that you realise that the wind/rain could have an effect but chose to ignore the consequences if it occurs. 'Proper' scaffolding is designed and such an unsupported span would never occur in a 'normal' scaffold so the standard calculations would not work. There is also the possible effect on the walls, could they take an abnormal load? I would look at theatrical or music stage hire using trussed beams.
Q: manufacturers recommendation for assembling Web-Tex 8' Scaffolding
you can also search the inter for the best supplier of that product......
Q: is it safe to get an industrial/scaffold and weaving piercing at the same time?
It's not SUPER dangerous, but I wouldn't recommend getting them at the same time.
Q: A scaffold of mass 69 kg and length 5.5 m is supported in a horizontal position by a vertical cable at each end. A window washer of mass 79 kg stands at a point 1.0 m from one end.(a) What is the tension in the cable closer to the painter? (b) What is the tension in the cable further from the painter?
Closer to the window washer ... T = 168 N ... Farther from the window washer ... T = 75 N ...
Q: I live on the second floor of an apartment building the scaffolding is all around the windows. When the men are working, they are just a few feet away! It's awful. Anyway to find out when this hideous mess will come down?
Well on every building that has construction on it there's a little section that he paper work and permits all over it ( usually at street level) so I'm going to guess if you can obtain the constructions companies phone number from those paper you can call and ask when the scaffolding is coming down.
Q: Tell me how much the shear strength can reach MPa, thank you
The type of steel pipe is 48 * 3, and the wall is made up of 2 steps and 3 spans, the vertical distance is 3.60 meters, and the horizontal distance is about 4.50 meters. Construction live load is 3.0kN/m2, taking into account the 2 layer construction. The bamboo scaffold board piece, load 0.15kN/m2, calculated according to the laying of 13 layers
Q: How much is the erection height of double row scaffold
It is true that the bowl buckle scaffold and the steel pipe scaffold height requirements are different, and the single row scaffold and double row scaffold are also different.
Q: Why not connected with the bracket or arch construction scaffolding
Not connected with the bracket or arch construction scaffolding, because the first construction scaffolding removed after the completion of the project, and to support or arch structure to a certain strength to remove the solidification.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords