QTZ80(TC5513a) tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ80(5513) tower crane tower crane is novel hoisting and conveying machinery which is designed by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the rated lifting moment of 710kN•m and the maximum lifting moment of 853.2kN•m. All the performance parameters and technical indexes of the crane meet or surpass national standards.
The crane features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many construction enterprises.
The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
Amplitude(m) | 3-13.6 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 |
Lifting capacity(kg) | 4000 | 3890 | 3618 | 3380 | 3170 | 2860 | 2810 | 2660 | 2530 | 2400 | 2290 |
Amplitude(m) | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 |
Lifting capacity(kg) | 2190 | 2090 | 2000 | 1920 | 1850 | 1770 | 1710 | 1650 | 1590 | 1540 | 1490 |
Amplitude(m) | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 |
Lifting capacity(kg) | 1440 | 1390 | 1350 | 1310 | 1270 | 1230 | 1200 | 1170 | 1130 | 1100 | 1070 |
Amplitude(m) | 46 | 47 | 48 | ||||||||
Lifting capacity(kg) | 1050 | 1020 | 1000 |
(2)2-magnification Lifting Performance Table
Amplitude(m) | 3-26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 |
Lifting capacity(kg) | 2000 | 1920 | 1850 | 1770 | 1710 | 1650 | 1590 | 1540 | 1490 | 1440 |
Amplitude(m) | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 |
Lifting capacity(kg) | 1390 | 1350 | 1310 | 1270 | 1230 | 1200 | 1170 | 1130 | 1100 | 1070 |
Amplitude(m) | 46 | 47 | 48 | |||||||
Lifting capacity(kg) | 1050 | 1020 | 1000 |
Technical Performance Parameter Table
Item | Unit | Magnification | ||
α=2 | α=4 | |||
Rated lifting moment | kN.m | 500 | ||
Maximum lifting capacity | t | 2 | 4 | |
Working amplitude | m | 3 ~48 | ||
Maximum amplitude lifting capacity | t | 1.0 | ||
Lifting height | Independent | m | 30 | |
Attached | m | 120 | ||
Time of moving outrigger end to rotation center | m | 48.74 | ||
Time of moving balance arm tail to rotation center | m | 12.816 | ||
Counter weight | t | 7 | ||
Total motor power | kW | 24.9 | ||
Allowable working temperature | 0C | -20~+40 |
- Q:I'm looking for estimate including installation, vertical support beams, and bus bars. Details: rectangular shaped building 500 ft long split lengthwise into two sections. 500ft X 4lengths of craneways is 2000ft. The crane runways are bolted to building frame but are self supporting on I-beams (104 vertical supporting beams X 24ft. height). The crane runways can support 10ton hoists. The bus bars (electrical conductor assembly) run along all (2000ft) of crane runways.
- the only 5'6 girl I know of who did runway was Devon Aoki. Everyone else is at least 5'9+ except Kate Moss who is 5'7.5. The average height for runway is 5'10
- Q:dimentions of crane rail, crane beam.
- What kind of crane? There are thousands of types.
- Q:Two Cranes have been sitting on nest for about 50 days. Will these 2 eggs hatch. They will not leave. It is their 3 Clutch. The first one resulted in a baby colt, but it got hit by car. The second never hatched.
- What species of crane? Sandhill cranes have an incubation time of around 30 days, do you know the exact day of egg laying? Are you sure they haven't hatched and they are sitting on chicks? If you are getting close enough to the nest to see eggs or chicks, you might be too close and could be interfering with their natural behavior, unless they are captive or you are using a blind. You mentioned their chick being hit by a car, so if they are nesting that close to people, they may be nervous and are flushed from the nest too often to keep the eggs the right temperature. It's hard to say without more information. Edit: Extra cold weather can damage the eggs. It does seem like they've lost this clutch-50 days is long past when they should have hatched. They may be trying to incubate them anyway, I haven't worked directly with sandhills, but other birds that I've conducted nest monitoring studies on have sometimes sat on nests a while past when the eggs should have hatched. Hopefully this is actually their fourth clutch and you missed the removal of the third clutch. Good luck!
- Q:I need to know exactly how much weight they can lift also how much do they weight?how long is thier life-time?in what temprature they can work?does mosture do any harm to them?for installation , do they need foundation?the exact height and width?
- You need to be more specific. The lifting capacities for container cranes varies significantly, as does any other crane. Some of the variation is based purely on load (horsepower) availability; some is based on speed (rpm) for lift/drop portions of the cycle. Cranes like these operate year-round, at ports all over the world. Some ports have average ambient temperatures in the range of 45 C, with highs up to 60 C. Others can be as low an average as 10 C, with a low peak as much as -50 C. Moisture will, over the long haul, harm them - they're metal constructs, and thus are prone to oxidation. Using corrosion-resistant materials and/or coatings will certainly prolong their usable lifespan. The crane drives (electric motors and power electronics) are also susceptible to moisture and other contaminants. All true dockside cranes require some sort of permanent foundation; it's usually part of the pier construction itself. However, there are portable cranes that operate without one. There is also more than one crane manufacturer out there - all will have their trade secrets that will make each look a little different than the rest. It will generally also reflect in their operation parameters, and in their expected life cycle.
- Q:QTZ63 (Q5610) tower crane power, how many power parts, name, model specification, product number, date of appearance
- All the details of the equipment are availableAs for power, it depends on the specific configuration of the frequency conversion and non frequency conversion will not be the same
- Q:why are siberian cranes endangered?
- The traditional migratory and wintering habitats of this species are under constant pressure from the demands of the growing human population. These include: agricultural development, wetland drainage, oil exploration, hunting, and water development projects. The western population is primarily threatened by hunting whereas the eastern population is at risk from loss of wetland habitat.
- Q:What do the words neck-craning and neck-straining mean in the sentence below?Sports cars are often designed to make a statement, and many of the newest models do that with neck-craning styling and neck-straining performance.
- the ''neck craning'' styleing referrs to the fact that the car is so beautifull that people can't help but look at it. the ''neck straining'' in the context of this sentence referrs to the fact that the car is so powerfull it can hurt your neck muscles with the torque and the G forces.
- Q:What prior education and skills are needed to become a Crane operator ?
- A basic education is required, no need for major courses. Skills however is developed through training. One is communication skills using a radio. Because crane operators have a partner called rigger, who overlooks the movement of crane below while telling instruction to the crane operator. Another skill is synchronization. Crane operators should possessed good movement synchronization and operation of levers and buttons inside his cabin. Another is good eyesight. Lastly, safety skill. Operators should know the capacity or the equipment he is operating and the calibration of the machine he is using.
- Q:Building a new skyscraper? Tearing down the old Mellon Arena?
- PITTSBURGH -- Construction is continuing downtown on the new, 30-story Three PNC Plaza, which is scheduled for completion later this year. On Saturday, a giant crane from Philadelphia was brought to the construction site on Fifth Avenue to hoist massive steel girders into place. The girders weigh more than 89,000 pounds and will support a third-floor ballroom.
- Q:i need six colors mentioned in the story and wat each one means thanks :)
- From: The Open Boat By Stephan Crane. These waves were of the hue of slate... ...save for the tops, which were of foaming white... In the wan light, the faces of the men must have been grey. ...the color of the sea changed from slate to emerald-green... ...wild with lights of emerald and white and amber. ...near patches of brown seaweed... ... at the men with black bead-like eyes. ... marked by dingy clouds, and clouds brick-red, ... Ain't they peaches? A faint yellow tone came into the sky over the low land. ... a small bluish gleam on the edge of the waters. ... with a sky of pure blue...
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
QTZ80(TC5513a) tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords