QTZ80(TC5513AS) tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ80(5513AS) tower crane tower crane is novel hoisting and conveying machinery which is designed by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the rated lifting moment of 710kN•m and the maximum lifting moment of 853.2kN•m. All the performance parameters and technical indexes of the crane meet or surpass national standards.
The crane features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many construction enterprises.
The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
Amplitude(m) | 3-13.6 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 |
Lifting capacity(kg) | 4000 | 3890 | 3618 | 3380 | 3170 | 2860 | 2810 | 2660 | 2530 | 2400 | 2290 |
Amplitude(m) | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 |
Lifting capacity(kg) | 2190 | 2090 | 2000 | 1920 | 1850 | 1770 | 1710 | 1650 | 1590 | 1540 | 1490 |
Amplitude(m) | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 |
Lifting capacity(kg) | 1440 | 1390 | 1350 | 1310 | 1270 | 1230 | 1200 | 1170 | 1130 | 1100 | 1070 |
Amplitude(m) | 46 | 47 | 48 | ||||||||
Lifting capacity(kg) | 1050 | 1020 | 1000 |
(2)2-magnification Lifting Performance Table
Amplitude(m) | 3-26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 |
Lifting capacity(kg) | 2000 | 1920 | 1850 | 1770 | 1710 | 1650 | 1590 | 1540 | 1490 | 1440 |
Amplitude(m) | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 |
Lifting capacity(kg) | 1390 | 1350 | 1310 | 1270 | 1230 | 1200 | 1170 | 1130 | 1100 | 1070 |
Amplitude(m) | 46 | 47 | 48 | |||||||
Lifting capacity(kg) | 1050 | 1020 | 1000 |
Technical Performance Parameter Table
Item | Unit | Magnification | ||
α=2 | α=4 | |||
Rated lifting moment | kN.m | 500 | ||
Maximum lifting capacity | t | 2 | 4 | |
Working amplitude | m | 3 ~48 | ||
Maximum amplitude lifting capacity | t | 1.0 | ||
Lifting height | Independent | m | 30 | |
Attached | m | 120 | ||
Time of moving outrigger end to rotation center | m | 48.74 | ||
Time of moving balance arm tail to rotation center | m | 12.816 | ||
Counter weight | t | 7 | ||
Total motor power | kW | 24.9 | ||
Allowable working temperature | 0C | -20~+40 |
- Q: I work in downtown Atlanta, and they are doing some kind of work on top of one of the high rise buildings downtown with a big crane. I was wondering how they got that heavy of a crane there to begin with? Thanks ahead of time!
- The tower crane is build on sections of steel structures from ground level, they build much higher than needed, so the protuding section at the top that houses the crane do not need to be removed all the times, that probably explains the cost of building. They probably start to remove the protuding section when it reaches a height which is easy for machinery to access.
- Q: How come you never see cranes being transported from one site to another?
- Of course you see cranes transported from site to site, you just do not know what you are looking at.
- Q: Do you find it ironic a crane crashed into Mecca's holiest mosque on 9/11?
- Looks like the Karma Bus made a stop in Mecca.
- Q: Between these two authors, I dont see any similarities in literary style, specifically focusing on The Moon is Down and The Red Badge of Courage. Maybe observing from a different point of view (yours) could help me.Also, if there is no significant similarity, do similarities exist in setting, conflict, or characters instead?Thanks!
- Try Maggie: A girl of the streets, which is the novel I think of for Crane being part of the Realist school. I think you can also see Steinbeck, in his selection of subjects as being in that same school of fiction. So less for their style and more for their choice of subjects.
- Q: Tower crane technical condition GB/T 9462-1999 has been cancelled? If so, what is the new standard?
- Standard number: GB/T 5031-2008Standard Name: Tower CraneStandard status: currentAlternatives: instead of GB/T 17806-1999; GB/T 17807-1999; GB/T 5031-1994; GB/T 9462-1999This standard specifies the nomenclature, classification and identification, technical requirements, test methods, inspection rules, information identification, packaging, transportation and storage, installation and climbing, and inspection of tower cranes.
- Q: How to build a strong paper crane?
- Fact: paper is relatively strong when you pull on it, but when you push on it, it easily crumples. Build your crane out of several bars. Bars that are being pushed upon by the weight need to resist the crumpling. A good way to do this is to roll a sheet of paper into a tube form to make the bars. Bars that are only being pulled on don't need to be more than a sheet of paper. A frame cranes are simple to make: www.lni.wa /wisha/rules/generalsafety/images/24_d2_a-frame.gif
- Q: i just kept distracting his attention but i cant do anything else, what do i do with the crane??? how can i lose the ball???
- i have it for console but what you do with that is this. When he does a big slam after chasing you make sure he does it in the cement area, then go to the crane and it cutscenes to you hurting him. Then you will follow him some more to a car shop. He throws cars at you, when he does a big slam sparks from his back disappear (they were caused by the crane) jump on his back and keep smashing him till he falls on his back, then just repeat that and watch a cutscene of his defeat.
- Q: I have learned how to make crane but I just can't! I've watched about 6-7 videos for it and i still don't get it!
- If that doesn't help at all , try pictures with words . Here are my two favourite sites . They have good instructions and pictures . Really simple to understand .
- Q: What kinds of concrete are there in construction crane? Mainly for the construction of this area ~ ~ ~!There is no lifting machinery issued by the state what ~ ~ which detailed description of the construction machinery lifting what?
- National and trade standards for construction and lifting machineryStandard number, building lifting machinery, national and trade standard nameGB 6974.9-1986 lifting machines -- Nomenclature: Tower CranesGB 6974.1-1986 lifting machinery terminology - lifting machinery typeGB 6974.2-1986 lifting machinery terms - main parametersGB 6974.3-1986 lifting machines - Terminology - General conceptsGB 6974.4-1986 lifting machinery terms - bodies and other componentsGB - 6974.5-1986 lifting machines - Terminology - safety indicating devicesGB 6974.6-1986 lifting machines -- Terminology -- mobile cranesGB 6974.7-1986 lifting machines -- Terminology -- Railway CranesCranes; cranes; GB; 6974.8-1986; terminology; floating cranesGB 6974.9-1986 lifting machines -- Nomenclature: Tower CranesGB 6974.10-1986 lifting machinery terms - portal cranesCranes; cranes; cranes; GB; 6974.11-1986; terminologyCranes; cranes; GB; 6974.12-1986; terminology; bridge cranesGB 6974.13-1986 lifting machines -- Terminology -- gantry cranesGB 6974.14-1986 lifting machines -- Terminology -- cable cranes
- Q: do they start with the crane house and keep adding sections underneath it? Or do they build they tower and then somehow top it with the actual crane?
- I'm sorry, but there is no way that a crane can lift another section of itself up in the manner described by the first person (lift another 20-foot mast section into the gap opened by the climbing frame). Can you lift yourself off the ground by pulling up on your own collar? I was told that the crane is jacked up from the bottom, and they slide another section below the jacked up crane. Then they lower and bolt the crane to the new section that was inserted under the bottom.
Send your message to us
QTZ80(TC5513AS) tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords