Prestressed Floorboard with Steels for Roof
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 5 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Prestressed Floorboard with Steels for Roof
1. Structure of Prestressed Floorboard with Steels for Roof :
Products of this series (non-circular and circular cored) are the ideal machines for making building materials on constructions of large span and heavy load bearing in factories, schools, hospitals, shopping centers, office building and homes.
Our hollow core slab machines have the advantages of reasonable design, easy operation, convenient maintenance and long working life. Slab length can be achieved to 4.2m to 18m; width of 600mm, 900mm and 1200mm; thickness of 120mm, 150mm, 180mm, 200mm, 250mm, 300mm, 380mm.
The hollow core slab machines are working on the long-line table, tensioning the high-strength and low-relaxation steel strand first, and using the pushing work method to form the concrete hollow core slab. The slabs which being formed have the advantages of smooth surface and high-density structure.
2. Main Features of Prestressed Floorboard with Steels for Roof :
• One machine can make one slab lower cost, high Wear-resistant, long service life.
• In case of quality problem the company provide free replacement.
• Provide technical support for free.
• Provide consumers with regular visits
• Simple structure, easy operate, less wear parts
3. Prestressed Floorboard with Steels for Roof Images:
4. Prestressed Floorboard with Steels for Roof Specification:
Type | Aperture & diameter | Number and diameter of wires | Max span | Total power | Productivity (m/min) | Max. Load (KN/m2) | Overall dimension (mm) | Weight (kg) |
GLY180-1200 | 11/ peach | 12/9.5or12.7 | 9 | 18.5 | 1.1-1.3 | 16.16 | 2900X1500x1200 | 3300 |
GLY200-1200 | 8 /peach | 10/9.5or12.7 | 10 | 22 | 1.1-1.3 | 13.22 | 3700X1550X1550 | 5300 |
GLY250-1200 | 8/ peach | 10/12.7 | 12.6 | 33 | 1.1-1.3 | 11.1 | 3700X1550X1500 | 6200 |
GLY300-1200 | 6 /peach | 8/12.7 | 15 | 40 | 1.1-1.3 | 10.83 | 3700X1550X1500 | 6900 |
GLY380-1200 | 8 /rhomb | 8/12.7 | 18 | 39.2 | 0.8-1.0 | 12.27 | 4600X1850X1600 | 7500 |
Production Process
Rebar tensioning
Raw materials preparing
Molding
Our customers
5. Packing & Delivery
• Wire cables are used for fastening the machine on the trailer or inside the container.
• Machine covered with plastic film.
• Machines can be packed in tarpaulin or wooden case according to customer’s needs.
6. FAQ:
We have organized several common questions for our clients, may help you sincerely:
• What information we need to confirm with you before send a formal offer?
What kind of slab you want to make, wall panel, roof panel, lintel or something else?
Do you have exact slab size (slab thickness and width)? If not, please tell us the slab span, we will give you suggestion.
• Have you use this kind of machine before?
Our machine is totally different from European machine. Please don’t follow their instructions.
• What kind of machine do you have?
Our main products: large span GLY concrete hollow core slab machine, light - weight wall panel machine, lintel machine, column machine, hollow core slab cutting machine, concrete feeding dumper, high-strength steel wire tensioning machine, which amount to more than the types and more than four hundred standards. We can provide the whole plan and technology supporting for concrete precast component.
7. Our Service:
• We supply the technical supporting all the time.
• We supply one year warranty for whole machine.
• We supply free quick wear parts.
• We supply low charge continue maintenance when warranty is expired.
• We supply free training to end-users
- Q: How does operating machinery under water complicate mining procedures?
- Absolute pressure at the surface is 14.7psi. Absolute pressure at 250 feet of see water for example is 126psi. That puts the machinery and people into a very different world that us surface dwellers from the get go. The BP job was at something like 7000 to 8000 feet if I remember correctly. That's about 3352psi. People can only dive to about 1000 feet of sea water. So on the BP job there were no people down there working. Everything we saw was from ROVs. Remotely Operated Vehicles. Doing things with a claw that is controlled by a joystick through a TV screen is very different from doing it with your own hands when you're right there looking at it. Even when you do have divers down there they usually only have 1 to 4 people. That's a limited team. They do not have a big box full of tools down there with them. They have the surface crew send the tools to them as needed. Salt water is not good for any kind of tool. It makes them rust and makes the seals break down. This leads to tool failure and many trips back and forth for replacements and repairs. The surface crew is usually young guys 18 to 25 who are not the most mature or reliable people in the world. Tool maintenance does not always get done properly. Divers are regular people. They are stubborn, arrogant, lazy, dumb and any other thing that you run into with coworkers anywhere. If they feel like sitting down for a break, the boss can't always keep a proper watch on them or come down and yell at them. We just finished a well abandonment job where we did the same thing with plugging a well with concrete just like the BP job and it took us 6 tries. That technique doesn't work too good at shallower depths either. This stuff is still full of bugs buts the pursuit of money keeps things moving beyond what we truly understand.
- Q: I'm specifically looking for training on heavy machinery such as bulldozers, backhoes cranes etc. The courses are given in montreal but there's a 10 year wait. If you know of any sort of training course of the sort in the 613 area code, please let me know. Thanks
- Try okorder /
- Q: I bought an Oasis Machinery Dust Collector. Any free replacement bags?
- es okorder
- Q: if not how much would you pay for one if i did it (NOT)
- There okorder /... may be an example
- Q: Who builds machinery to produce expanded metal ?
- google for it
- Q: Do engineering technicians get to invent and patent ideas within large companies, or is this typically reserved for the mechanical engineers?
- Mech Engr Technicians are mechanics. They assemble, tear down and help diagnose things gone wrong with machines. They take data etc. but rarely will do much inventive work, still, some inventive opportunity exists for technicians, I've had many work for me and good one's are worth everything they get paid and more. Truth be told though, very few Engineering technicians are getting hired these days. If you want to be an engineer, bite the bullet and do the 6 years of school it takes, you will not regret it. Astrobuf
- Q: What are the main considerations when choosing mechanical parts?
- The load of the part determines the grade of the material according to the load or according to the strength requirements.
- Q: machinery purchsed entry and derpeciation charged for it?
- The purchase: Dr. Machinery (Fixed Assets) Cr. Cash / Accounts Payable Depreciation: Dr. Machinery Depreciation Expense Cr. Machinery Accumulated Depreciation Note that the accumulated depreciation is a contra account for the fixed assets, and what appears on the Balance sheet is the net of the two figures.
- Q: this is according to marx, i think its to do with how machinery changed society from primitive to industrial, im not sure tho, any help would be gratefully appreciatedthanks
- Machines okorder
- Q: I'm not talking about luck, faith or chance but about instinctive wisdom. Your place in life and how easy or hard it was for you to connect the dots starting from scratch.
- cosmic machinery? are you on drugs?
Send your message to us
Prestressed Floorboard with Steels for Roof
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 5 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches