OEM Kwikstage System Kwikstage Scaffold Galvanised Kwikstage Standard Hot DIP Galvanised CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of OEM Kwikstage System Kwikstage Scaffold Galvanised Kwikstage Standard Hot DIP Galvanised
Type:
Material:
Construction Properties:
Lapping Form:
Framework:
Supporting Mode:
Erection Position:
Scaffolding Part Type:
Move Method:
Structural Style:
Place of Origin:
Surface:
Material.:
Thickness:
Descriptions of OEM Kwikstage System Kwikstage Scaffold Galvanised Kwikstage Standard Hot DIP Galvanised
Kwikstage Scaffolding is a multi-purpose modular scaffold system which can be used for all forms of access and support structures in the building and construction industries, ship buliding, offshore construction and industrial maintennace.
Details of Metal kwikstage Scaffolding
1. Metal kwikstage scaffolding system is a new type of selflock scaffolding which is very popular in Oceanian,African construction.
2. Metal kwikstage scaffolding System is suitable for both inside concrete slab supporting and outside masonry Construction multi-purpose for construction.
3. Metal kwikstage scaffolding systemstandard is weld with a plate every 600mm which can join ledgers at 90 degree.
4. Metal kwikstage scaffolding system ledger is a horizontal member with a blade at each end for insertion into the standard plate.
5. kwikstage scaffolding system is quick to erect and strip which has completely replaced other scaffolding.
The Accessories of OEM Kwikstage System Kwikstage Scaffold Galvanised Kwikstage Standard Hot DIP Galvanised
STEEL STANDARD
Material: steel tube φ48.3x3.25mm
Surface finish: hot dipped galvanized
Standard with normal length 3.0m, 17.02kg
Standard with normal length 2.5m, 14.32kg
Standard with normal length 2.0m, 11.64kg
Standard with normal length 1.5m, 8.94kg
Standard with normal length 1.0m, 6.26kg
Standard with normal length 0.5m, 3.56kg
Topper Standard, 1.72kg
Material: steel tube φ48.3x4.0mm
Surface finish: hot dipped galvanized
Standard with normal length 3.0m, 19.48kg
Standard with normal length 2.5m, 16.38kg
Standard with normal length 2.0m, 13.28kg
Standard with normal length 1.5m, 10.18kg
Standard with normal length 1.0m, 7.07kg
Standard with normal length 0.5m, 3.97kg
Topper Standard, 1.93kg
STEEL LEDGER
Material: Made of steel tube φ48.3x3.25mm
Surface: hot dipped galvanized
Ledger of 3.00m, 13.00kg
Ledger of 2.44m, 10.67kg
Ledger of 2.39m, 10.60kg
Ledger of 1.95m, 8.87kg
Ledger of 1.83m, 8.29kg
Ledger of 1.78m, 8.20kg
Ledger of 1.47m, 6.97kg
Ledger of 1.22m, 5.98kg
Ledger of 1.05m, 5.31kg
Ledger of 0.71m, 3.97kg
TRANSOM (ANGLE)
Material: Made of steel 5# angle
Surface: hot dipped galvanized
Transom 2.39m, 17.71kg
Transom 1.78m, 13.60kg
Transom 1.27m, 10.19kg
Transom 1.22m, 9.85kg
Transom 1.05m, 8.70kg
Transom 0.813m, 7.12kg
Transom 0.71m, 6.42kg
Transom 0.60m, 5.75kg
Transom 0.51m, 5.08kg
L/A Transom 1.8m, 11.78kg
L/A Transom 1.2m, 9.56kg
BRACE
Material: Made of steel tube φ48.3x3.25mm
Surface: hot dipped galvanized
Brace 3.6m, 15.33kg
Brace 3.2m, 14.00kg
Brace 2.7m, 12.25kg
Brace 2.0m, 9.33kg
Brace 1.6m, 7.99kg
STEEL PLANK
Material: Made of 1.8mm thickness pre-gal.steel sheet
Surface: hot dipped galvanized
Size: 229mm(W)x 66mm(H)
Steel Plank 4.00m, 25.30kg
Steel Plank 3.00m, 18.90kg
Steel Plank 2.44m, 15.37kg
Steel Plank 2.00m, 12.52kg
Steel Plank 1.81m, 11.42kg
Steel Plank 1.25m, 8.20kg
Steel Plank 1.05m, 7.05kg
Steel Plank 0.736m, 5.25kg
FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q: Scaffolding installation and precautions?
- When the structural layer is attached to the wall, the wall column, the vertical horizontal rod and the transverse horizontal rod are set up immediately after the erection of the structure.5, closed with a step horizontal bar frame must turn around the hands all around the circle, with a right angle fastener and the inner and outer post fixed.6, the horizontal horizontal pole of the double row scaffold should not be greater than 100mm from the wall to the wall.7, when the scaffolding operation of the wall of the two steps, should take temporary stability measures, even after the wall pieces can be removed before the erection.
- Q: How to calculate the fastener type steel pipe scaffold
- 1 "Uniform provisions" on the scaffolding structure design calculation method?1.1 requirements for design methods and design requirements1.1.1 stipulates that the scaffolding structure will be based on the probability theory based on the limit state design method (referred to as the probability limit state design method, that is currently China's engineering structure design method) for design.
- Q: I have to write a 1 page commentary on a geographical issue for school, and, I've never done that before.Could someone please tell me or link me to a very simple 'writing commentary' scaffold for beginners?Please?Thankyou :)
- To know about College and university! log on to alumne /
- Q: i had it done 2/3 months ago, it was fine at first but now on each end i have two lumps on my ear:S there relitavely smal...the size of like a really tiny pea.there really painfull and sore and quite red and sometimes they scab over with yellowy crust [yes i know sounds disguisting]im just a bit worried that its gone all weird or are these normal? am i cleaning it right?
- I had the same situation occur when I got my scaffold/industrial done. I wouldn't be too concerned. The lumps are called hypertrophic scars, and supposedly they are pretty common and are caused by overcleaning, harsh products, or (as I think was my case) general irritation from the jewelry moving repeatedly back and forth through the piercing or being bumped around or rubbed/touched. Mine lasted quite a long time. Try leaving your piercing alone for a couple of days. Then salt water solutions or compresses are supposed to help the lumps to heal, and I also used tea tree oil and neosporine intermittently. Hot compresses like a heated washcloth applied to the area help to reduce the lumps, as well. Sometimes it's recommended to try another type of jewelry, like titanium, or switch temporarily to two separate bars. You might also try finding a really gentle cleanser/soap. I just kept my original piercing, using the above techniques off and on, and after months of the lumps remaining red and sore, they just went away totally. Just keep your eye out for any pussing (hypertrophic scars ooze, but they don't usually pus), increased swelling, and the area feeling very hot- these are signs of infectiona nd you should see your doc right away. Good luck! :)
- Q: How to set up the temporary structure of the external structure of the balcony on the two structure
- Foundation engineering:Square - hole excavation pile - pile - reinforced concrete beam - based backfill. Pile by manual drilling, artificial trolley, concentrated heap of residual soil, automobile Sinotrans earthwork project, the allowable deviation of hole diameter of pile are as follows: 800cm, vertical aperture offset, 10cm < 1%, along the axis, vertical axis direction 7cm.
- Q: If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
- You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
- Q: What is the bowl buckle scaffolding, bowl buckle scaffold what are the characteristics
- (c) the cross bar is made of welded joints of 48 mm x 3.5mm steel pipe with a certain length. Horizontal connecting rod for vertical rod, or horizontal bearing rod of frame;
- Q: I know its between chapters one and two, duh. Haha, but yeah, I needa do this thing on Edmodo for school, but i accidentally left my book in my locker.):I tried looking at online versions, but you know it's so hard, right? Looking and seeing all these different versions and I cant find the place...I need where she entered the scaffold because I need to cite where she thinks about how she's accepted her quot;sinquot;. So yeah~ PLEASE HELP! ( gt; . lt; )
- i'm no longer completely constructive of the answer to this actual question, yet I only finished a unit in this novel and could like to help with any extra questions...be satisfied to invite -Alice
- Q: What is the service life of the mobile scaffolding accessories?
- The overall life of cold galvanized mobile scaffolding accessories for about 5 years, the surface does not require maintenance, moderate cost. The main processing technology: the welding of the scaffolding parts and then galvanized, the surface of each part, are galvanized. 5 years of surface treatment period, and the use of the elimination period, very close to the larger share of the market share.
- Q: So im a guyAnd I might get oneAnyone had one before/got one?Any advice?How much do they normaly cost?if you answer this i will love you forever :)
- i got mine (industrial) almost 8 years ago and it cost me $42. it hurt, they do it with one needle and just go straight across your ear. my mom nearly cried when she saw it. it feels really hot and sore after you get it and you have to constantly turn the bar in your ear to prevent infection and a keloid scar. i had a keloid scar on my ear from it and when i started working i was asked to take it out. it smells funny sometimes but i loved having it. kinda miss it now. good luck! xo
Send your message to us
OEM Kwikstage System Kwikstage Scaffold Galvanised Kwikstage Standard Hot DIP Galvanised CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords