• Hot DIP Gal Galvanized Kwikstage Scaffold System (AS/NZS 1576) CNBM System 1
  • Hot DIP Gal Galvanized Kwikstage Scaffold System (AS/NZS 1576) CNBM System 2
  • Hot DIP Gal Galvanized Kwikstage Scaffold System (AS/NZS 1576) CNBM System 3
Hot DIP Gal Galvanized Kwikstage Scaffold System (AS/NZS 1576) CNBM

Hot DIP Gal Galvanized Kwikstage Scaffold System (AS/NZS 1576) CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Hot DIP Gal Galvanized Kwikstage Scaffold System (AS/NZS 1576)

  • Type:Fixed

  • Material:Steel

  • Construction Properties:Building Scaffold

  • Lapping Form:Full Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Floor Type Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Frames

  • Move Method:Attached Lifting Scaffolding

  • Structural Style:Multi-Pole Scaffolding

  • Place of Origin:China (Mainland)

  • Surface:Painted or Hot Dipped Galvanized

  • Material.:Steel Q235 Q345

    Thickness:4mm;3.2mm;3mm

  • Hot DIP Gal Galvanized Kwikstage Scaffold System (AS/NZS 1576) CNBM

  • Hot DIP Gal Galvanized Kwikstage Scaffold System (AS/NZS 1576) CNBM




  • Hot DIP Gal Galvanized Kwikstage Scaffold System (AS/NZS 1576) CNBM



  • Descriptions of Hot DIP Gal Galvanized Kwikstage Scaffold System (AS/NZS 1576)

Kwikstage Scaffolding is a multi-purpose modular scaffold system which can be used for all forms of access and support structures in the building and construction industries, ship buliding, offshore construction and industrial maintennace.
Details of Metal kwikstage Scaffolding
1. Metal kwikstage scaffolding system is a new type of selflock scaffolding which is very popular in Oceanian,African construction.
2. Metal kwikstage scaffolding System is suitable for both inside concrete slab supporting and outside masonry Construction multi-purpose for construction.
3. Metal kwikstage scaffolding systemstandard is weld with a plate every 600mm which can join ledgers at 90 degree.
4. Metal kwikstage scaffolding system ledger is a horizontal member with a blade at each end for insertion into the standard plate.
5. kwikstage scaffolding system is quick to erect and strip which has completely replaced other scaffolding.



  • The Accessories of Hot DIP Gal Galvanized Kwikstage Scaffold System (AS/NZS 1576)


  • The main items of Kwikstage scaffolding system

     ITEMSSPECIFICATIONWEIGHT
    STANDARD
    (VERTICAL)
    48.3*4.0*3000/2500/2000/1500/1000mm
    painted/hot dip galvanized/ect.
    steel pipe
    16.94/14.34/11.53/8.86/6.13kg
    LEDGER
    (HORIZONTAL)
    48.3*3.2*2400/1800/1200/700mm
    painted/hot dip galvanized/etc.
    steel pipe
     9.1/6.85/5.13/3.24kg
    TRANSOM2400/1800/1200/700mm
    painted/hot dip galvanized/etc.
     19.92/12.08/10.79/7.79kg
    BRACE2400*2000mm/2500/3000mm
    pained/hot dip galvanized/etc.
     9.38/10.35/11.41kg
    HOPUP BRACKETone board/two board/three board
    painted/hot dip galvanized/etc.
     1.84/4.99/8.58kg
  • The other items of Kwikstage scaffolding system

  • TIE BAR2400/1800/1200/700mm
    painted/hot dip galvanized/etc.
     5.41/4.15/2.77/1.72kg
    STEEL BOARD2400/1800/1200/700mm
     painted/hot dip galvanized/etc.
     14.5/10.93/7.68/4.94kg
    END TOE BOARD BRACKET as normal specification or as customers' drawing
    painted/hot dip galvanized/etc.
     1.12kg
    TOE BOARD BRACKET as normal specification or as customers' drawing
    painted/hot dip galvanized/etc.
     0.72kg
    BASE JACK and U HEAD 38*4.0*650mm/u head
    painted/hot dip galvanized/etc.
     3.69/4.63kg

  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q: How to solve the problem of scaffold pipe repair
ST100 type hyperbolic steel pipe straightening machine adopts staggered rolling rotary straightening system, the 4 line rolling wheel revolves around the steel pipe:
Q: Does anyone know the name of the song or perhaps have a link to the video if they have seen it on net for example on youtube.?
I think its 'Aint goin down til the sun comes up' but I'm not 100%, sorry.
Q: What are the full house scaffolding specification
Preparation of "full house scaffolding construction plan" according to the specification including but not limited to the following:1 "steel pipe scaffold fastener" (GB15831-2006)2 "technical code for safety of high level construction work" (JGJ80-1991)3 "technical code for safety of scaffold for building construction" (JGJ202-2010)4 "code for safety of steel tubular scaffold with couplers in construction" (JGJ130-2001)
Q: I think that'd be extremely entertaining.
World Wrestling Entertainment has never done Scaffold Matches in it's 5 Decade Histrory. If you want to see Scaffold Matches, go buy tickets to an Independent Wrestling Show. WWE has no interest in hiring Necro Butcher. He doesn't have the Look that they want. WWE doesn't have any interest in New Jack. They've known about New Jack for 2 decades and haven't made any attempts or expressed any interest in signing him.
Q: Which God can tell me what is required, how to get ah?
Whether the site is to use their own hand foot disc accessories, accessories or disc scaffolding rental, before use should be carried out preliminary calculation, see how many accessories, the same buildings of different height should be calculated separately, is used to prevent waste of transportation. To achieve cost savings must be accurate calculation. You can go to the mall extension carefully and look at the product deformation, distortion, rust, if any of the above parts, should immediately terminate the use of such products can not be put into construction and.
Q: I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
Scaffolding steel pipe1, set up a high-level scaffolding, the various materials used must meet the quality requirements.2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures.3, scaffolding erection technical requirements shall comply with the relevant provisions of the code.4, we must attach great importance to a variety of structural measures: scissors, pull nodes, etc. should be set according to requirements.5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.
Q: Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
. The utility model is mainly used for a light frame and a background frame of a large-scale concert Disc type multifunctional scaffolding, after the bowl buckle scaffold after the upgrading of products. The socket diameter of 133mm scaffold, 10mm thick disc, 8 hole disc, adopting 48*3.5mm, Q345B pipe master component, the vertical rod is in the pipe length of every 0.60m welding on a disc, rail connection using this novel and beautiful disc, the bottom with the connecting sleeve. The cross bar is made of a plug with a plug welded on both ends of the steel pipe.
Q: what happened when author dimmesdale went to the scaffolding in town square?
Which time? The first time he went there at night, admits his sin, mets up with Hester Prynne and Pearl, and an A appears in the sky. The second time, Arthur Dimmesdale reveals this secret to the public. He then has a heart attack on the scaffold and dies.
Q: Can anybody provide me the formula for calculating scaffold volume on circular tank?
Step 1. Measure the diameter of the tank (D). Step 2. Measure the height (h) for a vertical tank or length (l) of a horizontal tank. Step 3. Calculate the cross-sectional area of the tank using Equation 1. Equation 1: Cross-sectional Area, A = 3.14 x D x D/4 Step 4. Calculate the volume of the tank in cubic feet using Equation 2. Equation 2: Volume in cubic feet = A x h [for a vertical tank] Volume in cubic feet = A x l [for a horizontal tank] Step 5. Convert the volume of the tank from cubic feet to gallons using Equation 3. Equation 3: Volume in gallons = (Volume in cubic feet) x 7.48
Q: three examples of scaffolding, thanks
Google these 1) Independent scaffold 2) Putlog scaffold 3) Birdcage scaffold

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords