Formscaff Peri Kwik Stage System Kwikstage Scaffolding CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Formscaff Peri Kwik Stage System Kwikstage Scaffolding
Type:
Material:
Construction Properties:
Lapping Form:
Framework:
Supporting Mode:
Erection Position:
Scaffolding Part Type:
Move Method:
Structural Style:
Place of Origin:
Surface:
Material.:
Thickness:
Descriptions of Formscaff Peri Kwik Stage System Kwikstage Scaffolding
Kwikstage Scaffolding is a multi-purpose modular scaffold system which can be used for all forms of access and support structures in the building and construction industries, ship buliding, offshore construction and industrial maintennace.
Details of Metal kwikstage Scaffolding
1. Metal kwikstage scaffolding system is a new type of selflock scaffolding which is very popular in Oceanian,African construction.
2. Metal kwikstage scaffolding System is suitable for both inside concrete slab supporting and outside masonry Construction multi-purpose for construction.
3. Metal kwikstage scaffolding systemstandard is weld with a plate every 600mm which can join ledgers at 90 degree.
4. Metal kwikstage scaffolding system ledger is a horizontal member with a blade at each end for insertion into the standard plate.
5. kwikstage scaffolding system is quick to erect and strip which has completely replaced other scaffolding.
The Accessories of Formscaff Peri Kwik Stage System Kwikstage Scaffolding
The main items of Kwikstage scaffolding system
ITEMS SPECIFICATION WEIGHT STANDARD
(VERTICAL)48.3*4.0*3000/2500/2000/1500/1000mm
painted/hot dip galvanized/ect.
steel pipe16.94/14.34/11.53/8.86/6.13kg LEDGER
(HORIZONTAL)48.3*3.2*2400/1800/1200/700mm
painted/hot dip galvanized/etc.
steel pipe9.1/6.85/5.13/3.24kg TRANSOM 2400/1800/1200/700mm
painted/hot dip galvanized/etc.19.92/12.08/10.79/7.79kg BRACE 2400*2000mm/2500/3000mm
pained/hot dip galvanized/etc.9.38/10.35/11.41kg HOPUP BRACKET one board/two board/three board
painted/hot dip galvanized/etc.1.84/4.99/8.58kg The other items of Kwikstage scaffolding system
TIE BAR 2400/1800/1200/700mm
painted/hot dip galvanized/etc.5.41/4.15/2.77/1.72kg STEEL BOARD 2400/1800/1200/700mm
painted/hot dip galvanized/etc.14.5/10.93/7.68/4.94kg END TOE BOARD BRACKET as normal specification or as customers' drawing
painted/hot dip galvanized/etc.1.12kg TOE BOARD BRACKET as normal specification or as customers' drawing
painted/hot dip galvanized/etc.0.72kg BASE JACK and U HEAD 38*4.0*650mm/u head
painted/hot dip galvanized/etc.3.69/4.63kg FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q: Erection of scaffolding accessories
- Erection of scaffolding accessories:Door frame should be installed from one end to the other end of the extension, and layer by layer to change the direction of the set, not the opposite. After the completion of one step, should check and adjust its level and verticality. Scaffolding should be built around the building, continuous, synchronous erection elevation, in the form of a closed structure around the building; if not closed, the scaffold should be added at both ends of the wall.
- Q: Exterior wall scaffold construction plan?
- Big bar:The large cross bar is arranged above the cross bar, and the inner side of the vertical rod is fastened with a right angle fastener and a vertical rod, and the length of the utility model is not less than 6m of the span of the 3m. The large cross bar is connected with a butt fastener, and the joint is arranged in a staggered way, not in the same time and in the same distance. The horizontal distance of adjacent joints shall not be less than 50cm. The distance from the joint to the riser is not more than 50cm
- Q: A scaffold is constructed by placing two supports under a 13 ft, 9 in (a) board weighing 84 lbs. The supports are each 2 ft, 8 in (b) from their respective ends. Two painters stand on the board; one weighs 158 lbs and stands 4 ft, 11 in (c) from the left end of the board. Where must the 222 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)please help!! thanks(:
- Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
- Q: How to maintain the scaffold after use
- Tool type scaffolding (such as door frame, bridge frame, hanging basket, receiving table) in the removal of the need to stop the maintenance and timely maintenance, and supporting storage.
- Q: Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
- It is widely used in bridge engineering, tunnel engineering, workshop, elevated water tower, power plant, oil refinery... Support design and special plant, is also applicable to overpass span scaffolding, storage shelves, chimney, water tower and indoor and outdoor decoration, large concert stage, the background frame, stands, balcony frame, stairs, other party system, stage setting, sports watch station project.
- Q: I had my scaffold pierced yesterday and now it is swollen and red. Its throbbing and painful. I have cleaned it and applied ice and antiseptic spray.I don't own any sea salt.HELP ME! I'M SO TEMPTED TO REMOVE IT.
- Antiseptics are too harsh for a healing piercing, the pain, swelling and redness is completely normal. Stop using antiseptic and go to the grocery store to get some non-iodized sea salt, its only a few dollars and you can find it in the spice aisle where the regular salt is.
- Q: In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?The calculation formula for force rod scaffold N/ psi A+Mw/W = fWhere N=1.2 (Ng1k+Ng2k) +0.85*1.4 Sigma NqkThe specification of N g2k is explained in terms of the axial force generated by the standard values of the component fitting,It is how to understand, specifically refers to what? That is to say, what is the standard value of the component?Please master all trouble, thank you generous with your criticism!
- Is to produce weight between each vertical rod scaffolding force
- Q: Okay, quick question. I dropped into a couple of piercing studios yesterday to inquire about getting a scaffold done. Both places informed me that it's not a good idea to have it pierced with a bar straight off, as the pressure from the jewellery combined with the swelling when first pierced can seriously slow down the healing rate. Is this true? The second place said they will pierce both holes with rings, and these can be changed to a bar after around 6 to 8 weeks.Is this the best option? Thanks for any replies.
- Scaffold Piercing Jewellery
- Q: male scaffolders only if i was swinging on the scaffold would ya stomp on my fingers with ya workboots on?
- No, I would use my hammer while I had my workboots on.
- Q: Compared to Pankou scaffolding and scaffolding have what distinction, what are the advantages
- 3, Pankou scaffolding load intensity up to 200KN capacity4, Pankou scaffolding scaffolding activities. Abandon the traditional parts easily lost, easily damaged, and compared with the ordinary bowl-scaffold, saving up to 2/3 more than the amount of steel, so to a certain extent, greatly shorten the construction unit cost and economic loss.
Send your message to us
Formscaff Peri Kwik Stage System Kwikstage Scaffolding CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords