• New Tower Crane Building Machinery for Sale System 1
  • New Tower Crane Building Machinery for Sale System 2
  • New Tower Crane Building Machinery for Sale System 3
  • New Tower Crane Building Machinery for Sale System 4
  • New Tower Crane Building Machinery for Sale System 5
  • New Tower Crane Building Machinery for Sale System 6
New Tower Crane Building Machinery for Sale

New Tower Crane Building Machinery for Sale

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detail of Tower Crane

Feature: Tower Crane                Condition: New                         Application:Building,Construction,Industrial

Rated Loading Capacity: 1-6T        Rated Lifting Moment:62KN.M            Max. Lifting Load: 6T

Max. Lifting Height: 141.5M         Span: 2.5-56M                          Place of Origin: China (Mainland)

Brand Name: CMAX                    Model Number: TC5610(QTZ62)            Certification: ISO,CE

Warranty: 1 Year                    Free standing height (M):41.5          Max. Working Range(M): 56

Tip Lifting Weight(T): 1            Working Range(M): 44,50,56             Climbing speed(M/MIN): 0.58

Counterweight(T): 141.1             Working Temperature(°C): -40-+60      Type: Topkit Tower Crane

Delivery Date:25-30 days            Mast Section Size(L*W*H)MM:1600*1600*2500(Intergrated type)             


Main Features of Tower Crane


1. TC5610(QTZ62) have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 56m, TC5610(QTZ62)  tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

 

2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

 

3. It is original in design, reliable in operation and satisfactory in shape.

 

4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.

 

6. Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

 

7. Slewing mechanism equipped with 4-speed motor, stable and reliable, can provide stepless speed regulation.


8. Trolleying mechanism can provide two operation speeds.


9. With scientific layout and beautiful appearance.

 

10.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. 

 

11.After sales service will be offered which will get rid of all your worries in the purchase of our products


Specification of Tower Crane

 

New Tower Crane Building Machinery for SaleNew Tower Crane Building Machinery for SaleNew Tower Crane Building Machinery for Sale

Images of Tower Crane 


New Tower Crane Building Machinery for Sale

New Tower Crane Building Machinery for Sale

New Tower Crane Building Machinery for Sale

New Tower Crane Building Machinery for Sale

New Tower Crane Building Machinery for Sale


FAQ about Tower Crane

 

Q: What kinds of tower crane are available now? 

A: Four main categories: normal  tower crane  with cat head, internal climbing  tower crane , top less  tower crane  and luffing  tower crane.  

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



Q: Firstly I know there is a very good club near me which does 5 lessons a week, just to let you know.Firstly could you please tell me how much of white crane is actually fun and how much percentage is kicks and how much punches.I'm a very althletic boy age 15 and I don't know much about this style. Is it fairly exciting and what I might enjoy?Thanks for you help.
white crane kung fu
Q: well I am making 1000 paper cranes... I am on 18... but how do you string them all together anyone know?
You poke a hole in them and string them....
Q: death... by exile!Also, which Batman movie was your favorite and why?Mine was the first because it was cool to see how Wayne started and got all the Batman stuff and the movie was less confusing, haha. Plus I thought the actor Cillian played Scarecrow really great :)
Yes, that was such a nice surprise. He was a great villain in Batman Begins. For a split second, I was like Wait a minute - the last time I saw Dr. Crane, he was freaking out on that Toxin they released into The Narrows. . ., but then, I remembered - he and everyone else affected by that poison were given the antidote after it was produced by Wayne Enterprises. His role as the judge at the sort of Reign Of Terror style court system is perfect - Crane clearly enjoyed watching people suffer mentally, liked seeing them terrified. Sadistic little twerp. Tough call on favorite.. . while I think the first two thirds of The Dark Knight are probably the very best of the series. . . my personal fave is Batman Begins, too. I can remember the first time I saw it, and as they're showing the establishment shot of those mountains in Asia, Raz Al-Ghul's lair. . . I kept thinking, this is different than any other Batman stuff I've seen - this is cool! Kinda sad it's over! :( Edit - And I just wanted to add - I've used that line Bruce's dad says with my own little son: Why do we fall? :)
Q: How many meters is the tower crane installed on the edge of the deep foundation pit?
Tower crane foundation, if set up in the foundation pit, the foundation is to pile other, general tower crane is to support the wall.Therefore, how far away from the foundation pit is determined by the distance from the retaining wall.According to the industry standard "technical specification for concrete foundation of tower crane tower crane foundation installation" (JGJ/T187-2009), the installation of tower crane foundation concrete should reach more than 80% of design strength, the tower crane foundation concrete design strength should reach 100%.
Q: Every day to see the site of the tower crane, and increased with the increase of buildings, but it is very strange. By what means, in the process of how to increase Balance Master, please explain.
In the table below the tower crane is the upper part of the tower body has four jacks, the top of the cage tower (tower of each section is called a tower cage) a little bigger than the following (which can be installed under a small tower, heightening cage) need to jack up above "high rise to work, just a small tower added into the big cage, the cage towers bolted, or tall tower cage can be fixed.
Q: How many motors does the ZOOMLION TC6013A-6 tower crane use?
Model: YZRDW225M-4/8 power: 24/24KW speed: 1420/725r/minDirect search {ZOOMLION QTZ80 (tc6013) _ crane Manual Part 1 (Part Two)}, can also be found.
Q: i have 5 tower cranes outside my window at different construction sites and they all position their cranes the same direction at the end of the day. is there a reason for this.
I spent a year walking to work past a tower crane that was being used for a high rise apartment building in Philadelphia. I don't recall ever seeing it parked pointing in the same direction two days in a row.
Q: Why are crane flies called mosquito eaters?
Do Crane Flies Eat Mosquitoes
Q: Hi,what are crane swivels and fishing swivels. are they same
Yes okorder /
Q: Is a crane a type of pulley?
No. A crane is a machine to lift heavy things. It usually uses a pulley. A pulley is part of the crane.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords