2015 plastic concrete formwork system, better than aluminium / peri formwork system
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Plastic construction formwork
plastic concrete formwork system
Saving your time, money and energy !!!
What is Details of our products plastic concrete formwork ?
Features:
1. Long lifespan& Cost effective -- Plastic formwork can be reused over 100 times,
where Plywood can only be reused 3 to 5 times. Therefore the Plastic Formwork
is more cost effective.
2. Waterproof -- As the nature of plastic material. It's imputrescible and rustless,
especially suitable for underground and watery circumstance.
3. Interlocking Design -- No release agent needed, good effect of demolding.
4. Easy deassembly -- The template will be separated easily from concrete
5. Simple Installation -- Light weight and safe to handle, easy cleaning and very robust.
6. High Quality -- Abrasion resistance, excellent mechanical property, best impermeability.
7. Recycable -- Waste scrap molding board could be recycled.
What is Advantages of our company ?
Our anvantages
| High quality |
Reasonable price | |
Strict delivery time | |
Good after-sales service | |
Profession maker for 21 years | |
Gold supplier 9th year | |
Strict quality control | |
professional injection mould | |
3D design |
Product Photos/ plastic concrete formwork
FAQ:
1.Q:Are you a factory or trading company?
A: We are the factory of plastic formwork.
2.Q:Where is your factory located? How can I visit there?
A: Our factory is located in Taizhou City, China.You can fly to Ningbo airport directly.All our clients, from home or abroad, are warmly welcome to visit us!
3.Q:How can I get some samples?
A: We are honored to offer you samples.
4.Q:How does your factory do regarding quality control?
A:"Quality is priority. we always attach great importance to quality controlling from the very beginning to the very end. Our factory has gained ISOTS16949 authentication.
If you are interested in our plastic formwork , please feel free to contact with us by email. We will quote you the best price, if you have drawings, we can help you caculate the quantity of plastic formwork .
Any building drawings is OK, just send us your drawing, we can make the plastic formwork quantity for you.
And we warmly welcome friends from all over the world to visit our factories for business.
- Q:Is there a kitchen toilet to seal the water pipe plastic template? Where to sell?
- With PVC board and steel ceiling of the board on it, to the hardware store to buy
- Q:Who used it, how not universal.
- 4. The product pouring concrete surface smooth, bright as a mirror, to meet the requirements of decorative and decorative water, eliminating the need for secondary plastering process. 5. Turnover times more than 50 times, the template each time the amortization cost is less than 3 yuan, steel frame plastic template turnover times more than 300 6. The material is non-toxic, harmless, pollution-free, 100% recovery, green products The 7. The product acid, alkali, anti-corrosion performance. Product use temperature of -80 ℃ ~ 100 ℃, good weather resistance.
- Q:Plastic building template where there is an urgent need to solve
- Plastic construction template turnover can reach more than 30 times, but also recycling. Temperature to adapt to a large range of specifications adaptability, can be saw, drill, easy to use. Temporal surface of the template, smoothness than the existing technical requirements of the water concrete template, a flame retardant, anti-corrosion, anti-water and anti-chemical corrosion function, have better mechanical properties and electrical insulation properties. Can meet a variety of cuboid, cube, L-shaped, U-shaped building support model requirements.
- Q:Plastic construction template has no one used? How about the effect of using. How much can the main savings? Can really use 50 times?
- This is mainly to see how the use of workers in the process of operation by standard, 50 times is entirely possible. The use of plastic templates a little bit, the most important thing is to focus on cost savings, integrated plastic template cost is the lowest. But the price is more expensive than the wood template, long-term, large-scale use is cost-effective.
- Q:Want to purchase a number of building templates and found a new plastic building template, do not know how the quality?
- Why can not, now the plastic template, called light building materials, China is not yet a few plants can do a good job, after the air-conditioning refrigerator to use this, light and hard, not you like this, you can do with the wall, Now high-end are imported.
- Q:Plastic building template made of what material
- Plastic template (that also can be said that the composite template)
- Q:What is the economic benefits of building wood formwork compared to plastic molds?
- Both are their own strength, stiffness is not high, the turnover rate of the template material is low, but the cost is relatively low, due to different uses, can not be compared: wood sheet low cost, can be processed, the turnover rate is low, can not help blisters, if Small keel spacing is large, and the concrete side of the larger pressure, its own stiffness is low, there will be bending deformation or even up the mold, generally in the base floor or slope roof and other concrete appearance quality requirements are not high or one-time no longer a lot of turnover Parts of the use of plastic templates are generally stereotypes, such as ribbed floor in the plastic mold shell, is a specific structure with the template can be leased.
- Q:Does the building plastic template use it? How's the effect? Can I use 30 to 50 times? Can the fire protection requirements of the steel plate on the cast-in-place plate be achieved?
- The reason why the use of the template is to use the template template is the accuracy of the template, that is, after the mold can be set to ensure that the finished product finished shape regular, flush. While the plastic film version is not damaged, the completion can achieve this requirement. But the crux of the problem is that the biggest weakness of the plastic film is too brittle. Those who have done the work know that when the demolition of the template, the workers removed the template directly down to throw. And this throw to lead to the plastic film version of the broken, it is very difficult to film in the film. This is also the reason why the plastic film from the interview more than 10 years can not always develop the root causes. And then plastic film board in the mold when it is very strenuous, must drill with a drill, or can not die, not convenient construction. This is also a plastic film version can not become a mainstream template and a fatal weakness. The third weakness is its flammability. Construction site of the steel connections are required welding, welding flowers gradually to the plastic film board, at least in its surface to form a deep pit (or even lead to fire), a direct impact on the finished product surface finish and flatness.
- Q:How does the concrete on the plastic template remove (already glued to the concrete)
- Water, washed with water, rubbing with things, spend time slowly removed
- Q:Why is the building template made 1830mm * 915mm and not made 2000mm * 1000mm it?
- Can be ruled length processing, can be ruled length processing, can be ruled length processing
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
2015 plastic concrete formwork system, better than aluminium / peri formwork system
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords