• 2015 plastic concrete formwork system, better than aluminium / peri formwork system System 1
  • 2015 plastic concrete formwork system, better than aluminium / peri formwork system System 2
2015 plastic concrete formwork system, better than aluminium / peri formwork system

2015 plastic concrete formwork system, better than aluminium / peri formwork system

Ref Price:
get latest price
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
100 m²
Supply Capability:
10000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Plastic construction formwork

plastic concrete formwork system

Saving your time, money and energy !!!

 

2015 plastic concrete formwork system, better than aluminium / peri formwork system

What is Details of our products plastic concrete formwork ?

Features:

1. Long lifespan& Cost effective -- Plastic formwork can be reused over 100 times,

where  Plywood can only be reused 3 to 5 times. Therefore the Plastic Formwork

is more cost effective.

2. Waterproof --  As the nature of plastic material. It's imputrescible and rustless,

especially suitable for underground and watery circumstance.

3. Interlocking Design -- No release agent needed, good effect of demolding.

4. Easy deassembly -- The template will be separated easily from concrete 

5. Simple Installation -- Light weight and safe to handleeasy cleaning and very robust.

6. High Quality -- Abrasion resistance, excellent mechanical property, best impermeability. 

7. Recycable -- Waste scrap molding board could be recycled.

What is Advantages of our company ?

Our anvantages

 

High quality

Reasonable price

Strict delivery time
Good after-sales service

Profession maker for 21 years

Gold supplier 9th year

Strict quality control

professional injection mould
3D design

Product Photos/ plastic concrete formwork

2015 plastic concrete formwork system, better than aluminium / peri formwork system

2015 plastic concrete formwork system, better than aluminium / peri formwork system

2015 plastic concrete formwork system, better than aluminium / peri formwork system

2015 plastic concrete formwork system, better than aluminium / peri formwork system

2015 plastic concrete formwork system, better than aluminium / peri formwork system

2015 plastic concrete formwork system, better than aluminium / peri formwork system

2015 plastic concrete formwork system, better than aluminium / peri formwork system

FAQ:

1.Q:Are you a factory or trading company? 
A: We are the factory of plastic formwork.

2.Q:Where is your factory located? How can I visit there? 
A: Our factory is located in Taizhou City, China.You can fly to Ningbo airport directly.All our clients, from home or abroad, are warmly welcome to visit us!

3.Q:How can I get some samples? 
A: We are honored to offer you samples.

4.Q:How does your factory do regarding quality control? 
A:"Quality is priority. we always attach great importance to quality controlling from the very beginning to the very end. Our factory has gained ISOTS16949  authentication.


If you are interested in our plastic formwork , please feel free to contact with us by email. We will quote you the best price, if you have drawings, we can help you caculate the quantity of plastic formwork .

Any building drawings is OK, just send us your drawing, we can make the plastic formwork  quantity for you.

And we warmly welcome friends from all over the world to visit our factories for business.



Q: Plastic deformation of the template how to solve or why the deformation Thank you I want the reason
Personally feel that PVC sheet deformation has more reasons. The main reasons are as follows.Pvc plate deformation are: physical deformation and chemical deformation.1. Physical deformation, cause:High temperature lead to deformation, if it is such a deformation, targeted plastic raw materials for high temperature modification, can effectively improve such problems. Improper textile lead to deformation, such deformation has two reasons, a plate of raw materials can not meet the actual requirements of the product requirements, re-deployment of raw materials formula to meet the actual requirements of the product can be. Second, the processing and storage methods are not correct, leading to deformation, such problems can solve the problem from the root causes.2. Chemical deformation: mainly the molecular structure of raw materials change.
Q: Plastic construction template has no one used? How about the effect of using. How much can the main savings? Can really use 50 times?
This is mainly to see how the use of workers in the process of operation by standard, 50 times is entirely possible. The use of plastic templates a little bit, the most important thing is to focus on cost savings, integrated plastic template cost is the lowest. But the price is more expensive than the wood template, long-term, large-scale use is cost-effective.
Q: Why the floor is not plastic building materials square wood and template
Not people do not have this product is not humane is not perfect not to buy only to be used to solve the trouble of the workers with the boss's doubts
Q: Who used it, how not universal.
The product has the following characteristics: 1. General product specifications 3020 * 1220 * (12-20) mm. Product area, construction joints less, improve the construction speed and efficiency. 2. The product can be sawed, planing, can be nailed, can be repaired, processing is very convenient. 3. Strong plastic PP plastic template does not absorb water, there is no stratification, cracking phenomenon.
Q: Europe and the United States national construction template is made of plastic or wood
Part of the place with stones, as the case may be, but certainly yes, Europe and the United States have anti-seismic buildings
Q: Want to purchase a number of building templates and found a new plastic building template, do not know how the quality?
To be honest, not very good. The Temporary use can be
Q: How does the concrete on the plastic template remove (already glued to the concrete)
Stupid way, with a little hammer little bit of the beat, out a little less a little bit.
Q: Plastic building template made of what material
Plastic template (that also can be said that the composite template)
Q: The price of raw materials can say better, is the PVC material.
Templates in accordance with the different prices of materials are also very different. The general plywood is 50-65 / sheet.
Q: Shear wall plastic template for the wall height and thick ratio requirements is how much?
Plastic building template to be extended when the expansion joints: As the plastic building template than the steel mold, wood mold thermal expansion coefficient larger, morning and evening laying plastic template must be reserved for about 2 mm expansion joints (according to the size of the day the temperature difference ), No need to reserve the expansion of the slit at noon. The length of the nail is generally 1.5 inches to 2 inches is appropriate, not too long or too short.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords