• Moving Walk System 1
Moving Walk

Moving Walk

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Set set
Supply Capability:
6000 Sets per Year set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing
Detailed Product Description

1.Modern designing and styles

2.Can operate normally in outdoor environment

3.Handrails with rich colors

 

\With many years' development, we have developed into a very potential vertical transportation equipment manufacturer.

Regarding customer satisfaction as our basic responsibility and providing excellent service, we have

attained ISO9001:2000 certification and also CE certification for MR elevators, MRL elevators &

escalators. In brief,

we would like to meet extra demands and are able to make every building more beautiful with more comfort and culture

enjoy by offering a full and comprehensive range of products.

Specification:

GRM15-I series of moving walk with 110-metar maximum horizontal length can operate normally in outdoor environment.

  

Application

Indoor. 16-hr operation daily

Horizontal span(m)

≤150

Inclination(°)

0-6

Step width(mm)

800/1000

Horizontal steps

/

Speed(m/s)

0.5

Capacity (per./h)

6750/9000

Main power

380V/50Hz/3P

Balustrade

Tempered glass(10mm)

Handrail bracket

Stainless steel

Handrail

Black

Balustrade height(mm)

900

Inner & outer decking

Hairline St.St.

Skirting

Wear resistant coating steel sheet

Step

Stainless steel

Landing plate

Stainless steel (anti-sliding)

llumination

lighting under upper & lower landing pallets

Indicator

Failure code indicator on control cabinet

Operation

Emergency stop button

Key switch

Inspection operation

Q: Elevator to the second floor, when the man turned out and smiled at her. When the door closes, she suddenly darling up to the third floor .. The woman is dead. Q: Do not cancel the third floor of the case how can let her survive? More
If you see it, the child is still running on the side of the elevator door .. assault .. then, run away .. there is a chance .. either is the door .. do not say no. It was boring for a few times before it was a few times .. It was the two hands and the left and right, and when it reached the floor, it would not open the door.
Q: What is the relationship between load bearing and area of elevator? Please know my friend tell me, thank you! More
GB GB8888-2003 in paragraph 8.2.1 has a table 800kg, 173 ~ 2.kg, 2.15 ~ 2.kg, 3.25 ~ 3.56
Q: What is the elevator called? A word in the smoke alarm. Thank you! Question added: fire switch, moving switch elevator will return to the first floor ... please explain some of the details ok, thank you! Reply: Thank you for the answer 紶 Flower official arrest dumpling rule evil spear, all good! But still do not quite understand that the fire elevator needs this switch, the fire is prohibited to use the elevator ---, do not fire the elevator did not return to the first floor? What else is an election ladder and an optional ladder? Thank you! More
Fire switch, moving switch elevator will return to the first floor. Fire lifts need this switch, the fire is prohibited when using the elevator.
Q: 1. Analysis of the reasons for the breakage of the elevator wire rope 2 Is the steel wire rope broken and the rest should be replaced at the same time? Where is the standard downloaded? More
It is recommended to use an elevator wire rope with 8 * 19S + FC, 8 * 19S + IWR, 8 * 19W + FC, 8 * 19W + IWR. The rope used for the elevator is generally divided into steel core and core. In the case of elevated height is not very high, the speed generally 1.75m / s below will use the core of the core. At a speed of 2m / s to 3m, you will use steel core. When the speed is higher, such as 6m / s or 8m / s will use the steel band
Q: Whether the elevator can be combined with the fire elevator
Choose to try to rely on convenience evacuation of the elevator. For the main part of high-rise civil buildings, the floor area of not more than 1500 square meters, should set up a fire elevator; more than 1500 square meters, less than 4500 square meters, should be set up two fire elevators; each floor area of more than 4500 square meters , Should be set up three fire elevator. The fire shaft of the fire elevator should be set separately, and no other electrical piping, water pipes, trachea or ventilation ducts shall pass. Fire elevator should be equipped with front room, the front room should be equipped with fire doors, so that it has a fire and smoke function. Fire elevator load should not be less than 1000 kg, the car's plane size should not be less than 1 m × 1.5 m, its role is to be able to carry large-scale fire fighting equipment and life-saving stretcher.
Q: Yesterday, when the elevator is still not stop down, directly to the sky, I fell, hanging on the roof, the elevator did not know the elevator, the elevator did not know Where did this go? Thank you, help answer! More
The elevator is the ladder, the elevator can make people climb higher, symbolizes the fame. The dream of elevating the elevator to the sky means the name of the world, but dreams of falling down on the roof and not coming up, that symbolizes that you have risen to a relatively high and appropriate height In the show as the roof, if the sky is high above the crowd), this rise can be a school, career care child pole twist pony ghost song, thought or position. This dream for the elephant, indicates that you will want to rise to a relatively high and the appropriate height. congratulations
Q: My aunt made a house, a lower layer, four on the ground. Was designed to consider the design of the time when the road, but that there is no need to install the elevator to give up. But after the decoration did not feel that the elevator is not enough style of the room, she would like to install the elevator but worried that there will be no hoist will be more open than the plantation Bong Bao Bao is very troublesome, how to do this? Now the house has been made well, and then installed the elevator too late? She did not understand, let me ask, please advise, thank you friends. More
I had to help my relatives in an elevator show on the scene, see some very good home elevator. Like you like this, I suggest you look at a Cibes called the home elevator. Do not know your aunt home now house the number of reserved space, there is no way it does not matter, their home elevator can be designed according to the space of the house, do not account for much of the place, at least only 1 square meter (do not know is not true). Say that your house there is a layer of the ground, if this pit is not easy to engage in, they do not need the end of the pit pit, can be installed down. It should be said that these, you have a good look, the site is not posted, so that posted ads, you go to Google can. Want to adopt ~ ~
Q: The above questions are in the civil design code 6.8.1. But do not know what reason. More
Just to prevent more than 4, the elevator came to see it, because the elevator hall into the deep limited, it may not know the elevator door opened. The The...
Q: Vertical elevators between the two kamels distance 11m must be installed in the middle of the security door?
Yes, according to the provisions of (1) when the adjacent two-door gate of the gap between the big tiger gong port harboring locust song Wei linked to 11m, during which should be set to a height of not less than 1.80m, width of not less than 0.35m of the well safety door (3) the door should be installed with a key to open the lock, when the door is open without a key to be able to close and lock, after the door locked (after the door is locked) , The key can be opened from the hoistway; (4) the electrical safety device should be provided to verify the door closed
Q: Recently look at the norms, the definition of these places more and more blurred, has been Mongolia, please help explain, thank you! More
Oh, you take the definition of these, to find a high-rise building, to that contrast under the like, these are a definition of auxiliary tripod-lang visit Temple poem, you do not know, as long as you know the boundaries of his door All right...
We have introduced production facilities and inspecting equipments with advanced world levels from Germany, Italy and other countries, so that keeps a manufacturing capacity about 40,000 sets as annual output, which is a large-scale and modern manufacturing enterprise, facing the global market for elevators, escalators and parking system equipments.

1. Manufacturer Overview

Location Zhejiang,China (Mainland)
Year Established 2007
Annual Output Value Above US$100 Million
Main Markets 90.00% Domestic Market
2.90% Southeast Asia
2.10% Eastern Asia
1.50% South America
1.20% South Asia
1.00% Africa
0.60% Mid East
0.50% Central America
0.20% Oceania
Company Certifications Machine Roomless Passenger Lift CE Certificate; Passenger Lift CE Certificate

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port Shanghai port
Export Percentage 11% - 20%
No.of Employees in Trade Department 11-20 People
Language Spoken: English, Chinese, German
b) Factory Information
Factory Size: Above 100,000 square meters
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords