Best Moving Walk
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Set unit
- Supply Capability:
- 6000 Sets per Year unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detailed Product Description
1) Effective and energy-saving
2) Green environmental protection
3) Stable and reliable
4) Space-saving & Low noise
Advanced control system and driving device, superior chain, excellent workmanship assures the comfortable operation.
Standard configuration
Application |
Indoor. 16-hr operation daily |
Horizontal span(m) |
≤40 |
Inclination(°) |
10/11/12 |
Step width(mm) |
800/1000 |
Horizontal steps |
400 |
Speed(m/s) |
0.5 |
Capacity (per./h) |
6750/9000 |
Main power |
380V/50Hz/3P |
Balustrade |
Tempered glass(10mm) |
Handrail bracket |
Stainless steel |
Handrail |
Black |
Balustrade height(mm) |
900 |
Inner & outer decking |
Hairline St.St. |
Skirting |
Wear resistant coating steel sheet |
Step |
Stainless steel |
Landing plate |
Stainless steel (anti-sliding) |
llumination |
lighting under upper & lower landing pallets |
Indicator |
Failure code indicator on control cabinet |
Operation |
Emergency stop button Key switch Inspection operation |
- Q: Respectively, under what circumstances
- The difference is that the closed staircase without smoke before the room, while the smoke staircase between the bustling house shares Yijiao turtle tied tyrants have smoke before the room. Anti-smoke staircase ladder and fire elevator combined with the area of the front room, public buildings should not be less than 10.00m2, residential buildings should not be less than 4.50m2, residential buildings should not be less than 4.50m2; Less than 6.00m2. According to the "high-rise civil building design fire safety requirements" requirements, a class of buildings and in addition to the unit and the corridor-style residential building height of more than 32m of the two types of buildings and tower residential, nineteen and nineteen level apartment , More than eleven layers of corridor-style residential, can not be directly natural lighting and natural ventilation of the staircase, should be set to smoke staircase.
- Q: What are the requirements of the fire function of the elevator?
- 1, in the first layer of firefighters with a dedicated landing button or switch factory shift bite to help save the trip to seek leopard 2, forced landing time <60 seconds 3, bottom of the anti-water or drainage measures
- Q: How to set the elevator shaft
- There is a special quota, 01 quota is 3-85,04 quota is 5-29, according to the design conversion.
- Q: The main difference between the elevator and the engine room elevator on the installation
- Organic room elevator and no machine room elevator, as the name suggests, is a separate room, a no separate room. General organic room elevator will be in the top of the elevator set up a separate room, called the elevator room. The main role is to put some related equipment in the engine room. No machine room elevator, that is not alone to leave an elevator room. Then the elevator some of the relevant equipment directly into the elevator shaft. From this point of view, the organic room elevator compared to the place, need to separate it with a room, no room, although not occupying the place, but the shaft had to do wide, deep point, because the equipment in the shaft. In addition, the structural professional impact is relatively large or no hook beam. General structure on the roof of the elevator room will be dedicated to set up a hook beam, its use is not used to lift the elevator, is used for maintenance. Such as the elevator is broken, you need to repair the time, have to hang up the relevant equipment and cars or pull up to repair, then you need to use the hook beam. There is a hook on the hook beam, is bent with a round steel bar, the hook will play a role in the maintenance. No machine room elevator related equipment is installed directly on the side wall of the hoistway, so do not need to set the hook beam, and the organic room elevator, you need to set up in the elevator room roof hook beam. This is the difference between the elevator room and the elevator room for the structural professional.
- Q: Will the different elevator manufacturers describe how to force the closure of this function? There is the door is divided into large door sets and small door sets, door sets and small door sets of parameters which? Which heroes Dingzhuang melon melon cover cover sorrowful twins to help me, be grateful! The The More
- Emergency electric operation control For the manpower operation to enhance the load capacity of the car with the required load capacity greater than 400N of the elevator drive the host, the engine room should be set to meet the requirements of an emergency electric running switch. The elevator drive mainframe should be powered by a normal power supply or by a standby power supply (if any). The following conditions should also be met: 1) The emergency electric operation switch should be operated from the machine room, and the car is operated by a button that continuously presses against the protection against misoperation. The direction of operation should be clearly marked; 2) emergency electric operation switch operation, in addition to the control by the switch, the car should be to prevent all the operation. 3) The emergency electric operation switch itself or through another electrical switch that meets the requirements shall invalidate the following electrical installations: (1) electrical safety devices on the safety gear; (2) the safety of the electrical (3) electrical safety devices on the car overclocking protection device; (4) limit switches; (5) electrical safety devices on the bumper. 4) The emergency electric running switch and its operating button should be set to be easy to observe the elevator drive host directly when used; 5) The car speed should not be greater than 0.63m / s.
- Q: PLC control elevator advantages of the problem added: the best details more points
- Plc itself is stable, under normal circumstances will not crash problem. Plc programming flexibility, the procedure can be amended, you can also use the counter in the program, the timer and other design elevator operation times, if the party does not give money to allow the elevator to disable.
- Q: Want to install the camera in the elevator can be detected in the monitoring room! The Do not have to be wired! Who can give one! Ming Dan tiger measured mortar Yao hinged surprise break off the program! Best with a schematic! More
- The elevator has a dedicated video cable, usually in the upper and lower elevations of the elevator in the middle of the line, the elevator stopped at the bottom, the first to reach the most of the tiger test grid Yao hinged off the next busy and leave the corresponding margin, so the elevator to the most Above and to the bottom of the cable will be able to. Cable must use elevator dedicated video cable.
- Q: Why is the elevator in the Zifu Fu letter of the gearless traction machine do not use the upstream overspeed protection of the rope device? More
- It will not slip car!
- Q: What is the meaning of E and F in the elevator?
- To see what model you are the elevator alone is a letter can not answer the elevator and elevator models represent the meaning of different
- Q: Just signed 500 shares happy elevator, the first time, is expected to earn much money?
- I also signed 500 shares
1. Manufacturer Overview
Location | Zhejiang,China (Mainland) |
Year Established | 2007 |
Annual Output Value | Above US$100 Million |
Main Markets | 90.00% Domestic Market 2.90% Southeast Asia 2.10% Eastern Asia 1.50% South America 1.20% South Asia 1.00% Africa 0.60% Mid East 0.50% Central America 0.20% Oceania |
Company Certifications | Machine Roomless Passenger Lift CE Certificate; Passenger Lift CE Certificate |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Shanghai port |
Export Percentage | 11% - 20% |
No.of Employees in Trade Department | 11-20 People |
Language Spoken: | English, Chinese, German |
b) Factory Information | |
Factory Size: | Above 100,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range | Average |
Send your message to us
Best Moving Walk
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Set unit
- Supply Capability:
- 6000 Sets per Year unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords