SC200/200 Frequency conversion construction hoist (III type A&C)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 3 unit
- Supply Capability:
- 300 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
(1)Creativeintroduce design philosophy single reducer dual output, the successful trial of a recyclable waste rack unit modular dual output construction lifts, lift the rack and pinion contact stress decreased by 50%, the transmission of the modular units can maximize the elimination of the error superimposed gear pair in the rack height direction, so that the whole movement is very smooth, greatly improving the rack and pinion and other key pieces of the life of this technological innovation for three national patents.
(2)A kind of automatic leveling floor, overload protection control and floor call, the three-in-one smart console application. Construction hoist intelligent automatic leveling floor, to ensure that the hoist can accurately place, to reduce machine wear and impact, and also slow down the drivers frequent operation of the degree of fatigue.
(3)Integrated operating room, frequency control system integration cabin. To strengthen safety and real using of hoist cage top job, at the same time greatly improve the aesthetic effect of the engine, the technology won the national patent.
(4)Advanced frequency control system. The construction elevator VVVF frequency control electrical control system adopts the most advanced frequency control and microcomputer programmable logic controller (PLC) control. Frequency control technology make the motor start, the braking process variable speed, ease the mechanical impact, and increased running stability, extended machine life. Brake can be achieved a zero speed, thereby extending the life of the brake. Frequency control system with a current limiting function, leaving the motor difficulty in starting the motor starting current, reducing the impact on the grid to ease the impact of the site electrical equipment, not because of the long distance power supply cable voltage drop. Frequency control system further comprising: overvoltage, undervoltage, overcorrect, overload, prevent stalling and other security features.
- Q: How many meters are needed to build a lift?
- Residential Design Code clearly states: seven or more residential or residential entrance floor from the outdoor design of the ground height of more than 16m residential must be set up the elevator. Note: ① the bottom of the store or other space as a multi-storey residential, the entrance floor of the building from the building's outdoor design of the ground height of more than 16m must be set up the elevator; ② the bottom of the floor or storage space of multi-storey residential, The entrance floor of the household entrance from the building outside the ground height of more than 16m must be set up the elevator; ③ the top floor of a set of two layers of thermocline residential, the thermocline part of the number of layers. The height of the building floor of the building is not more than 16m, the elevator can not be the elevator; ④ the middle layer of the building has the entrance to the outdoor ground and has a fire channel, the number of layers can be calculated from the middle layer ; In addition, "Office Building Design Code" also provides: 4.1.3 five and five floors above the office building should be set up elevator.
- Q: Always dream of their own sitting in the elevator, a person, such as I press the 10th floor, the elevator will rise to their own 70,80 floor so, after the fall and then what is the meaning of falling?
- The elevator usually hints at the cause of the business, and it is a hint of the state of the LZ business, or something that is down to earth, and nothing may fall. Another logic to explain, always appear and immortal dream is a memory, but because this memory may not be willing to slash the old lure is the LZ in this world, all because the rules of the game can only be in the dream Was recalled.
- Q: How to calculate the size of the elevator door how to calculate the area
- Length of length, bevel edge edge.
- Q: How to measure the safety dimensions of the elevator
- Bottom pit should have a 0.5m × 0.6m × 1.0m space. The distance between the bottom pit and the guide shoe, the safety gear and the door part is not less than 0.1m, and the distance between the other parts of the car is not less than 0.5m. The key to the actual impact of the depth of the pit is: (1) the distance that the bumper is fully compressed from the bottom of the car to the bottom of the hoistway; (2) when the end is flat, the car extends into the bottom pit The height of the buffer and the sum of the three. It is not difficult to find that the two together define the depth of the pit in a range that is difficult to substantially shrink: if the height of the buffer is excessively reduced, it is difficult to satisfy the previous condition; if the empty range is excessively reduced, The latter condition violates the national standard. If the pit depth exceeds the required size, it may cause the car to go beyond the national standard allowable value. In the case of not much, you can increase the buffer by the way to solve the base; if too much, only back to the bottom of the pit to the required depth.
- Q: Will the different elevator manufacturers describe how to force the closure of this function? There is the door is divided into large door sets and small door sets, door sets and small door sets of parameters which? Which heroes Dingzhuang melon melon cover cover sorrowful twins to help me, be grateful! The The More
- Different manufacturers of the size of the door is not the same, you can call to ask the specific, you can ask as to force the door to close the function of the spider melon melon cover cover sorrow fine, I only know that a situation is the elevator fire function , From the security layer to open the door after no one in the car automatically forced to close the door and no longer outside the call and call within the emergency operation is usually UPS function
- Q: 1, was asked whether the elevator shaft need to have legs, I would like to ask the cow in the end is what? 2, it is the elevator shaft in the excess part, or the necessary part? 3, if it is necessary, it should be responsible for the civil construction side, or the elevator is responsible for? 4 helium fudge silhouette every child Fu Fu, if it is redundant, that the elevator shaft had a cow, and whether the impact of the installation of the elevator? Please help people as soon as possible to help me, be grateful! More
- Can do it. Is a fixed use of the ground, is necessary to have, or the elevator side to do. Just the money.
- Q: I wear touch flat bark strong Du Zhicheng platinum is a property management novice, because the Lord to me to reflect the elevator did not signal. I do not know if this is related to the property? If so, what should the property management do? Please talk about the work related to the living together! Thank you very much! The The Questions added: please relevant senior people say that a little more! Thank you, oh! The The More
- 1, the elevator itself is indeed no mobile phone signal, or cell phone signal is weak. This phenomenon is related to the structural design of the elevator itself. The car used in the cell is a metal frame structure, so when the elevator door is closed, the elevator is like a metal cage inside. And this structure can effectively shield out the phone signal. 2, if the owners put forward the demand, as a property management agencies, property companies can contact the relevant telecommunications agencies in the elevator to install mobile phone signal amplifier for receiving signals. 3, the property company should also be scientific, rigorous attitude, to the owners from the theoretical explanation of the elevator no cell phone signal truth. If necessary, in the park bulletin board for the nature of the announcement. 4, in order to avoid community owners in the elevator in distress can not help through the phone. Elevator should be set to emergency alarm button, emergency intercom phone and camera. If the owners are in distress in the elevator, you can contact the property management department in time or help.
- Q: Hello, Hitachi Elevator is often a 38 fault is what reason. There are those cases he out of 38 failure, how to solve?
- Hello, Hitachi Elevator is often a 38 fault is what reason. There are those cases he out of 38 failure, how to solve?...
- Q: Just signed 500 shares happy elevator, the first time, is expected to earn much money?
- One thousand large pieces
- Q: Such as title
- It is a little more with the elevator is the real estate, and with the elevator real estate than the property management fee is a little more expensive. (This is my line of rules)
Send your message to us
SC200/200 Frequency conversion construction hoist (III type A&C)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 3 unit
- Supply Capability:
- 300 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords