SC200/200 Frequency conversion construction hoist (III type A&C)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 3 unit
- Supply Capability:
- 300 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
(1)Creativeintroduce design philosophy single reducer dual output, the successful trial of a recyclable waste rack unit modular dual output construction lifts, lift the rack and pinion contact stress decreased by 50%, the transmission of the modular units can maximize the elimination of the error superimposed gear pair in the rack height direction, so that the whole movement is very smooth, greatly improving the rack and pinion and other key pieces of the life of this technological innovation for three national patents.
(2)A kind of automatic leveling floor, overload protection control and floor call, the three-in-one smart console application. Construction hoist intelligent automatic leveling floor, to ensure that the hoist can accurately place, to reduce machine wear and impact, and also slow down the drivers frequent operation of the degree of fatigue.
(3)Integrated operating room, frequency control system integration cabin. To strengthen safety and real using of hoist cage top job, at the same time greatly improve the aesthetic effect of the engine, the technology won the national patent.
(4)Advanced frequency control system. The construction elevator VVVF frequency control electrical control system adopts the most advanced frequency control and microcomputer programmable logic controller (PLC) control. Frequency control technology make the motor start, the braking process variable speed, ease the mechanical impact, and increased running stability, extended machine life. Brake can be achieved a zero speed, thereby extending the life of the brake. Frequency control system with a current limiting function, leaving the motor difficulty in starting the motor starting current, reducing the impact on the grid to ease the impact of the site electrical equipment, not because of the long distance power supply cable voltage drop. Frequency control system further comprising: overvoltage, undervoltage, overcorrect, overload, prevent stalling and other security features.
- Q: The main difference between the elevator and the engine room elevator on the installation
- Organic room for the general after the heavy, no room for the general side of the team. Organic room generally 2 I-beam, no machine room is generally a I-beam, welcome to explore the elevator knowledge
- Q: How to measure the safety dimensions of the elevator
- Find GB7588 to see to know, very detailed
- Q: The woman came home and found to be a man tracking ... ... ... ... elevator to the second floor, the man turned out when she smiled ... when the door closed, she suddenly saw the man took out the knife to the third floor ... the results of a woman died. Q: Do not cancel the third floor of the case how can let her survive? More
- I think that as long as no elevator on nothing, because from the behavior of men obviously do not want to start from the elevator, may be afraid of the camera or other reasons, or do not have to wait for the elevator to the third floor, in the elevator to the second floor of the process can be In the elevator room to kill the woman, was not hands-on obviously scruples, so I judge the elevator to the third floor as long as the elevator will be able to life insurance, out of the elevator will die.
- Q: Rated capacity of 1050KG elevator on the weight because of how much (we are Fu Shida Elevator 1.75m / s) more
- Generally depends on your weight on the weight of the block to determine the number of single weight from the building and the use of materials (cement or cast iron, lead) and other changes to the weight = car weight + 0.5 * weight - weight Box car weight according to the manufacturers reported that the different models of different weight, generally in the 600 ~ 1000 ? ? ?,? ? ?,00 ? ? ? ? ? ? ? On the weight of a 50KG, 26 or so
- Q: As we all know, press the button, the elevator door will open, and each floor body has a door (Note: the door in the "floor"). But the elevator to pay for Cao Zhi 丨 pedal check boxing gnosis itself has a door? In other words, the elevator is a hexahedron or a pentahedron More
- The elevator car is a hexahedron. The elevator car itself has a door, and each time you pay for the floor, there is also a door, and when the elevator arrives at the floor, the two doors are opened at the same time.
- Q: Wow how the energy ship on the second floor
- Kill the old 2 after the walk, in that very long stairs opposite a lift of the elevator, from that up
- Q: What are the reasons for the elevator downtime?
- Holding the door lock safety circuit are likely to cause the inverter encoder
- Q: Where is the layer opener installed? Is the layer opener?
- Picker The The Is the car inside the control box, you can choose to go to the elevator floor! The
- Q: The above questions are in the civil design code 6.8.1. But do not know what reason. More
- Just to prevent more than 4, the elevator came to see it, because the elevator hall into the deep limited, it may not know the elevator door opened. The The
- Q: Hello, Hitachi Elevator is often a 38 fault is what reason. There are those cases he out of 38 failure, how to solve?
- 38 Run contactor disconnect fault
Send your message to us
SC200/200 Frequency conversion construction hoist (III type A&C)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 3 unit
- Supply Capability:
- 300 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords