• Single Construction Hoist SC 320 System 1
  • Single Construction Hoist SC 320 System 2
  • Single Construction Hoist SC 320 System 3
  • Single Construction Hoist SC 320 System 4
  • Single Construction Hoist SC 320 System 5
Single Construction Hoist SC 320

Single Construction Hoist SC 320

Ref Price:
get latest price
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
50 m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Guangxi Heqing Construction Machinery Manufacture,established in 2004, is a private enterprise specializing in R&D, designing, manufacturing, selling and leasing of construction machinery, mainly producing builder hoist, mast climbing work platform, superdeck loading platform, temporary suspended platform, building maintenance unit etc.

Taking product sale and leasing as the basic market strategy, the company has effectively built “Heqing” and provided steady cash flow. On one hand, it pushes the independently developed builder hoist, mast climbing work platform, superdeck loading platform, suspended platform and other standardization products to Germany, Sweden, Australia, Malaysia, Singapore, India, etc.; on the other hand, it energetically expands leasing business of builder hoist, superdeck loading platform, suspended platform and other products. Till now, we have established leasing branches in Guangxi, Beijing, Shanghai and etc. Besides, according to the different requirements of customers, our company actively develops design, production, sale and other business of building maintenance system, steel aluminum shuttering and other non-standard building machinery and metal parts.

High-quality technological management team and first-rate production and detection equipment lay good foundation for the steady development of the company. Its technology and management personnel, including many senior engineers, have college degree or above, and skilled workers mostly have vocational school degree or above. The company also has over 200 general and special production equipment and over 300 measuring instruments for detection. The company passed the certification of ISO9001 Quality Management System in 2002, providing reliable guarantee for the management system and product quality.  

Our “Heqing” concern requirements of modern city construction and strive to provide products with advanced technology and rational price, furnish good technical support and pre and after-sales service for customers. We hope to create beautiful future with customers.

Corporate Vision

Vision:Become an ever-green construction machinery enterprise and maximally meet customers’ requirements
Core Values】  
Quality: High quality, innovation, safety and reliability.
              High quality is the basis of the enterprise.
              Innovation is the soul of the enterprise.
              Safety is reverence to life.
              Reliability wins the trust.
Service: Customer focused, customers are existence value of Heqing people, do what we have promised.
Responsibility: Attentive and responsible, brave to undertake and fully perform individual, company and social responsibility.
Spirit
Hard Work:Industry, simplicity, perseverance and hardships are the source power of Yuhuaxing to achieve transnormal and leapfrog development.
Struggle:Concentrated reflection of brave advance, assiduous seeking, brave challenge and enthusiasm and progress of Heqing people.
Pioneering & Progress::Promote traditions, keep pace with the times, have the courage to innovate and pursue excellence in work

Q:What are the contents of the elevator property every day?
Regret the kitchen flue did not play out, and now as long as the building was cooking, their own off the hood must also open at the same time, or full of smoke
Q:What is the elevator room
Refers to the interior of the building to install the elevator building, the general high-rise and high-level are equipped with elevators, there are multi-storey elevator house, the number of layers is also high there are elevators.
Q:There are songs, the lyrics involved in "anyway, every day will take the elevator"
Dawn of the song about the elevator girl to see the name of the song is called "look at her"! Lyrics are as follows: Lyrics Name: Look at her Singer: Dawn Album: - Lyrics: lyricist: Zhen Jianqiang Composer: Lei Songde Arranger: Lei Songde You are my girlfriend disappeared for a week do not give an account of it only two minutes to keep the elevator girl But with me up the mountain You see her white gloves gently press the elevator fly the sky so high you have not thought to give me the same smile in every beautiful morning for my soul bath I want to see if she has a relationship Anyway, every day I will take the elevator I want to take a look at her You do not get angry anyway I want to love you can not see you no matter how I want to catch up with your belt to miss you should not the door did not open I guess her lipstick The color of this is not love love her crimson hat Let me think that the elevator inside never worry I think the distance will be less and less if she will be sorry I pretend to read the newspaper
Q:There is no exhaust fan in the elevator
There is no special exhaust fan inside the elevator, there are exhaust. Exhaust fan, driven by the electric fan to rotate the air flow, so that indoor and outdoor air exchange of a class of air-conditioning appliances. Also known as ventilation fan. The purpose of the exhaust is to remove the indoor air pollution, adjust the temperature, humidity and sensory effects. Exhaust fans are widely used in home and public places. An elevator is a motor-powered vertical lift with box-like pods for multi-storey construction or cargo. There are steps, stepping board mounted on the track for continuous operation, commonly known as escalators or automatic sidewalks. Serving the floor of the fixed lifting equipment. The vertical lift elevator has a car running between at least two rows of rigid or inclined rails with an inclination angle less than 15 °. Car size and structure to facilitate the passengers access or loading and unloading of goods.
Q:What is the elevator called? A word in the smoke alarm. Thank you! Question added: fire switch, moving switch elevator will return to the first floor ... please explain some of the details ok, thank you! Reply: Thank you for the answer 紶 Flower official arrest dumpling rule evil spear, all good! But still do not quite understand that the fire elevator needs this switch, the fire is prohibited to use the elevator ---, do not fire the elevator did not return to the first floor? What else is an election ladder and an optional ladder? Thank you! More
I am an elevator technician: I do not know if I am qualified to answer you. When the smoke alarm when the elevator is only in that layer of the generation of instructions, if the elevator fire switch after the elevator to the base station, not the second floor of the old sister's first floor, when the firefighters can use the driver's state of the elevator To rescue. OK may not be complete but it is for this reason.
Q:Conan has a set is the body hidden in the elevator, which is caused by overload ah
Is the 50th set of library killings
Q:What are the embedded parts in the elevator shaft?
If the shaft of the hoistway is a brick structure, it is necessary to set up a ring beam every 1500mm to 2000mm height in the hoistway (the first gear ring in the bottom of the hoistway is made up of 1500mm Set, from the second gear ring began to set by 2000mm, the top of the hoistway last gear ring by the floor 400mm set), ring beam height ≥ 300mm, elevator floor should be equipped with a beam on the edge, beam height 350mm, beam The width of the same width and the hoistway, and shall not protrude into the hoistway (the beam used to install the floor of the floor door) 2, the basement or other floor structure is not the structure of the floor, Along the beam with a beam height of ≥ 350mm, the length of the beam and the same width of the hoistway, and shall not protrude into the hoistway (this spoiled anger to drink sewn bucket bucket for the installation of the elevator floor gate) If the wall of the hoistway is a fully castable structure, it is not necessary to set the beam and the beam. If the wall of the hoistway is part of the cast - in - place structure, the position of the ring beam and the over - beam must be set.
Q:Solve this problem.
So that the elevator power
Q:What is the meaning of the upper limit of the ceiling?
To prevent the elevator out of control, in the end also put the wire, or to the top of the winding wire, or to the door that the reaction was slow, the elevator stopped in the middle of the floor, are limiter tube limit switch can be divided into upper and lower limits, Simply put on the stop switch and stop the switch. General limit and slowdown switch, limit switch installed together, from high to down in order, the upper limit - upper limit - on the strong reduction. The elevator pit and the top floor of the other group. When the elevator to run to the top of the time (from bottom to top), if the speed is very fast, will first encounter on the strong reduction, that is forced to slow down, the elevator began to slow down, and then hit the upper limit, this time the elevator should stop, Fast, it will encounter the last safety switch, the limit, this time the elevator safety circuit open, the elevator in the shock state, there will be crowded, if the speed soon soon, continue upward, this time the governor action, security Clamp the guide rails. The elevator stops.
Q:Whether the elevator can be combined with the fire elevator
Yes, but note that the car's net size can not be less than 1600 × 1550, and the elevator door net width can not be less than 1100. This allows a simple stretcher to enter and slam into the car, one minute to the first floor, and immediately lift the household lobby, sent to the ambulance.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches