Single Construction Hoist SC 320
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 50 m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Guangxi Heqing Construction Machinery Manufacture,established in 2004, is a private enterprise specializing in R&D, designing, manufacturing, selling and leasing of construction machinery, mainly producing builder hoist, mast climbing work platform, superdeck loading platform, temporary suspended platform, building maintenance unit etc.
Taking product sale and leasing as the basic market strategy, the company has effectively built “Heqing” and provided steady cash flow. On one hand, it pushes the independently developed builder hoist, mast climbing work platform, superdeck loading platform, suspended platform and other standardization products to Germany, Sweden, Australia, Malaysia, Singapore, India, etc.; on the other hand, it energetically expands leasing business of builder hoist, superdeck loading platform, suspended platform and other products. Till now, we have established leasing branches in Guangxi, Beijing, Shanghai and etc. Besides, according to the different requirements of customers, our company actively develops design, production, sale and other business of building maintenance system, steel aluminum shuttering and other non-standard building machinery and metal parts.
High-quality technological management team and first-rate production and detection equipment lay good foundation for the steady development of the company. Its technology and management personnel, including many senior engineers, have college degree or above, and skilled workers mostly have vocational school degree or above. The company also has over 200 general and special production equipment and over 300 measuring instruments for detection. The company passed the certification of ISO9001 Quality Management System in 2002, providing reliable guarantee for the management system and product quality.
Our “Heqing” concern requirements of modern city construction and strive to provide products with advanced technology and rational price, furnish good technical support and pre and after-sales service for customers. We hope to create beautiful future with customers.
【Corporate Vision】
Vision:Become an ever-green construction machinery enterprise and maximally meet customers’ requirements
【Core Values】
Quality: High quality, innovation, safety and reliability.
High quality is the basis of the enterprise.
Innovation is the soul of the enterprise.
Safety is reverence to life.
Reliability wins the trust.
Service: Customer focused, customers are existence value of Heqing people, do what we have promised.
Responsibility: Attentive and responsible, brave to undertake and fully perform individual, company and social responsibility.
【Spirit】
Hard Work:Industry, simplicity, perseverance and hardships are the source power of Yuhuaxing to achieve transnormal and leapfrog development.
Struggle:Concentrated reflection of brave advance, assiduous seeking, brave challenge and enthusiasm and progress of Heqing people.
Pioneering & Progress::Promote traditions, keep pace with the times, have the courage to innovate and pursue excellence in work
- Q: Elevator to the second floor, when the man turned out and smiled at her. When the door closes, she suddenly darling up to the third floor .. The woman is dead. Q: Do not cancel the third floor of the case how can let her survive? More
- It's so simple. Girl from the bag inside out of a submachine gun on the line
- Q: How can the elevator handle?
- First, (no matter how several floors) as soon as possible to each floor of the keys are pressed. Second, if there is a handle in the elevator, one hand clasped the handle. Third, the entire back with the head close to the elevator wall, was a straight line. Fourth, the knee was bent posture. concise!
- Q: As we all know, press the button, the elevator door will open, and each floor body has a door (Ji often irrigation end to kill the devil all the Han family note: the door in the "floor"). But the elevator itself has a door? In other words, the elevator is a hexahedron or a pentahedron More
- The elevator has a car door (the door of the elevator itself) and the door, the car door and the floor door are connected with the door knife and the doorball, and the door of the car door is closed
- Q: Respectively, under what circumstances
- Smoke staircase need to have pressurized air supply equipment, the need for a corresponding level of fire doors, the need for a certain area of the small room before the room. Closed stairs do not need to have these conditions. Smoke staircase set range: a class of buildings, more than 32m height of the two types of buildings (excluding units, corridor-style residential) and tower residential
- Q: What are the requirements of the fire function of the elevator?
- Fire elevator set requirements, there is a complete set of norms. Very detailed, very fine to the. Simply to you to talk about: just upstairs also said the point; have a dedicated button; top should not be greater than one minute; before the room to the outdoor shall not be greater than 30 meters, planting weight shall not be less than 800kg. These are just the most basic features. Its detailed settings, as well as the specific norms, there is a very complete to save. Such as the front room fire rating, the former room position, the front room area, smoke and smoke, the front room of the door, retaining facilities, ladder and car fire design requirements, electrical system, Leopard Mo fire design requirements. and many more. se are not a word or two can be clear, specifically you have to refer to the specification. Specification is not what one person said, is the fire law set, only in line with the norms to pass the acceptance.
- Q: The main difference between the elevator and the engine room elevator on the installation
- Organic room elevator and no machine room elevator, as the name suggests, is a separate room, a no separate room. General organic room elevator will be in the top of the elevator set up a separate room, called the elevator room. The main role is to put some related equipment in the engine room. No machine room elevator, that is not alone to leave an elevator room. Then the elevator some of the relevant equipment directly into the elevator shaft. From this point of view, the organic room elevator compared to the place, need to separate it with a room, no room, although not occupying the place, but the shaft had to do wide, deep point, because the equipment in the shaft. In addition, the structural professional impact is relatively large or no hook beam. General structure on the roof of the elevator room will be dedicated to set up a hook beam, its use is not used to lift the elevator, is used for maintenance. Such as the elevator is broken, you need to repair the time, have to hang up the relevant equipment and cars or pull up to repair, then you need to use the hook beam. There is a hook on the hook beam, is bent with a round steel bar, the hook will play a role in the maintenance. No machine room elevator related equipment is installed directly on the side wall of the hoistway, so do not need to set the hook beam, and the organic room elevator, you need to set up in the elevator room roof hook beam. This is the difference between the elevator room and the elevator room for the structural professional.
- Q: There is no exhaust fan in the elevator
- There are two fans on the top of the elevator car. However, some businesses in the decoration of the elevator car when the top closed, so the basic fan does not work.
- Q: What is the reason why the elevator door is always open and closed when not in use?
- Elevator control cabinet in the elevator door system board failure, usually 3 tube or capacitor is broken, get the maintenance of the car to hurt the factory to sell it off the board I am the same day before the same problem, just repair.
- Q: The above questions are in the civil design code 6.8.1. But do not know what reason. More
- Just to prevent more than 4, the elevator came to see it, because the elevator hall into the deep limited, it may not know the elevator door opened. The The...
- Q: Does the state require the number of floors above the elevator?
- 7 floor some good business 6 floor there will be
Send your message to us
Single Construction Hoist SC 320
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 50 m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches