Metal Layher Allround Scaffolding with En12810 Standard and SGS Certified CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Metal Layher Allround Scaffolding with En12810 Standard and SGS Certified
Type:
Material:
Lapping Form:
Framework:
Supporting Mode:
Erection Position:
Scaffolding Part Type:
Move Method:
Structural Style:
Surface Treatment:
Certificate:
Color:
Production Capability:
Delivery Time:
Export Markets:
Descriptions of Metal Layher Allround Scaffolding with En12810 Standard and SGS Certified
1. Standard:
3000mm, 2500mm, 2000mm, 1500mm, 1000mm, 500mm.
2. Ledger:
3000mm, 2000mm, 1780mm, 1500mm, 1000mm, 500mm.
3. Diagonal brace:
3000x2000mm, 1780x2000mm, 1000x1500mm, 1000x2000mm, 1500x2000mm.
4. Tube specification:
Φ 48.3x4.0mm, φ 48.0 x3.25mm, φ 48.0 x3.0mm.
5. Surface Finish:
Hot DIP Galv. Electric Galv.Powder coating, Dip Painting.
6. Material:
Q235, Q345
7. Certificate:
EN12810,SGS test report for loading capacity.
The Parts of Metal Layher Allround Scaffolding with En12810 Standard and SGS Certified
DESCRIPTION | MATERIAL | QTY. (PCS) | W. T. (KG/PC) | SURFACE |
3.00m standard | Q345 48.3*3.2mm | 1.00 | 15.3 | Hot-dipped Galvanized |
2.50m standard | Q345 48.3*3.2mm | 1.00 | 12.9 | Hot-dipped Galvanized |
2.00m standard | Q345 48.3*3.2mm | 1.00 | 10.5 | Hot-dipped Galvanized |
1.50m standard | Q345 48.3*3.2mm | 1.00 | 8.1 | Hot-dipped Galvanized |
1.00m standard | Q345 48.3*3.2mm | 1.00 | 5.7 | Hot-dipped Galvanized |
0.50m standard | Q345 48.3*3.2mm | 1.00 | 3.3 | Hot-dipped Galvanized |
2.00m ledger | Q345 48.3*2.5mm | 1.00 | 6.8 | Hot-dipped Galvanized |
1.80m ledger | Q345 48.3*2.5mm | 1.00 | 6.2 | Hot-dipped Galvanized |
1.50m ledger | Q345 48.3*2.5mm | 1.00 | 5.3 | Hot-dipped Galvanized |
1.20m ledger | Q345 48.3*2.5mm | 1.00 | 4.4 | Hot-dipped Galvanized |
0.90m ledger | Q345 48.3*2.5mm | 1.00 | 3.5 | Hot-dipped Galvanized |
0.60m ledger | Q345 48.3*2.5mm | 1.00 | 2.6 | Hot-dipped Galvanized |
2.00*2.00m brace | Q235 33.5*2.3mm | 1.00 | 7 | Hot-dipped Galvanized |
1.80*2.00m brace | Q235 33.5*2.3mm | 1.00 | 6.7 | Hot-dipped Galvanized |
1.50*2.00m brace | Q235 33.5*2.3mm | 1.00 | 6.4 | Hot-dipped Galvanized |
1.20*2.00m brace | Q235 33.5*2.3mm | 1.00 | 6.1 | Hot-dipped Galvanized |
2.00*1.50m brace | Q235 33.5*2.3mm | 1.00 | 6.3 | Hot-dipped Galvanized |
1.80*1.50m brace | Q235 33.5*2.3mm | 1.00 | 6 | Hot-dipped Galvanized |
1.50*1.50m brace | Q235 33.5*2.3mm | 1.00 | 5.6 | Hot-dipped Galvanized |
1.20*1.50m brace | Q235 33.5*2.3mm | 1.00 | 5.2 | Hot-dipped Galvanized |
0.90*1.50m brace | Q235 33.5*2.3mm | 1.00 | 4.9 | Hot-dipped Galvanized |
0.60*1.50m brace | Q235 33.5*2.3mm | 1.00 | 4.7 | Hot-dipped Galvanized |
2.00*1.00m brace | Q235 33.5*2.3mm | 1.00 | 5.8 | Hot-dipped Galvanized |
1.80*1.00m brace | Q235 33.5*2.3mm | 1.00 | 5.4 | Hot-dipped Galvanized |
1.50*1.00m brace | Q235 33.5*2.3mm | 1.00 | 4.9 | Hot-dipped Galvanized |
1.20*1.00m brace | Q235 33.5*2.3mm | 1.00 | 4.5 | Hot-dipped Galvanized |
0.90*1.00m brace | Q235 33.5*2.3mm | 1.00 | 4.1 | Hot-dipped Galvanized |
0.60*1.00m brace | Q235 33.5*2.3mm | 1.00 | 3.8 | Hot-dipped Galvanized |
2.00*2.00m brace | Q345 48.3*2.5mm | 1.00 | 10.2 | Hot-dipped Galvanized |
1.80*2.00m brace | Q345 48.3*2.5mm | 1.00 | 9.8 | Hot-dipped Galvanized |
1.50*2.00m brace | Q345 48.3*2.5mm | 1.00 | 9.2 | Hot-dipped Galvanized |
1.20*2.00m brace | Q345 48.3*2.5mm | 1.00 | 8.8 | Hot-dipped Galvanized |
2.00*1.50m brace | Q345 48.3*2.5mm | 1.00 | 9.1 | Hot-dipped Galvanized |
1.80*1.50m brace | Q345 48.3*2.5mm | 1.00 | 8.7 | Hot-dipped Galvanized |
1.50*1.50m brace | Q345 48.3*2.5mm | 1.00 | 8 | Hot-dipped Galvanized |
1.20*1.50m brace | Q345 48.3*2.5mm | 1.00 | 7.4 | Hot-dipped Galvanized |
0.90*1.50m brace | Q345 48.3*2.5mm | 1.00 | 7 | Hot-dipped Galvanized |
0.60*1.50m brace | Q345 48.3*2.5mm | 1.00 | 6.6 | Hot-dipped Galvanized |
2.00*1.00m brace | Q345 48.3*2.5mm | 1.00 | 8.3 | Hot-dipped Galvanized |
1.80*1.00m brace | Q345 48.3*2.5mm | 1.00 | 7.7 | Hot-dipped Galvanized |
1.50*1.00m brace | Q345 48.3*2.5mm | 1.00 | 7 | Hot-dipped Galvanized |
1.20*1.00m brace | Q345 48.3*2.5mm | 1.00 | 6.2 | Hot-dipped Galvanized |
0.9*1m brace | Q345 48.3*2.5mm | 1.00 | 5.6 | Hot-dipped Galvanized |
0.6*1m brace | Q345 48.3*2.5mm | 1.00 | 5.2 | Hot-dipped Galvanized |
0.88m board bracket | Q345 48.3*2.5mm | 1.00 | 9.5 | Hot-dipped Galvanized |
0.60m base collar down | Q235 38.1*4.5mm | 1.00 | 4.4 | Hot-dipped Galvanized |
0.60m base collar up | Q235 38.1*4.5mm | 1.00 | 5.2 | Hot-dipped Galvanized |
0.24*2.00m Plank | DX51D-Z80 | 1.00 | 8.2 | Hot-dipped Galvanized |
0.24*1.80m Plank | DX51D-Z80 | 1.00 | 7.5 | Hot-dipped Galvanized |
0.24*1.50m Plank | DX51D-Z80 | 1.00 | 6.5 | Hot-dipped Galvanized |
0.24*1.20m Plank | DX51D-Z80 | 1.00 | 5.5 | Hot-dipped Galvanized |
0.24*0.90m Plank | DX51D-Z80 | 1.00 | 4.5 | Hot-dipped Galvanized |
0.50*2.00m Plank | DX51D-Z80 | 1.00 | 15.3 | Hot-dipped Galvanized |
0.50*1.80m Plank | DX51D-Z80 | 1.00 | 14 | Hot-dipped Galvanized |
0.50*1.50m Plank | DX51D-Z80 | 1.00 | 11.9 | Hot-dipped Galvanized |
0.50*1.20m Plank | DX51D-Z80 | 1.00 | 9.9 | Hot-dipped Galvanized |
0.50*0.90m Plank | DX51D-Z80 | 1.00 | 7.9 | Hot-dipped Galvanized |
FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q: Standard for inspection of portal scaffolding
- The 1.2 Standard Specification for steel portal frame and accessories: vertical rod and the transverse diameter: 42.7 + 0.5 mm with an average of 42.9 with a wall thickness of 2.5 + 0.3 mm with an average of 2.45 cross brace: outer diameter of 25 + 0.5 mm with an average of 25.4 with a wall thickness of 2 + 0.3 mm average for 2.3 1.3 door frame and accessories the steel pipe and plate, the welding meets the conditions, allowing the use of the mechanical properties of Q235 steel are made of Q235 steel or better material; when using the tensile strength and yield strength of Q195 steel is low, without affecting the connection and construction conditions, allows for increasing the thickness of the way to make up for the strength the lack of.
- Q: I have to write a 1 page commentary on a geographical issue for school, and, I've never done that before.Could someone please tell me or link me to a very simple 'writing commentary' scaffold for beginners?Please?Thankyou :)
- A vegan alcoholic! A chuckle emerges, a laugh perhaps for a few more bobs. Absent the mind, nicely put.
- Q: The bottom of the cantilever scaffold must be provided with the sweeping rod
- Product quality certificate and inspection report. Rust must be replaced, not to be used to build the frame.
- Q: What is rolling scaffolding?
- Scaffold (pipe staging) that has wheels in the legs. Any metal scaffolding that you've seen can be fitted with wheels to make it mobile.
- Q: What are the characteristics of Pankou scaffolding
- Pankou scaffold has the advantages of low cost and high efficiency of the hitherto unknown advantage. Comprehensive consideration of the company's future worries, no need to worry too much about frequent accidents, high cost of substantive issues.
- Q: how long should i leave it before i change it, should i do it myself or go to the piercer to they can do it?and is it still normal for the pericing to hurt after quite a while of having it done?
- Hi :) You can change it after 4 months usually But sometimes it can take up to a year It depends on the person , everybody's body heals differently You should go back to your piercer and ask if it's healed enough to change the jewellery Yep , it's normal A scaffold piercing goes through the cartilage and cartilage piercings can take up to a year to fully heal :)
- Q: I have some scaffolding that I would like to use to build a temporary slide to my swimming pool. The slide I would like to be made out of the side parts which are the ones like rectangles with bars going across them and I have a variety of poles. I would then like to put a slippery tarpaulin on to the frame.But how would I hold the tarpaulin up, because the metal poles will be too short? So that if someone slid down it they would not just burst through the tarpaulin and hit the floor after hitting around five metal poles!
- Why would you even consider something like that? Obviously you kids and your family use this pool, why put them at risk making a temporary slide with scaffolding. Not a good idea.
- Q: Im a wimp for pain and im looking to get my scaffolding done. i want to know how painful it isI already have both lobs pierced and stretched to an 8mm, will the pain be similar to that?
- You sound like you have a low tolerance for pain if you say you're a wimp haha, which means yeah it'll probably hurt you. It'll hurt more than the lobes because it's cartilage, and for the same reason you'll hear a popping noise as the hole is made. You won't be taken over by deathly pain or anything like that, it'll probably be sensitive for a few days after too so careful not to knock it against anyone/ anything. But if you want it bad enough, the pain will be bearable.
- Q: i got my scaffold done quite a while ago and it still really hurts and is all lush and crusty,loli know it takes agessss to heal but could i take it out and put normall small earrings in each whole instead? Which would i have to use? thanks
- in my opinion you should ride it out and just clean it more often. not only will the piercings give you trouble if you try to change the earring now, the piercings themselves will move slightly and you won't be able to put an industrial bar back through it. if you can live with these go through with it, if not, wash often, rotate the bar constantly and avoid sleeping on it and getting your hair caught up in it. like you said, piercings in the cartilage are very sensitive and need time and nurturing so that they can heal properly.
- Q: Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
- To cover your A** in case of injury or an inspection.
Send your message to us
Metal Layher Allround Scaffolding with En12810 Standard and SGS Certified CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords