• Allround Scaffolding Steel Comply with layher standard CNBM System 1
  • Allround Scaffolding Steel Comply with layher standard CNBM System 2
Allround Scaffolding Steel Comply with layher standard CNBM

Allround Scaffolding Steel Comply with layher standard CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
10 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: RS

  • Material: high strength tube

  • Surface: paint/ galvanized

  • Type: allround scaffolding

  • Certification: EN 12811

2.Packaging & Delivery

Packaging Details:Pallet

Delivery Detail:According to order quantity

3.Product Description

Model No: RS

Product Name:  Allround Scaffolding

4.Features:

1. Standard:  Made of 48mm O.D. x 3.2mm thickness high grade steel tube, 1 discal leg 0.5meter, Length: 3000, 2500, 2000, 1500, 1000, 500mm etc. Available, and can be to ordered by you,

2. Ledger: Made of 48mm O.D. x 3.2mm thickness high grade steel tube, length800mm/ 1500mm, length can be ordered.

3. Ring: Made from cast-steel or pressed steel

4. Ledger connection-peg: made from cast-steel,

5. Base screw jack: length 600mmx3.5mm thickness strength tube, length to be order, solid tube available.

6. U head screw jack: length600mmx3.5mmthickness strength tube with U head plate, length can to be order, solid tube available.

7.  Surface: painted/electro (hot dipped) galvanized or to be order

8.  Also can manufacture it as your requirement

5.

Ring   Lock System Scaffold Bay Brace / Diagonal Brace

Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring Lock Bay Brace 1520x2000mm (5')

7.91

17.45

AR.DB.1220x2000

Ring Lock Bay Brace 1220x2000mm (4')

7.62

16.80

AR.DB.1150x2000

Ring Lock Bay Brace 1150x2000mm (3'10")

7.53

16.61

AR.DB.1065x2000

Ring Lock Bay Brace 1065x2000mm (3'6")

7.44

16.41

AR.DB.910x2000

Ring Lock Bay Brace 910x2000mm (3')

7.29

16.07

AR.DB.650x2000

Ring Lock Bay Brace 650x2000mm (2'2")

7.08

15.62

AR.DB.610x2000

Ring Lock Bay Brace 610x2000mm (2')

6.90

15.21





AR.DB.3072x2000

Ring Lock Bay Brace 3072x2000mm

10.95

24.14

AR.DB.2572x2000

Ring Lock Bay Brace 2572x2000mm

9.89

21.81

AR.DB.2072x2000

Ring Lock Bay Brace 2072x2000mm

8.93

19.69

AR.DB.1572x2000

Ring Lock Bay Brace 1572x2000mm

8.10

17.86

AR.DB.1400x2000

Ring Lock Bay Brace 1400x2000mm

7.86

17.33

AR.DB.1286x2000

Ring Lock Bay Brace 1286x2000mm

7.71

17.00

AR.DB.1088x2000

Ring Lock Bay Brace 1088x2000mm

7.47

16.47

AR.DB.1036x2000

Ring Lock Bay Brace 1036x2000mm

7.41

16.34

AR.DB.1020x2000

Ring Lock Bay Brace 1020x2000mm

7.40

16.32

AR.DB.880x2000

Ring Lock Bay Brace 880x2000mm

7.26

16.01

AR.DB.732x2000

Ring Lock Bay Brace 732x2000mm

7.14

15.74





AR.DB.3000x2000

Ring Lock Bay Brace 3000x2000mm

10.77

23.75

AR.DB.2500x2000

Ring Lock Bay Brace 2500x2000mm

9.74

21.48

AR.DB.2000x2000

Ring Lock Bay Brace 2000x2000mm

8.80

19.40

AR.DB.1500x2000

Ring Lock Bay Brace 1500x2000mm

8.00

17.64

AR.DB.1000x2000

Ring Lock Bay Brace 1000x2000mm

7.38

16.27





AR.DB.2400x2000

Ring Lock Bay Brace 2400x2000mm

9.55

21.06

AR.DB.1800x2000

Ring Lock Bay Brace 1800x2000mm

8.47

18.68

AR.DB.1200x2000

Ring Lock Bay Brace 1200x2000mm

7.60

16.76

AR.DB.900x2000

Ring Lock Bay Brace 900x2000mm

7.28

16.05

6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Allround Scaffolding Steel Comply with layher standard CNBM

Q: I'm asking this in favour of my friend who currently has no internet.She had her scaffold piercing done about 2 days ago and today it got knocked and started bleeding. It's been bleeding for about 3 hours now and she's worried about it.
First you gotta stop touching it, that's probably causing the irratation, hence bleeding. IT'll take time to heal, just leave it alone clean out the blood every hour or so, BE CAREFUL! and LEAVE IT IN!
Q: I got mine done this morning, and like the dumba** I am, I got it on the side that I sleep on. A friend of mine said she slept on hers the first night and didn't hurt and it was fine, but I don't believe that to be true. If I have to sleep on my other side, I could but it's very hard for me to fall asleep like that, and I often switch positions while asleep unconsciously. Any tips?
Unless you take it out, there isn't much you can do. To help me fall asleep (I'm a side sleeper btw) I lie on my back, close my eyes and stay super still. I don't think about anything, just picture all black. I breathe in and out slowly, holding my breath each way. I usually fall asleep no problem that way. You will probably turn in your sleep, you will just need to see how it is tomorrow I guess :)
Q: Does it matter what size your ear is when you get an industrial/scaffolding piercing?
no doesn't matter.
Q: I had my scaffolding piercing done on tuesday (now sunday) and it is still really painful and sore. But my main concern is that the skin under the bar looks like it's being pushed down and the skin is growing around the bar? Is this bad?
Yes it is bad if I looks as if it has the skin growing around it. I would see your piercer about that.
Q: What is a new type of scaffolding?
principleSocket type steel pipe scaffold with novel and beautiful, solid plug and socket welding steel as the connecting piece, Q235 steel shots component, the vertical rod is in a certain length of the rigid pipe at regular intervals on a socket welding (as shown below, the top structure) with 57 cylinder connecting rod. The cross bar is welded at the two ends of the steel pipe. The vertical rod is a vertical force member, and is composed of a horizontal rod and a tie. Connection point of the support, can withstand the bending moment, shear and torque, so as to form a space support structure is good overall stability.
Q: how much does a scaffolding business earn a year?
The amount earnt very much depends on the size of the business, contacts within the industry, membership of industry associations and the country that you are operating in.
Q: I'm wanting to get a part of my ear pierced in the summer,which should I get,how much do each hurt,what is the healing period for each.I am getting it in the summer so it has time to heal before I go back to school,Help??
I even have the two piercings and function diverse evaluations on the two one in all them. in my opinion the cartilage piercings harm greater and grew to become right into a greater problematic healing technique then the nostril. I even have 3 helix piercings and the discomfort did no longer final to long grew to become into only sore after the preliminary couple days and of path the piercings themselves. My nostril piercing i in my opinion did no longer have any discomfort with it. there grew to become right into slightly pinch and that grew to become into involved approximately me it did no longer harm after in any respect.
Q: What is the difference between the new type of scaffold and the scaffold?
2, convenient operation: the connection frame, a self-locking capability, flexible assembly and disassembly is simple and easy to master workers, pitched, demolition work efficiency than the bowl type multifunctional scaffold fastener is three times, 20 times higher.3, reduce costs: the same conditions of large space three-dimensional scaffold, the new building quick dismantling scaffold material consumption than the bowl buckle type multifunctional scaffolding less, with the specification of a single bar weight than the bowl buckle type multifunctional scaffolding light.4, saving materials: the most suitable for the new type of formwork keel early demolition, through early demolition can save a lot of keel, formwork and support rod, saving about 30%.
Q: im in the midwest
we bought 9' planks here in AZ. and paid $50.00 each. pressure treated and a bolt thru them, they are $65.00
Q: Im going to get a scaffold.how much are they and 1 being no pain and 10 being the worse what would be your rate on the pain 1-10
I would say about a 6 maybe 7... and its a pain for the first few months.. like it gets sore if you lay on it to much ect :)

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords