Spunbond Nonwoven Geosynthetics For Construction
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1*20FCL m.t.
- Supply Capability:
- 100 Million M2 Per Year m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Technical specification of long fiber spunbond Nonwoven geotextile:
Density | Thickness | Breaking Strength | Elongation of Fracture | CBR Bursting Strength | Vertical Penetration Parameter | Equivalent Aperture |
g/m2 | mm | KN/m | % | KN | cm/s | O95mm |
65 | 1.2 | 2.8 | 40 ~ 80 | 0.7 | K x (10-1 ~ 10-3)
(K = 1.0 ~ 9.9) | 0.07 ~ 0.2 |
75 | 1.4 | 3.3 | 0.8 | |||
100 | 1.6 | 5.0 | 0.95 | |||
150 | 1.52 | 7.5 | 1.5 | |||
160 | 2.0 | 8.5 | 1.60 | |||
200 | 2.4 | 11 | 2.10 | |||
250 | 2.8 | 14 | 2.60 | |||
300 | 3.4 | 16 | 3.20 | |||
400 | 4.0 | 21 | 4.0 | |||
500 | 4.5 | 25 | 4.8 |
Features of Nonwoven geotextile:
Good flexibility, permeability, filtration, separation and easy for construction.
Application of Nonwoven geotextile:
Geotextile has excellent permeability, acquired, durability, which can be widely used in railway, highway, movement hall, Dams, hydraulic structures, hence hole, coastal shoal, reclamation, environmental protection and other projects. The main products are Synthetic staple fibers needle punched non woven geotextiles and slit and spilt film yarn woven geotextiles.
- Q: Can the cushion on the prefabricated board floor be dug?
- Prefabricated board floor layer of cement layer is not called the cushion, should be called leveling layer, this layer can be removed, but be careful not to damage the prefabricated plate.
- Q: The cushion is usually in the housing which parts
- There was no other place in the house below
- Q: Do you need a cushion for roof waterproofing?
- There is no "cushion" on the roof, and there is a concrete cushion under the basement floor. What you said may be leveling, is the base of the waterproof layer.
- Q: Is it possible to make a waterproof layer
- 1, to do after the dry do, or prone to the phenomenon of wall skin off.
- Q: Basement cushion waterproof
- Third, the membrane waterproof in the construction should first do the basement floor of the waterproof, and then the membrane along the basement floor continuous paste to the outer surface of the wall. Basement floor waterproofing first in the foundation pouring C10 concrete cushion, the thickness of about 100mm. And then paste the membrane, and then in the coil to wear 20 thick 1: 3 cement mortar, and finally pouring reinforced concrete floor. The outer surface of the wall first wip 20mm thick 1: 3 cement mortar, cold base oil, and then paste the membrane, the membrane should be stitched paste, adjacent coil lap width of not less than 100mm. The top of the coil should be higher than the maximum water level of about 500mm, the outer side of the brick wall.
- Q: Can the floor tiles be removed from the cement mats on the prefabricated board floor?
- Cement cushion as a leveling layer on the floor, not designed to the structure of the load-bearing, the general can be dug, the cushion is generally 3 to 5 cm, chisel in addition to unloading the floor of the heavy objects, chisel in addition to the use of strong vibration Machine or penetrating machine is too large, with a small hammer small chisel, along the horizontal plane horizontal chisel, stripping cement cushion.
- Q: What is the relationship between the cushion and the ring beam?
- Ring beam is reinforced concrete. Is to increase the overall wall and overall stiffness, improve the side resistance performance, according to the earthquake or masonry specifications set. There may be in the ground wall, there may be in the underground wall.
- Q: Large area ground concrete cushion seam Why is the separation of joints generally concrete
- hird, the relevant parts Different types of rigid waterproof layer separation spacing in addition to meet the calculation needs, but also in the following parts set sub-grid joints. 1. The deformation of the roof structure sensitive parts; 2. Roof and roof drainage direction changes; 3. The junction of the waterproofing layer and the protruding roof structure; 4. Under normal circumstances, each bay load-bearing walls should be set sub-grid seam. 5. Between the waterproof layer and the load-bearing or non-load-bearing parapet or gable should be set sub-grid joints, and in the node structure for proper treatment.
- Q: Why calculate the amount of time to count a lot of cushion ah
- ? In the municipal engineering, the bedding layer is a structural layer between the grassroots and the soil foundation. When the soil temperature is bad, the water temperature of the soil is improved and the water stability and frost resistance of the pavement structure are improved. Diffusible load to reduce soil deformation.
- Q: Maintenance time of the cushion on the roof of the building
- for the incorporation of retarding admixture or impermeable concrete , Not less than 14d;
1. Manufacturer Overview
Location | Shangdong, China |
Year Established | 2010 |
Annual Output Value | Above US$ 50 Million |
Main Markets | America; Europe; Asia |
Company Certifications | ISO 9001; ISO 14001 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Qindao; Yantai |
Export Percentage | 50% - 100% |
No.of Employees in Trade Department | 6-10 People |
Language Spoken: | English; Chinese |
b) Factory Information | |
Factory Size: | 40000square meters |
No. of Production Lines | Above 5 |
Contract Manufacturing | OEM Service Offered; Design Service Offered |
Product Price Range |
Send your message to us
Spunbond Nonwoven Geosynthetics For Construction
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1*20FCL m.t.
- Supply Capability:
- 100 Million M2 Per Year m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords