Nonwoven Geosynthetics
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1*20FCL m.t.
- Supply Capability:
- 100 Million M2 Per Year m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Introduction of Nonwoven Geosynthetics:
Good flexibility, permeability, filtration, separation and easy for construction.
Application of Nonwoven Geosynthetics:
Geotextile has excellent permeability, acquired, durability, which can be widely used in railway, highway, movement hall, Dams, hydraulic structures, hence hole, coastal shoal, reclamation, environmental protection and other projects. The main products are Synthetic staple fibers needle punched non woven geotextiles and slit and spilt film yarn woven geotextiles.
Specifications:
Technical specification of long fiber spunbond Nonwoven geotextile
Density |
Thickness |
Breaking Strength |
Elongation of Fracture |
CBR Bursting Strength |
Vertical Penetration Parameter |
Equivalent Aperture |
g/m2 |
mm |
KN/m |
% |
KN |
cm/s |
O95mm |
65 |
1.2 |
2.8 |
40 ~ 80 |
0.7 |
K x (10-1 ~ 10-3)
(K = 1.0 ~ 9.9) |
0.07 ~ 0.2 |
75 |
1.4 |
3.3 |
0.8 | |||
100 |
1.6 |
5.0 |
0.95 | |||
150 |
1.52 |
7.5 |
1.5 | |||
160 |
2.0 |
8.5 |
1.60 | |||
200 |
2.4 |
11 |
2.10 | |||
250 |
2.8 |
14 |
2.60 | |||
300 |
3.4 |
16 |
3.20 | |||
400 |
4.0 |
21 |
4.0 | |||
500 |
4.5 |
25 |
4.8 |
- Q: Do you need a cushion on the ground floor?
- Chalet recommended to do sloping roof, the lowest point suggested 2.4. Talk about the ground, the roof, the wall area divided by the length of your board length and width of the area can be calculated on the amount of it!
- Q: Roof waterproof mattress should play the number of centimeters appropriate
- ? 3. The first layer to do flexible waterproof, that is, roof-specific anti-aging waterproof coating.
- Q: Is it possible to make a waterproof layer
- 3, waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5 -8 hours) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
- Q: Is the raft cushion waterproofing full of the cushion?
- The request is full. Raft foundation do not do waterproof mainly depends on the design of the groundwater level considerations, calculated if the floor itself to meet the requirements, you can not do, and not rigid to do.
- Q: Can the floor tiles be removed from the cement mats on the prefabricated board floor?
- Cement cushion as a leveling layer on the floor, not designed to the structure of the load-bearing, the general can be dug, the cushion is generally 3 to 5 cm, chisel in addition to unloading the floor of the heavy objects, chisel in addition to the use of strong vibration Machine or penetrating machine is too large, with a small hammer small chisel, along the horizontal plane horizontal chisel, stripping cement cushion.
- Q: Cushion, waterproof layer construction to do what information
- 3, waterproof layer: In order to prevent the rain into the roof, groundwater into the wall, basement and underground structures, indoor water into the floor and walls and other materials layer.
- Q: What is the relationship between the cushion and the ring beam?
- There is no direct relationship between the cushion and the ring beam.
- Q: What is the waterproof layer and the waterproof cushion in the tile roof?
- In the tile roof, to wait for the waterproof layer after the dry layer, or prone to the phenomenon of wall off. Waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5-8 Hour) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
- Q: Why calculate the amount of time to count a lot of cushion ah
- Cushion cushion, as the name suggests is the structure of the liner layer, mainly from the back cover of the role, generally in the engineering design drawings have a clear approach (material).
- Q: Maintenance time of the cushion on the roof of the building
- for the incorporation of retarding admixture or impermeable concrete , Not less than 14d;
1. Manufacturer Overview
Location | Hebei, China |
Year Established | 2004 |
Annual Output Value | Above US$ 100 Million |
Main Markets | Europe; East Asia; America |
Company Certifications | ISO 9001 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Qindao; Tianjin |
Export Percentage | 50% - 100% |
No.of Employees in Trade Department | 6-10 People |
Language Spoken: | English; Chinese |
b) Factory Information | |
Factory Size: | 6 million square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | OEM Service Offered; Design Service Offered |
Product Price Range |
Send your message to us
Nonwoven Geosynthetics
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1*20FCL m.t.
- Supply Capability:
- 100 Million M2 Per Year m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords