• Short Fiber Nonwoven Geotextile System 1
  • Short Fiber Nonwoven Geotextile System 2
  • Short Fiber Nonwoven Geotextile System 3
Short Fiber Nonwoven Geotextile

Short Fiber Nonwoven Geotextile

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

made of polyester or polypropylene fiber
good burying, hydrolyzation & corrosion resistibility

Density

Thickness

Breaking Strength

Elongation of Fracture

CBR Bursting Strength

Vertical Penetration Parameter

Equivalent Aperture

g/m2

mm

KN/m

%

KN

cm/s

O95 mm

65

1.2

2.8

40 ~ 80

0.7

K x (10-1 ~ 10-3)

(K = 1.0 ~ 9.9)

0.07 ~ 0.2

75

1.4

3.3

0.8

100

1.6

5.0

0.95

150

1.52

7.5

1.5

160

2.0

8.5

1.60

200

2.4

11

2.10

250

2.8

14

2.60

300

3.4

16

3.20

400

4.0

21

4.0

500

4.5

25

4.8


Q: The top floor made waterproof playing cushion layer of how to do
3. The first layer to do a flexible waterproof, try the valve Bai fat together with the full bricks that are roof-specific anti-aging waterproof coating.
Q: The roof cushion is waterproof on the slope roof
When the moisture generated by the ice dam into the external walls of the gap, the walls and insulation layer will become damp, which is the ideal environment for the breeding of mold.
Q: Basement cushion waterproof
First, the basement moisture treatment structure is usually: first in the basement wall outer surface wiping 20mm thick 1: 2 waterproof mortar, basement walls should be used cement mortar masonry, gray seam must be full; and in the basement floor and the first Floor floor is divided into two walls of the level of moisture-proof layer. The outer wall of the basement wall should be tampered with the soil with poor permeability.
Q: Can the floor tiles be removed from the cement mats on the prefabricated board floor?
You can dig, but be careful not to use a strong earthquake with the machinery to remove, otherwise it will damage the original structure.
Q: Cushion, waterproof layer construction to do what information
2, bedding (bed course) refers to the structure below the grass-roots level. Its main role is to water, drainage, antifreeze to improve the grass-roots and soil-based working conditions, the water stability requirements are better. The cushion layer is a structural layer between the base layer and the soil base. When the soil quality is poor, it is used to improve the water stability of the soil base, improve the water stability and frost resistance of the pavement structure and disperse Load to reduce soil deformation.
Q: What is the relationship between the cushion and the ring beam?
Ring beam is reinforced concrete. Is to increase the overall wall and overall stiffness, improve the side resistance performance, according to the earthquake or masonry specifications set. There may be in the ground wall, there may be in the underground wall.
Q: Is foam concrete suitable for use as a cushion?
The foamed concrete is a foaming system through a foaming machine that allows the foaming agent to be fully mechanically foamed and the foam is mixed evenly with the slurry.
Q: How to build a fine stone concrete cushion?
The cushion is primarily responsible for the load coming from the surface and passes the load evenly to the structural or base.
Q: Basement floor mattress dry to what degree can do coil waterproof?
First, the basement moisture treatment structure is usually: first in the basement wall outer surface wiping 20mm thick 1: 2 waterproof mortar, basement walls should be used cement mortar masonry, gray seam must be full; and in the basement floor and the first Floor floor is divided into two walls of the level of moisture-proof layer. The outer wall of the basement wall should be tampered with the soil with poor permeability.
Q: Maintenance time of the cushion on the roof of the building
According to the "concrete structure construction quality acceptance criteria" provides: Concrete should be poured within 12h after the completion of the concrete to be covered, and moisturizing conservation;