PVC Frontlit Flex Banner
- Loading Port:
- Wuhan
- Payment Terms:
- TT or LC
- Min Order Qty:
- 5000 Meter m²
- Supply Capability:
- 20 Container Per Month m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
PVC frontlit flex banner, widely used in advertisement field, is the ideal strong printing material.
Specification of PVC flex banner:
Ordinary Flex banners |
| |||
Model |
Weight/gsm |
Base Fabic |
Available Width(m) |
Use |
JLP-550-440 |
440 |
500D*500D/18*12 |
1.0~3.2 |
Advertising material |
JLP-520-400 |
400 |
500D*200D/18*12 |
1.0~3.2 |
Advertising material |
JLP-520-380 |
380 |
500D*200D/18*12 |
1.0~3.2 |
Advertising material |
JLP-520-340 |
340 |
500D*200D/18*12 |
1.0~3.2 |
Advertising material |
JLP-520-320 |
320 |
500D*200D/18*12 |
1.0~3.2 |
Advertising material |
JLP-320-300 |
300 |
300D*200D/18*12 |
1.0~3.2 |
Advertising material |
JLP-320-280 |
280 |
300D*200D/18*12 |
1.0~3.2 |
Advertising material |
JLP-320-240 |
240 |
300D*200D/18*12 |
1.0~3.2 |
Advertising material |
JLP-320-200 |
200 |
300D*200D/18*12 |
1.0~3.2 |
Advertising material |
JLP-320-180 |
180 |
300D*200D/18*12 |
1.0~3.2 |
Advertising material |
PVC Tarpaulin and High-end Flex banners |
| |||
Model |
Weight/gsm |
Base Fabic |
Available Width(m) |
Use |
JLG--750 |
750 |
1000D*1000D 20*20 |
1.0~3.5 |
Airtight material |
JLG--650 |
650 |
1000D*1000D 20*20 |
1.0~3.5 |
Cover material |
JLG--610 |
610 |
1000D*1000D 20*20 |
1.0~3.5 |
Tent material |
JLG--610 |
610 |
1000D*1000D 20*20 |
1.0~3.5 |
Wai oil material |
JLG--610 |
610 |
300D*200D/18*12 |
1.0~3.2 |
Advertising material |
JLG--510 |
510 |
1000D*1000D 18*18 |
1.0~3.2 |
Advertising material |
JLG--500 |
500 |
1000D*1000D 20*20 |
1.0~3.5 |
Cover material |
JLG--450 |
450 |
300D*200D/18*12 |
1.0~3.2 |
Advertising material |
JLG--440 |
440 |
1000D*1000D 28*28 |
1.0~3.2 |
Advertising material |
JLG--400 |
400 |
1000D*1000D 20*20 |
1.0~3.5 |
Cover material |
JLG--400 |
400 |
300D*200D/18*12 |
1.0~3.2 |
Advertising material |
Characteristics of PVC Frontlit Flex Banner
1) White substrate for wide format digital printing
2) Weather resistant (UV, rain and frost)
3) Colors: customized
- Q: Can the cushion on the prefabricated board floor be dug?
- Prefabricated board floor layer of cement layer is not called the cushion, should be called leveling layer, this layer can be removed, but be careful not to damage the prefabricated plate.
- Q: The cushion is usually in the housing which parts
- First of all, the foundation refers to the basis of the ground below, the cushion is generally below the base, the base should be there, if the sewage treatment station, then you look at the sewage pool, the bottom of the pool should also have it
- Q: Roof waterproof mattress should play the number of centimeters appropriate
- Roof leaking of the construction program: ? 1. Need to remove the previous waterproof, such as paint, coil, etc., if it is to do the mortar waterproof can not be eradicated.
- Q: Do you need a cushion for roof waterproofing?
- Roofing layer of leveling layer is usually used 20mm thick 1: 2.5 cement mortar. The leveling layer may be made directly on the structural concrete surface, or it may be made on the insulation layer and is provided for the construction of the waterproof material.
- Q: The top floor made waterproof playing cushion layer of how to do
- 2. repair the cracks well. After the cracks to be repaired are dry, start waterproofing.
- Q: Is the raft cushion waterproofing full of the cushion?
- Base cushion waterproofing is not contact with the soil (Ying water) to prevent water into the cushion, but in the cushion and the base of the bottom of the contact, in fact, is the basis of the bottom of the waterproof. The general basis of the foundation, the bar base is not necessary to do, like a raft in the basement, it is necessary to prevent the water from dipping into the basement (so the basement design may have to do anti-floating calculations).
- Q: Can the floor tiles be removed from the cement mats on the prefabricated board floor?
- Cement cushion as a leveling layer on the floor, not designed to the structure of the load-bearing, the general can be dug, the cushion is generally 3 to 5 cm, chisel in addition to unloading the floor of the heavy objects, chisel in addition to the use of strong vibration Machine or penetrating machine is too large, with a small hammer small chisel, along the horizontal plane horizontal chisel, stripping cement cushion.
- Q: Large area ground concrete cushion seam Why is the separation of joints generally concrete
- Large area of ??concrete after concrete construction, the concrete volume will be slightly inflated, the ground for a long time deposition, will be sinking, all large area of ??concrete construction, the general set of separation joints.
- Q: What is the waterproof layer and the waterproof cushion in the tile roof?
- In the tile roof, to wait for the waterproof layer after the dry layer, or prone to the phenomenon of wall off. Waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5-8 Hour) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
- Q: Basement floor mattress dry to what degree can do coil waterproof?
- Pull a square coil, tiled on the floor above, in the case of the sun, the sun shines on half an hour, in turn, look at the coil, if no water to prove that the water content is not large, that can be construction.
Send your message to us
PVC Frontlit Flex Banner
- Loading Port:
- Wuhan
- Payment Terms:
- TT or LC
- Min Order Qty:
- 5000 Meter m²
- Supply Capability:
- 20 Container Per Month m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords