• HDPE Geomembrane with Textured Surface System 1
  • HDPE Geomembrane with Textured Surface System 2
  • HDPE Geomembrane with Textured Surface System 3
HDPE Geomembrane with Textured Surface

HDPE Geomembrane with Textured Surface

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

HDPE Geomembrane is a kind of waterproof material with basic raw material of high molecular polymer.

 Geomembrane is a kind of waterproof material with basic raw material of high molecular polymer. It is mainly divided into LD PE geomembrane, , HDPE geomembrane, EVA geomembrance and all kinds of composite geomembrane.
  1. Complete variety of specifications of width and thickness. Thickness: 0.08-2mm/Width: 2-16m .

  2. Excellent environmental stress resistant cracking performance.

  3. Excellent performance of chemical erosion resistance.

  4. Big scope of application temperature and long service life .

  5. Applied in landfill waste site, sewage and filth treatment site, tailings depot and underground construction project


Items

Index

LDPE

HDPE -1

HDPE -2

Tensile strength MPa

≥14

≥17

≥25

Elongation at break%

≥400

≥450

≥550

Right angle tearing strengthN/mm

≥50

≥80

≥110

Carbon soot quantity

≥2

Environmental stress resistant cracking performance



≥1500

Oxidation induction time at 200min



≥20

Permeability coefficient of vapor(g·cm/cm2·s·pa)

≤1.0x

Impact degradation performance at -70

Pass

dimension stability%

±3


Q: Can the cushion on the prefabricated board floor be dug?
Prefabricated board floor layer of cement layer is not called the cushion, should be called leveling layer, this layer can be removed, but be careful not to damage the prefabricated plate.
Q: Foam concrete for the roof cushion generally do much bulk ah
Foam concrete density grade is generally 300-1800kg / m3, commonly used foam concrete density grade 300-1200 kg / m3,
Q: The roof cushion is waterproof on the slope roof
Most of the slope roof itself is not waterproof. The role of the slope roof is used for drainage,
Q: Is the raft cushion waterproofing full of the cushion?
Assuming (just suppose) the raft can easily turn over, then we do waterproof (like roof) directly on it, not waterproof on the cushion.
Q: Basement cushion waterproof
Third, the membrane waterproof in the construction should first do the basement floor of the waterproof, and then the membrane along the basement floor continuous paste to the outer surface of the wall. Basement floor waterproofing first in the foundation pouring C10 concrete cushion, the thickness of about 100mm. And then paste the membrane, and then in the coil to wear 20 thick 1: 3 cement mortar, and finally pouring reinforced concrete floor. The outer surface of the wall first wip 20mm thick 1: 3 cement mortar, cold base oil, and then paste the membrane, the membrane should be stitched paste, adjacent coil lap width of not less than 100mm. The top of the coil should be higher than the maximum water level of about 500mm, the outer side of the brick wall.
Q: Large area ground concrete cushion seam Why is the separation of joints generally concrete
Large area of ??concrete after concrete construction, the concrete volume will be slightly inflated, the ground for a long time deposition, will be sinking, all large area of ??concrete construction, the general set of separation joints.
Q: What is the waterproof layer and the waterproof cushion in the tile roof?
In the tile roof, to wait for the waterproof layer after the dry layer, or prone to the phenomenon of wall off. Waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5-8 Hour) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
Q: How to build a fine stone concrete cushion?
The main role of the cushion is to meet the requirements of the design elevation. In addition, the cushion to meet the sound insulation, insulation, insulation, slope and buried pipeline and other functional requirements and set a variety of levels.
Q: Why calculate the amount of time to count a lot of cushion ah
In the building construction refers to the base is located below the cushion sometimes also served as grassroots. With the cushion, in the above work is convenient, clean, especially the mold, bar reinforced, pouring concrete and other processes, will not be affected by the basic earth pollution. Set the place where the cushion is generally based, floor, roof (slope) and so on.
Q: Maintenance time of the cushion on the roof of the building
According to the "concrete structure construction quality acceptance criteria" provides: Concrete should be poured within 12h after the completion of the concrete to be covered, and moisturizing conservation;

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords