• Inflatable Tarpaulin System 1
  • Inflatable Tarpaulin System 2
  • Inflatable Tarpaulin System 3
Inflatable Tarpaulin

Inflatable Tarpaulin

Ref Price:
get latest price
Loading Port:
Wuhan
Payment Terms:
TT or LC
Min Order Qty:
5000 Meter m²
Supply Capability:
20 Container Per Month m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

PVC inflatable tarpaulin, as raw material for inflatable airtight pool for games& swimming in differeent size and style, for inflatable tent for tempeory shelter etc, is characterized by high tensile strength, waterproof, anti-UV treatment, flame ristance etc. It's very strong material which could work several years.

 

Specifications of PVC  inflatable tarpaulin:

 Inflatable Tarpaulin


Package of PVC inflatable Tarpaulin: Each roll of  PVC inflatable tarpaulin is wrapped with kraft paper or packed in paper tube.

 

Workshop of PVC inflatable tarpaulin:
 Inflatable Tarpaulin

Q: Do you need a cushion on the ground floor?
In addition to wood also buy wooden side, used as the main beam, beam and pillars. The ground is also recommended to raise, raise the place also to beam and pillars The number of boards to be based on your design to determine the ground practice, roof practices will affect the number of wood
Q: Can the cushion on the prefabricated board floor be dug?
1, can not be dug, the prefabricated board seam is too big. 2, in addition, now rarely used prefabricated panels, the earthquake effect is not good; especially after the Wenchuan earthquake. If it is cast-in-place floor, you can dig out.
Q: Foam concrete for the roof cushion generally do much bulk ah
First help you correct it, foam concrete used in the roof should be the role of thermal insulation, not as a cushion.
Q: Do you need a cushion for roof waterproofing?
If the base layer of the waterproof layer is flat or in line with the requirements of the waterproof material process, you can not do leveling layer. For example, in the cast-in-place concrete roof with the pound with wiping light, may serve as the waterproof layer of the grassroots.
Q: When the cushion is used, the thickness of the protective layer is not less than ()
Basement roof: non-load protection layer generally use C20 fine stone concrete or reinforced concrete, the thickness of 50 ~ 80mm. The road, driving the protective layer is determined by design.
Q: Can the floor tiles be removed from the cement mats on the prefabricated board floor?
You can dig, but be careful not to use a strong earthquake with the machinery to remove, otherwise it will damage the original structure.
Q: Large area ground concrete cushion seam Why is the separation of joints generally concrete
hird, the relevant parts Different types of rigid waterproof layer separation spacing in addition to meet the calculation needs, but also in the following parts set sub-grid joints. 1. The deformation of the roof structure sensitive parts; 2. Roof and roof drainage direction changes; 3. The junction of the waterproofing layer and the protruding roof structure; 4. Under normal circumstances, each bay load-bearing walls should be set sub-grid seam. 5. Between the waterproof layer and the load-bearing or non-load-bearing parapet or gable should be set sub-grid joints, and in the node structure for proper treatment.
Q: How to build a fine stone concrete cushion?
Reduce ground cracking, plus steel mesh. Reinforced mesh, should be placed in the middle of the concrete, because the protective layer of concrete thick Fang generally only 5CM thickness, so the middle is the best.
Q: Basement floor mattress dry to what degree can do coil waterproof?
First, the basement moisture treatment structure is usually: first in the basement wall outer surface wiping 20mm thick 1: 2 waterproof mortar, basement walls should be used cement mortar masonry, gray seam must be full; and in the basement floor and the first Floor floor is divided into two walls of the level of moisture-proof layer. The outer wall of the basement wall should be tampered with the soil with poor permeability.
Q: Why calculate the amount of time to count a lot of cushion ah
It can be seen, in the preparation of the project budget, the cushion is also a very important sub-head, the amount of its calculation is often measured by m3, the current commonly used materials are concrete, gravel, stone, Stone slag), slag, slag concrete, lime and so on.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords