• Kwistage  Scaffolding System with Painting System 1
  • Kwistage  Scaffolding System with Painting System 2
  • Kwistage  Scaffolding System with Painting System 3
Kwistage  Scaffolding System with Painting

Kwistage Scaffolding System with Painting

Ref Price:
$13.00 / kg get latest price
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 1. Structure of Kwistage Scaffolding Description:

Introduced from Australia scaffolding systems, scaffolding main components of the kwikstage, Vertical and Horizontal bar , 50CM every interval set off a row of libraries, library sales made from high mild steel stamping , through a dedicated fixture welded steel pipe , weld lengths up , with high stability , bar ends , respectively, with corresponding library with pin fastening and with inserts plug, plug and pole steel bar range contact , with two-way locking function , each pin library node can simultaneously install four rail connector. Kwikstage are widely used in housing construction scaffolding, bridges, overpasses, tunnels, culverts, chimneys, towers, dams and other Cuplock caffolding.

 

2. Kwistage Scaffolding advantages:

1) The multi-function,according to the specific construction requirements can form a variety of sizes and loads to eat a single row, double scaffolding, cage, and material support columns and other features of the lift frame construction equipment

2) Strong bearing capacity, stamping pin library has a reliable axial shear force, bar and pole contact surface , the overall stability of the intensity ratio of scaffold increased by about 20%

3) Safe and reliable: using an independent self-locking latch structure interspersed

4) Installation is simple, just install Kwikstage plugs bar alignment pins library location, and then hand off to cry into the library, and then hand hammer percussion bolt at the top . So closely integrated crossbar pole plug

5) Comprehensive benefits, component series standardized, easy to transport and management, there is no easily lost artifacts scattered, low loss, late into the small.

 

3. Kwistage Scaffolding Products pictures:

Kwistage  Scaffolding System with Painting

4. Kwistage Scaffolding Specification:

Kwistage  Scaffolding System with Painting

 5.FAQ

 We have organized several common questions for our clients,may help you sincerely:

1)How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding(C-Lock Scaffolding)

- Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2)How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Q:I really want a scaffold piercing and I can pay for it, I get good grades, I do all the chores I have to do, I spoke to them calmly and everything. Yet they still won't let me. My dad said that I will be grounded forever and everything but last time I got grounded, I went to a party the next day so what should I do?
im talking from experience-scaffold piercings are VERY painful, and take a long time to heal. so there wouldnt be any way you could take it out to hide it for a good few months! it really isnt a great piercing to get unless you can openly look after it properly. anyway you shouldnt disregard what your parents say...i know thats what you want to do!lol really though, its very painfull!
Q:Find the demolishing scheme of scaffold
Removal of scaffolding shall comply with the following requirements:11.2.1 removal operations must be carried out from top to bottom, prohibited from top to bottom operation at the same time;11.2.2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the dismantling of scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the 2 step, should be added to strengthen the wall;
Q:Calculation method of complete scaffold
No matter where we are, we all have time to go with us. It's an eternal departure
Q:How to calculate the double wall scaffolding
Calculation of bearing capacity of foundation:The average pressure of the bottom of the vertical rod foundation should meet the requirements of the formulaP = FGDesign value of foundation bearing capacity:FG = fgk x Kc = 200 kN/m2;
Q:Exterior wall scaffold construction plan?
Foundation treatment:Pit backfill every 30cm thick layer by ramming into vibration compaction, compaction by cutting ring sampling test, the bearing capacity of Rammed Soil reached 60270KN/m2. And then in the compacted soil C15 cast in situ concrete hardening, thickness 100mm. The foundation of all scaffolds must be smooth. On the basis of the base plate, the thickness of not less than 50mm, the layout must be smooth, shall not be suspended; and in the periphery of the scaffolding outside the vertical rod 50cm set up a shallow ditch drainage.
Q:If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
Q:The bottom of the cantilever scaffold must be provided with the sweeping rod
Steel pipe: (1) steel pipe with 48mm outside diameter, wall thickness of 3.5mm steel welded pipe No. 3
Q:Fastener type steel pipe scaffold composed of which components?
Reference to "construction safety of steel tubular scaffolding safety technical specifications" JGJ 130 - 2011, 8, page parts3.1 steel pipe3.1.1 scaffolding steel pipe should be used in the current national standard "straight welded steel pipe" GB/T13793 or "low pressure flowQ235 steel pipe for the welded steel pipe used for conveying body; the steel quality of the steel pipe shall be GB/T3091In accordance with the existing national standard "carbon structural steel" GB/T700 Q235 steel provisions.3.1.2 scaffolding steel pipe should be used 48.3 * 3.6. The maximum quality of each steel pipe shall not be greater than25.8kg.
Q:how did they turn the cells into a polymer for the heart scaffold ?
May have misunderstood. The heart is gently stripped of cells by using a detergent - this leaves the extracelllular matrix - a polymer of collagen - inert and insoluble. New cells (stem cells) will then be added to the structure to repopulate it with living heart muscle which gain coordination and structure from the matrix.
Q:Which kind of scaffolding is the most convenient and time-saving?
The advantages of the new scaffold (compared with the bowl button) are as follows:1, with sufficient mechanical strength, stiffness and stability, safe and reliable work.2, the node connection without frame degree, has the ability to self lock, installation and disassembly flexible and quick, easy to grasp, support, removal efficiency than the bowl buckle type multifunctional scaffolding about three times, can save labor, labor, save time. In the process of construction, opening and closing channels at any time.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords