Jack Hammer Chisels for Demoliation Manufacturer
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 200 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Jack Hammer Chisels for Demoliation Manufacturer
Both for marble and granite quarry work, chemical powder. Quarry Soundless Cracking Agent and static expansive mortar are developed and produced on the base of Italy's best technology, combined with China's Building Materials Academy standard JC506-92 for expansive cement. This new mortar is called HSCA for short.
Advantage:
Mainly for the quarry processing and mining working, also the construction work, widely used. Instead of the wire saw machine and the double blade cutting machine, it can be :
1,Safety and pro-environment
2,Easy control of the expansive effect
3,Easy operation
Description:
Hydraulic rock breaker is powered by an excavator or loader pump provides pressure oil, it can dig a fundamental role in building a more efficient clean up floating rock crevice in the rocks and soil. Optional hydraulic hammer excavator model is based on the principle of the operating environment to choose the most suitable hydraulic rock breaker
Hydraulic breaker has become an important tool for the job, it was installed in the hydraulic breaker backhoe loaders (also known as two busy) or wheel loader for crushing operations. Excavator Hydraulic Breaker, also known as hydraulic breaker or hydraulic rock breaker (Excavator Hydraulic Breaker).
Specification:
Exvacator breaker technical paramaters | ||||||||
TRB680 | TRB850 | TRB1000 | TRB1350 | TRB1400 | TRB1550 | TRB1650 | TRB1750 | |
Weight | 258 | 557 | 753 | 1653 | 1774 | 2569 | 2752 | 3912 |
Length | 1415 | 1735 | 1994 | 2367 | 2414 | 2760 | 2816 | 3176 |
Required oil Flow | 40~70 | 60~100 | 80~110 | 120~150 | 130~1800 | 180~240 | 200~260 | 210~290 |
Working pressure | 110~140 | 130~1640 | 150~170 | 160~180 | 160~180 | 160~180 | 160~180 | 160~180 |
impact rate | 500~900 | 400~800 | 350~700 | 400~800 | 350~500 | 300~450 | 250~400 | 200~350 |
Hose Diameter | 0.5 | 0.75 | 0.75 | 1 | 1 | 1 | 1.2 | 1.2 |
Chisel Diameter (mm) | 68 | 85 | 100 | 135 | 140 | 155 | 165 | 175 |
Chisel Length | 700 | 900 | 1000 | 1300 | 1300 | 1500 | 1600 | 1600 |
Applicate Exvacator | 4~7 | 7~14 | 10~15 | 18~26 | 18~26 | 28~35 | 30~45 | 40~55 |
Company profile:
(CNBM International) is the most important trading platform of CNBM Group Corporation, a state-owned company under the direct supervision of State-owned Assets Supervision and Administration Commission of the State Council.With the advantages in Cement, Composite Materials, New Building Materials and Engineering, We are enlarging sub-brand. Currently, we have wholly-owned overseas subsidiaries and branches in 5 countries with a view to realize localization. Meanwhile, we have established strategic partnerships with hundreds of domestic manufacturers and sound business relations with clients from over 120 countries. In line with the business, CNBM International launched E-business platform Okorder.com. It conformed the best resource and logistics to meet the customers’ request with 24 hours full-time service.
FAQ:
1.What color can you produce ?
Red or customized.
2.What’s the MOQ and payment terms ?
MOQ is 1 set.T/T, L/C, Escrow, west union is accepted. Other terms is also negotiable.
3.Are you a manufacturer?
Yes, we have our own workshop,and our company was established in 2009.
4.Can you do OEM production?
Sure,we are professional manufacturer,OEM is available.
5.Which country have you exported to? Canada, Australia, Peru, Egypt, Brazil, Mexico, Iran, South Africa,etc.
6.Are you sure that your product will fit my excavator?
Our breakers can be adapted to different excavators.
7.How about the delivery time ?
Within 7-10 working days after receiving the payment.
- Q: One flew over the cuckoos nest pg 41-77Characterize Pete Bancini with regards to the theme of Machinery. Please give examplesThanks!
- Bancini worked on the rail road for a long time he sees things in the world like a machine.
- Q: Engineering machinery as the main means of project construction industry in recent years (including construction machinery, road construction machinery) and demand has increased rapidly, which stimulates the use of the manufacturing, engineering machinery, maintenance industry often demand. At the same time, the high-tech construction machinery, maintenance equipment maintenance maintenance numerous, complex process, high technical requirements and related mechanical engineering research and development, manufacturing, sales, use, maintenance and other personnel, enterprises generally reflect the lack of.
- The profession is very good, employment is particularly easy, and if you do not hate physics, it is not so hard to learn. This year, the school is not circulated a piece of it, a large enterprise to recruit machinery students, the boss said: "you just do not have a diploma, as long as there are student cards, we want you.". It shows that employment is fairly good, but the fact that wages are not particularly high is a fact. For example, when you enter a bank, you can take 5K months, and the machines may look like 2K to 3K.
- Q: I really what to know difference between power tools and ordinary tools .Is it specially design to do some special kind of work or it is of full power as the word describes ??
- Power tools require electric power of some kind to run. A hand saw has no motor. They user runs the blade back and forth on the object to be cut. With a power saw, the machine does the work. Note, some skills are required to run most power tools. Not all people should use them.
- Q: Suppose that a piston is moving straight up and down and that its position at time t seconds iss = Acos(2πbt)with A and b positive. The value of A is the amplitude of the motion and b is the frequency(the number of times the piston moves up and down each second). What effect does doubling the frequency have on the piston's velocity and jerk?Follow up question, why does machinery break when you run it too fast?
- Q1 === If you double the frequency, this means that you are doubling the number of times that the cylinder goes up, hits it's highest point, turns around and comes back down again in a second. You must be doubling the distance the piston travels. The time is one second, so effectively you are doubling the speed. Q2 === Jerk in this sense is one of those wonderful descriptive words that works in the real world, but is hard to put into a formula. I wonder if you have to do that. Certainly the force increases because the turn around time is much smaller when the frequency is doubled. That means time in this formula F = m*(vf - vi)/t is much smaller and that makes the force larger. Q3 == So machinery must break down because the force on moving the piston up and down has become much larger.
- Q: A guy my husband works with has a fellow employee that operates a crane and him and his crane are the only cranes on the entire work site that a whole flock of bees in attracted to and he has gotten stung many times already and wants to know of anything natural or not that is cheap and easy that could repel the bees away. help plz...
- Try fabric softener sheets. thread them in your suspenders and on the back of your hat. Keep a can of Yard Guard handy. Wear a long sleeve shirt, dull colors, no red or orange.If necessary get a Beekeeper net or make one out of black Tulle cloth. Wear gloves.
- Q: Mechanical drawings, stiffeners, cutaway, right?
- On the vertical section of the stiffener, a section of the stiffener should be drawn and no cross section is required on the section parallel to the stiffener.
- Q: How would you survive if all the electricity and machinery in the world just stopped forever?
- I would have no choice but to go back to the way things were before we had electricity and machinery. I grew up in the country, and learned a few things from my Grandparents and also my Amish neighbors, so I know I could survive.
- Q: Labor costs, materials costs, machinery costs accounted for the total cost of the project
- General civil construction: labor costs 18-21%, material costs 50-55%, machinery costs 8-11%, the rest is safety, civilization, management fees, profits, fees, taxes
- Q: I am from Turkey and want to import textile machinery parts such as leather picker and wooden shuttle
- Mr. okorder /
- Q: Machines do not complain and ask for a pay raise,no vacations or healthcare
- That's like blaming cars for the demise of the buggy industry. Technology will invariably move forward. Workers need to recognize the handwriting on the wall and get educated in career fields and skills for the future... not sit around and complain because they have become an anachronism.
Send your message to us
Jack Hammer Chisels for Demoliation Manufacturer
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 200 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords