• Jack Hammer Chisels Hydraulic Breaker for Demoliation System 1
  • Jack Hammer Chisels Hydraulic Breaker for Demoliation System 2
Jack Hammer Chisels Hydraulic Breaker for Demoliation

Jack Hammer Chisels Hydraulic Breaker for Demoliation

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
200 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Jack Hammer Chisels Hydraulic Breaker for Demoliation

We are a manufacturer specialized in the hydraulic breaker with superior quality, We also supply other concerned hydraulic spare parts including main body assembly, the back head, cylinder assembly, front head, piston, reversing valve, oil seal retainer and etc. Our products can be used for Komatsu, Hitachi, Kobelco, Kato, Sumitomo, Hyundai, Volvo excavator, etc.

 

Advantage:

(1) Use the highest strength material to get better wearing resistance.

(2) Easy maintenance, prolonged life.

(3) We have accumulated sales of 20, 000 units, rich maintenance experience.

(4) The warranty period is 1 year.

 

Description:

Hydraulic rock breaker is powered by an excavator or loader pump provides pressure oil, it can dig a fundamental role in building a more efficient clean up floating rock crevice in the rocks and soil. Optional hydraulic hammer excavator model is based on the principle of the operating environment to choose the most suitable hydraulic rock breaker

Hydraulic breaker has become an important tool for the job, it was installed in the hydraulic breaker backhoe loaders (also known as two busy) or wheel loader for crushing operations. Excavator Hydraulic Breaker, also known as hydraulic breaker or hydraulic rock breaker (Excavator Hydraulic Breaker).

 

 Specification:

Exvacator breaker technical paramaters

TRB680

TRB850

TRB1000

TRB1350

TRB1400

TRB1550

TRB1650

TRB1750

Weight
(kg)

258

557

753

1653

1774

2569

2752

3912

Length
(mm)

1415

1735

1994

2367

2414

2760

2816

3176

Required oil Flow
(L/min)

40~70

60~100

80~110

120~150

130~1800

180~240

200~260

210~290

Working pressure
(kgf/cm2)

110~140

130~1640

150~170

160~180

160~180

160~180

160~180

160~180

impact rate

500~900

400~800

350~700

400~800

350~500

300~450

250~400

200~350

Hose Diameter
(In)

0.5

0.75

0.75

1

1

1

1.2

1.2

Chisel Diameter (mm)

68

85

100

135

140

155

165

175

Chisel Length
(mm)

700

900

1000

1300

1300

1500

1600

1600

Applicate Exvacator
(Ton)

4~7

7~14

10~15

18~26

18~26

28~35

30~45

40~55

 

Jack Hammer Chisels Hydraulic Breaker for Demoliation

 

Company profile:

(CNBM International) is the most important trading platform of CNBM Group Corporation, a state-owned company under the direct supervision of State-owned Assets Supervision and Administration Commission of the State Council.With the advantages in Cement, Composite Materials, New Building Materials and Engineering, We are enlarging sub-brand. Currently, we have wholly-owned overseas subsidiaries and branches in 5 countries with a view to realize localization. Meanwhile, we have established strategic partnerships with hundreds of domestic manufacturers and sound business relations with clients from over 120 countries. In line with the business, CNBM International launched E-business platform Okorder.com. It conformed the best resource and logistics to meet the customers’ request  with 24 hours full-time service.

 

FAQ:

1. Q: Can I get some professional suggestion?

A: Sure, we have professional engineer. Any question will be solved.

2. Q: Do you have the products in stock?

A : Yes , We have several models now could supply to you.

3. Q: What's the delivery time?

A: It usually takes about 25 days to produce an order. But the exact delivery time might be different for different orders or at different time.

4. Q: How does your factory do regarding quality control?

A: Quality is priority.  Workers always attach great importance to quality control from the every beginning to the end of the production. Every product will be fully assembled and carefully tested at important moment.

5. Q: Will you deliver the right goods as ordered? How can I trust you?

A: Yes, we will. Our company is world top 500, that is the biggest supplier and manufacture in China, having a good reputation around the world.


 

Q: This includes simple or complex mechanical components in plain view and hidden view as well as the input and output functions, IED class-intro engineering design
Make it simple to understand.... Each key is a press switch. Each key has its own tone generator. All those tone generators output are connect to an AF power amplifier.
Q: Requirements for construction engineering personnel
4., according to the construction needs and mechanical equipment, reasonable allocation of construction machinery, and constantly improve the utilization rate of construction machinery and construction machinery efficiency
Q: Friction generates and causes wear in machinery, yet friction is often needed.please explain?
friction, resistance offered to the movement of one body past another body with which it is in contact. In certain situations friction is desired. Without friction the wheels of a locomotive could not “grip” the rails nor could power be transmitted by belts. On the other hand, in the moving parts of machines a minimum of friction is desired; an excess of friction produces heat, which in turn causes expansion, the locking of the moving parts, and a consequent breakdown of the machinery. Lubrication is important in minimizing friction as are also such devices as ball and roller bearings.
Q: I live near a forestry reserve, some of the plantations are being harvested. In photography we have to make a photobook, mine is based on forestry machinery. I have photos already but these were only taken when the machinery are stationery and the workers have finished for the day. Any suggestions on how I could get a few good photos of these magnificent machines while they are in action? I live in the green triangle area, most of the plantations are managed by forestry SA, this is an Australian company, so if you are Canadian or come from another country with a lot of experience in the field of pine felling, your thoughts would be most appreciated!
Show up in the middle of the day, when they're still working. (Is this a trick question?)
Q: The project, however, will end after 5 years. If the equipment can be sold for $4.5 million at the completion of the project, and your firm's tax rate is 35 percent, what is the after-tax cash flow from the sale of the machinery?
What formulas have you tried? It appears as though you are just trying to get everyone on here solve the finance problems for you!
Q: What do you do during shore duty?Which one would you say has the best outlook for an 20+ year career?Are these the hardest working jobs on the boat?
I have served with each of these. Shore duty tends to be in factories alongside a pier. They are called: Intermediate Maintenance and Repair Facilities. Basically machine shops that rebuild valves. However I know one guy that was on a boat with me who got orders to NAS Fallon Nevada to be in charge of their go-cart course. They needed a EN to keep the go-carts running. The needs of the Navy change every month. To say which rate with advance the fastest is a guess. It changes all the time. If you stay out of trouble, you can serve for 20 years and get a pension. Anyone who guarantees you that by doing 'X' will make you a chief, is lying. They all work hard. And they are each highly valued jobs, with good job prospects when you get out. I would recommend that you consider subs too. The extra pay does not hurt.
Q: new developments in marine machinery?
This question is extremely open. There have been developments in marine machinery ever since the first man went away from shore on the trunk of a fallen tree. Please provide more information.
Q: It's subject is World World I and the Roaring 20's.
industrialization!!!a reaction however ineffectual to this would be luddite-ism!!this from riots of weavers in england who had been replaced by machinery and automatic looms to which they had violently reacted.smashing machinery and plant works!!
Q: Question about jounal entry Purchased a machinery I have to affect this entry on purchase a/c as well as fixed assets also I want to take tax set off, How can I ?suppose I pass purchase entryParty / Purchase Dr. (Creditor)To Machinery Net 4% cr.(Purchase)To Vat 4% cr.(Duties Taxes) Fixed asset machinery Machinery a/c dr. (fixed assets)To party/ or purchase or what ?
Well you are not very clear with your question , you need to be clear about what you are trying to do, Did you receive an invoice for the fixed asset or the payment has already been made ? answer would depend on the situation: Although i think the main entry you are after is DR Fixed assets ( machinery) DR VAT paid- (assuming ur subledger doesnt pick up any VAT) CR Trade creditors this would be the main journal, in between these journals you could have as many journals as you want in between. Hope this helped.
Q: Where can I buy heavy machinery like a really big excavator in Australia?
You okorder they have a fair range of excavators

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords