Mesh Tarpaulin

Hot Products

FAQ

Why calculate the amount of time to count a lot of cushion ah
It can be seen, in the preparation of the project budget, the cushion is also a very important sub-head, the amount of its calculation is often measured by m3, the current commonly used materials are concrete, gravel, stone, Stone slag), slag, slag concrete, lime and so on.
The cushion is usually in the housing which parts
First of all, the foundation refers to the basis of the ground below, the cushion is generally below the base, the base should be there, if the sewage treatment station, then you look at the sewage pool, the bottom of the pool should also have it
What is the relationship between the cushion and the ring beam?
Ring beam is reinforced concrete. Is to increase the overall wall and overall stiffness, improve the side resistance performance, according to the earthquake or masonry specifications set. There may be in the ground wall, there may be in the underground wall.
What is the difference between leveling and cushion?
Building floor cushion is the structure layer below the grass-roots level. Cushion as the name suggests is the structure of the liner layer, mainly plays the role of the back cover. Cushion should be noted with the basic distinction. It is easy to confuse the two engineering concepts.
Basement floor mattress dry to what degree can do coil waterproof?
Second, when the design of the highest groundwater level above the bottom of the basement floor, you must do waterproofing. As the waterproof waterproof effect is good, so the application of more. Internal waterproofing is generally used for repair works.
Is foam concrete suitable for use as a cushion?
Inappropriate. Bubble concrete is a new type of energy-saving and environmentally friendly building materials, which are widely used in wall materials, but there are still some defects, such as low strength, cracking, water absorption, as the cushion of its strength is not enough standard.
Can the cushion on the prefabricated board floor be dug?
Surface layer without steel, do not bear the load, you can dig out But sometimes the prefabricated floor above the surface layer with steel, to bear the load, this can not be removed! To know how thick the cushion, in the local dig about In general, to do leveling layer, can not be directly laid tiles
Cushion, waterproof layer construction to do what information
4, waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5 -8 hours) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.