HVAC Related Square air Vent Diffusers steel & aluminium
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 999999 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification of Air Diffuser
Supplying Air Diffusers
-Frame Thickness: 1.0mm /0.8mm
-Any Size be customed
-Powder Coated RAL 9010/9016
-1-4 curved blade air diffusers
Usage of Air Diffuser
The grille is suitable for ceilling sidewall, soffit or cill mounting and may be used for supply or extract applications.
Typical installations include offices, shops, hotels and most commercial or industrial buildings.
Available as standard in white polyester powder coat finish.
Other polyester powder coat finishes are also available as an option.
1 | Item | HVAC aluminum air conditioner grille |
2 | Materials | Extruded Aluminum alloy (6063-T5) |
3 | Blade | Blades in 45°from aluminum profile or as customer’s requirements |
4 | Bar spacing | 30mm as standard or as customer’s requirements |
5 | Materials | 0.8mm, 1.0mm, 1.2mm, 1.5mm or according to the customers’ |
6 | Surface Finish | Powder coated, Anodized , PVDF, Mill finish. |
7 | Size | Width x Height, any sizes available |
8 | Powder for Finish | Environmental protection and non-toxic, and Color to keep 5 -10 years. |
9 | Color | Refer to RAL colors swatch or customized colors available |
10 | Design | Drawings designed according to the customers’ requirements |
11 | Payment terms | T/T, L/C, PYAPAL, etc. |
12 | Delivery time | Usual 15-20 work days for a 40GP container |
13 | Package details | Bubble wrap + Cartons for FCL, Bubble wrap + Cartons + Wood-box for |
14 | Mesh | Stainless steel security mesh, Aluminum security mesh |
15 | Type | Fixing and adjustable installation |
Products show
Production line
FAQ of Air Diffuser:
1, What's size do u have for round type diffuser?
A: We have face size from 150mm to 550mm,neck size from 250mm to 400mm聽
2, Do u still have other types ?
A: Yes, we have round diffuser/ rectangle diffuser/ linear grilles/ baseboard diffusers,etc
3, What's the most early delivery time?
A: Within 25 days for each 40'fcl
- Q: 110 level two-story to warm the boiler heating and living hot water with much model
- 24KW boiler can be used for the whole family .....
- Q: What is the role of heating water tank?
- The role of heating water tank to provide living water, to provide life heating
- Q: Since the heating is good or good warm
- Or to warm good, do not take up space, no mess of the pipeline. Cooling area, long life If you are doing their own soil heating, or warm, since the heating is a natural cycle, hang warm in the installation of the time to get rid of waste burning mud palm Feng Shafei extreme slope, the water will be better circulation. To warm the words must be added to the circulating pump.
- Q: Rooftop electric film from the heating how?
- The heat is running up
- Q: What does the boiler pressure mean?
- In the wall of the boiler next to a valve with a screwdriver can open the knob to open it can be pressed to see the pressure gauge to 1.5 or so when the stop, you can
- Q: Which man knows the construction of temporary heating program, please tell me ah! Thank you!
- Try to avoid coal heating, you can use some safe electrical heating equipment, such as: air conditioning, silicon hot oil heater, electric heater, solar fan, etc.
- Q: On the bathroom water seepage problem, the water seepage parts of the wall, the bathroom inside the angle valve, the water into the sea Feng suppression of the economic power of the tibu ax hugs are not, in the end where the water, for explanation, is the following tiles below the reverse water? More
- Bathroom floor and wall skirt parts do not have a good dew point
- Q: My home is rural, in the floor before the ground should be the first shop or what to do to prepare? And what is its structure, how to coil (and the spacing of the tube), and how to warm into the water pipe and each room of the coil how to connect (not ask what to take together)? My house is a floor tile, would like to shop to warm and tiles do not want to dig out. So I would like to use the sand to do to fill the design and production of the floor, the second is to use the sand cost can be lower and the heat of the heat than the heat more heat
- To warm is actually a more complex system engineering, only concerned about the quality of the product is not enough. Do the floor insulation system should be laid before the construction of civil walls have been completed, and done the basic leveling, the venue no other types of construction in the construction. The temperature of the construction room should be in accordance with the required temperature of the pipe used, because the ambient temperature and the bending radius of the pipe are closely related. Cleaning the ground and the wall, the use of level ruler on the ground flatness, within 1 meter height difference is less than or equal to 5 mm. Wall or ground protruding part of the shovel with the shovel, filled with concrete pits on the ground. Bathroom and the bottom of the villa should do a good waterproof layer or laying moisture film.
- Q: What is the difference between the hydraulic module and the original hydraulic module? Please master as much as possible to say the details?
- Energy-saving air-conditioned room is in the original ordinary air-conditioning room structure, the traditional room of the pump, the valve group, filter decontamination equipment, energy-saving equipment, supporting parts and control systems of these components together. Used in warm air conditioning water system in the water medium power transmission and control and connect the host and the heat transfer end of the pipeline, in series to form a standardized equipment. Equipment through the professional staff according to the real shortage of speculation in the past, the need to match the various components to the most economical and energy-saving program customization
- Q: Solar water heater mixing valve pressure balance
- You can choose a thermostatic valve
Send your message to us
HVAC Related Square air Vent Diffusers steel & aluminium
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 999999 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords