3 way curved blade air diffusers ceiling use
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 999999 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification of Air Diffuser
Supplying Air Diffusers
-Frame Thickness: 1.0mm /0.8mm
-Any Size be customed
-Powder Coated RAL 9010/9016
Usage of Air Diffuser
The grille is suitable for ceilling sidewall, soffit or cill mounting and may be used for supply or extract applications.
Typical installations include offices, shops, hotels and most commercial or industrial buildings.
Available as standard in white polyester powder coat finish.
Other polyester powder coat finishes are also available as an option.
FAQ of Air Diffuser:
1, What's size do u have for round type diffuser?
A: We have face size from 150mm to 550mm,neck size from 250mm to 400mm聽
2, Do u still have other types ?
A: Yes, we have round diffuser/ rectangle diffuser/ linear grilles/ baseboard diffusers,etc
3, What's the most early delivery time?
A: Within 25 days for each 40'fcl
- Q:What kind of heater? Home electric heater how to choose
- Home heating or the use of electric heating is good, like a small sun to the fast, but no heat.
- Q:Heating equipment have what kind of
- Air conditioning, to warm, electric heater, fireplace, warm handbag is also considered it
- Q:Carbon crystal heating plate how much electricity
- *** carbon crystal hot plate [Wally carbon crystal] relative to the heating cable, electric film, point fiber, and so several kinds of electrical heating to ridicule cans to drink Intuit considered Gui Taiwan well or more power, each carbon crystal to warm Power in the 130W 24 hours a day open, less than once a day electricity consumption, construction area of 100 flat house, the use of pottery carbon crystal to warm the monthly electricity tariff is 900 dollars, the wall temperature according to power, room temperature To reach more than 18 electricity is probably the case, the wall warm to save some, because the immediate use.
- Q:The pressure to look at the floating spring faint tempered tents touching up in the 1.5 or so, after the opening of the heat will be similar to the heat will see the temperature will rise but it is not put out hot water, and the ground is not hot feeling. But also to open what valve? What is the black valve below the machine? More
- Any boiler before starting the machine to pay the water to see if the water pressure gauge pointer is between 1 - 1.5bar. If the water pressure in the above range, open the gas pipe valve, power on, set the machine in the winter position, set the heating temperature, usually the upper limit of the floor heating temperature can be set to 55- -60 degrees Celsius, radiator heating up to 75-85 degrees Celsius (if the radiator is not anti-hot protection, it is best to set the temperature a little lower). After normal ignition do not have to ignore it. Bath: see the water pressure gauge pressure is normal, open the gas valve, power on, set the machine in the summer position (if it is winter, that is set in the winter position), the hot water temperature is set at 42-45 degrees Celsius Between, open the hot water head, until the water temperature is appropriate and stable after you can start bathing. Antifreeze: water pressure gauge pressure is normal, the machine power plug (do not boot), the gas path open (must ensure that the gas source) can be. The above operation applies to Faroe, Haas, Ariston, Bosch, Squirrel, Beretta and other brands of boiler
- Q:Do you want to turn off the water return switch when the geothermal pipe is exhausted?
- Geothermal (floor warm) water separator: We are exposed to the only equipment, but also we need to operate the exhaust equipment. Divided into the supply (into) water pipes and back (out) water pipes, in general, the top of the water supply pipe, the bottom is the return pipe, each have a valve, the ball valve: the horizontal direction is open, vertical helium float Feng Tong Feng is off. Gate valve: screw clockwise screw is off, counterclockwise twist is open. Another tool: a soft leather tube, the size and exhaust valve port similar to the elastic, can be tight in the exhaust valve port, to prevent the discharge when the pop, affecting health. A basin. 1. It is best to determine the exhaust in the normal heating 2. The best one by one system exhaust, in the geothermal first run process, because the pipeline pressure and water resistance is easy to produce air plug, resulting in water supply is not recycled, the temperature is not equal , Should be carried out by road exhaust. The method is: turn off the heating of the total return valve and the loop control valve, (the total return valve in front of the water separator, the pipe below the tube, the low temperature of the pipe is the return pipe.) First open the water separator A control valve, and then open the drain on the drain valve on the exhaust valve exhaust, drain the air and then close the valve, while opening the next valve. And so on, each way the air is drained and then all the valves open, the system is running. 3. The number of exhaust and heating are directly related to the length of time, such as running water and heating time, just started heating and fast heating because of heating time is short, circulating pump and heat transfer station also has time to stop, easily lead to gas block, so everyone Should be more exhaust, generally completely after a gas can be. In the later exhaust do not have to close the valve, you can directly discharge a small amount of air
- Q:What is the geothermal decoration process?
- General geothermal installation of the construction steps: the first step to heat the first pavement to clean up the ground, pay attention to the corner clean up, to ensure that enough to allow enough expansion joints. The second step in the ground layer of plastic sheeting to isolate the moisture, let the plastic cloth in the four corners were higher than the ground 10cm. The third step to lay the mats. Note that to leave the expansion joints, the interface at least overlap 5cm, and must be sealed with a good tape. Use skirting boards that are thicker than ordinary floors and need to be built independently. After 24 hours of installation, the floor can be heated. In order to facilitate the heat, the cushion material should not be too thick. Common sense: to use geothermal floor special glue; can not shop pads; can not play keel, because this gap will leave the air, air thermal conductivity is low, is not conducive to heat transfer. Floor and floor between the mat can not use ordinary foam mats, be sure to use geothermal paper mats, because this mat heat conduction, no deformation. Ordinary foam mat heat slowly, long-term high temperature conditions, easy to produce harmful gases, endangering the health of users. Whether it is water heat radiation heating or cable heating heating system touch usurped Du Gu Sen Sen single system, do not live in the field on the ground furnace, electric furnace, etc., because the surface temperature is too high, then the ground under the aluminum-plastic composite pipe May melt. Geothermal flooring Due to the specificity of its function and the complexity of geothermal system, compared with ordinary flooring, geothermal floor maintenance and maintenance has its own unique, in the heating and moisturizing to pay special attention.
- Q:How to choose the wall heater
- There is no difference between the use of the boiler and the radiator. Mainly to choose the brand, good reputation of the dealer, and experienced installation staff.
- Q:My home is rural, in the floor before the ground should be the first shop or what to do to prepare? And what is its structure, how to coil (and the spacing of the tube), and how to warm into the water pipe and each room of the coil how to connect (not ask what to take together)? My house is a floor tile, would like to shop to warm and tiles do not want to dig out. So I would like to use the sand to do to fill the design and production of the floor, the second is to use the sand cost can be lower and the heat of the heat than the heat more heat
- To warm is actually a more complex system engineering, only concerned about the quality of the product is not enough. Do the floor insulation system should be laid before the construction of civil walls have been completed, and done the basic leveling, the venue no other types of construction in the construction. The temperature of the construction room should be in accordance with the required temperature of the pipe used, because the ambient temperature and the bending radius of the pipe are closely related. Cleaning the ground and the wall, the use of level ruler on the ground flatness, within 1 meter height difference is less than or equal to 5 mm. Wall or ground protruding part of the shovel with the shovel, filled with concrete pits on the ground. Bathroom and the bottom of the villa should do a good waterproof layer or laying moisture film.
- Q:Hello, may I ask Daikin LMX + EEHS = Multi-function VRV? Which configuration is better! Home just can use LMXS41U machine! Thank you.
- Can not be equal, multi-function VRV or EEHS to the warm area of 110 or so is the highest cost-effective, if you want to separate I recommend to warm the other brands, or else is more versatile, after all, summer is equivalent to heat recovery, hot water Basic free use, the price is basically the same, it is estimated that the multi-functional will be slightly cheaper, more EEHS also need to host, but the price is slightly cheaper than the multi-functional but other prices are the same
- Q:Who used a small squirrel boiler. That model is easy to use? Can you talk about its practicality!
- Ha ha obviously sell the boiler most people know so clearly?
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
3 way curved blade air diffusers ceiling use
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 999999 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords