• High Quality Tower Cranes for sale in Dubai for Construction Use System 1
  • High Quality Tower Cranes for sale in Dubai for Construction Use System 2
  • High Quality Tower Cranes for sale in Dubai for Construction Use System 3
  • High Quality Tower Cranes for sale in Dubai for Construction Use System 4
  • High Quality Tower Cranes for sale in Dubai for Construction Use System 5
  • High Quality Tower Cranes for sale in Dubai for Construction Use System 6
High Quality Tower Cranes for sale in Dubai for Construction Use

High Quality Tower Cranes for sale in Dubai for Construction Use

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our tower crane:

1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our tower crane:


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2,It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Features of our tower crane:


Independent height (m)

40

Max height with attachment (m)

121

Working range can be adjusted(m) 

40/50

Min working range(m) 

2.5

Max lifting capacity(t)

6

Tip load @ 48m(t)

1.3

Hoist mechanism

Falls

2

4

Lifting capacity(t)

1.3

-

3

3

-

6

Speed(m/min)

9

38

80

4.5

19

38

Motor

YZTD225L2-4/8 /32-24/24/5.4KW     

Trolleying mechanism

Speed(m/min)

20/40

Motor

YZTDE132S-4 /8-3.3/2.2KW  

Slewing mechanism

Speed(r/min)

0.6

Motor

YZR132M2-6-3.7KW

Climbing speed(m/min)

0.5

Counterweight(t)

11

Mast section size(L×W×H)m

1.6×1.6×2.5m

Working temperature

-40-+60°C

Total power (KW)

34

Power supply requirement (KVA)

180KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

50mm2(3+2, 5 cores)

Startup voltage & current

380V×95%=361V       285A

Rated working voltage & current

380V                   65A

 


High Quality Tower Cranes for sale in Dubai for Construction Use

High Quality Tower Cranes for sale in Dubai for Construction Use

High Quality Tower Cranes for sale in Dubai for Construction Use

High Quality Tower Cranes for sale in Dubai for Construction Use

High Quality Tower Cranes for sale in Dubai for Construction Use


High Quality Tower Cranes for sale in Dubai for Construction Use

FAQ;

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q: Jon and Paul are folding origami cranes. If Paul works alone he can fold 100 cranes in 5hours. together they can do the same job in 3 hours. how much time would it take for Jon to fold 100 cranes alone? Please show your work. :)
Paul does 100 cranes in 5 hours So in 1 hour he does 20 cranes In 3 hours he does 60 cranes and balance 40 cranes Jon does Jon = 40 cranes in 3 hours So 100 cranes = 100/40 X 3= 7.5 hours ANSWER
Q: crane:300t lift 100t pad sizes:4.5x2 mtrs.ground bearing capacity required?
This depends on the angle of the lift and the distance away from centre of the crane. With the lift at tipping range all 400t will be distributed along the outer half of the pad or on the extreme legs. Rule of thumb is all the load is placed under the one pad. so one pad is 9 sq metres and the load is 400 tonnes so the bearing capacity must exceeds 400/9 tonnes per square metre. 44.44444t/m^2
Q: what is the function of load indicator on a crane?
it indicates the load being placed on the crane so the operator can keep the load within limits.
Q: The judge that sentenced people Death or Exile looked alot like Dr. Crane in the 1995 Batman film, which is why I ask.
Yes Gordon even calls him crane i remember
Q: What is the difference between a tower crane QTZ31.5 and a QTZ40?
Lifting moment, arm length, elevation is not the same ah! Specifically, the maximum lifting weight of QTZ315 is 3 tons, the length of the arm is from 38-42 meters, the elevation is 27-28 meters; the maximum QTZ40 is 4 tons;
Q: My science teacher wants to know why cranes make work easier rather than just lifting an object yourself. She refers to the formula of force x distance. So i have to compare (in a way) the work of a human lifting an object and a crane lifting an object. Grrrr.... I hate this project!
The type of crane she is referring to ia a simple pole with a fulcrum placed between the person operating the crane, and the mass to be lifted. Imagine a weightless pole with a rope tied to one end attached to a mass of weight 224 lbs The pole is 9 feet long Let's say the human weighs 112 lbs, or half of what is to be lifted. Without a crane, it will be difficult to lift that much and swing it around. With the crane, though, let's look at the advantage when a fulcrum is placed under the pole and the person pushes down on the pole to lift the weight. First, note that gravity is in favor of the person to use their weight on the pole. Using physics, with the fulcrum place at x from the mass to be lifted, the downward force of the person is F*(9-x)=224*x or F=224*x/(9-x) now plug in some values for x and compute the force: x F 4.5 224 3.5 143 2.5 86 1.5 45 0.5 13 I started by placing the fulcrum exactly in the middle and then moving the fulcrum in increments of 1 foot closer to the weight to be lifted Notice that the more pole towards the person pressing down, the less force the person has to apply to lift the weight. Also, note that when the fulcrum is in the middle, the person must apply a downward force equal to the weight - which willl be difficult foir a person that weighs 112lbs. However, once the fulcrum is placed 2.5 ft from the weight, the person only need apply 86 lbs of downward pressure. Leverage. j
Q: my father has his forklift and crane license. he needs to know how long they're vaild for
should be good ror 3 years from the date he got it i just got mine new one last month for a sit down fork lift and crane/ trolly and its good till march 2010
Q: In order to ensure the stability of tower cranes, generally along the height of the tower and building a number of meters attached
Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.
Q: I'm trying to workout the best height of a truss for a ship-to-shore container crane project. The crane will have a 65m outreach, 18m center section and 15m backreach. I was thinking in the region of 2m-3m truss height.Any input would be great.Thanks
Jimmy: The American Society of Mechanical Engineers (ASME) produces design standards for many types of cranes: see the link below. Many crane owners, licensing and governmental authorities having jurisdiction over cranes require design, fabrication and testing to ASME standards.
Q: What are the safety devices in a tower crane?
Answer: 1: height limit2: lifting weight limiter3: torque limiter4: travel limiter5: speed (maximum speed of force must be more than 40m/min)6: put a device (jib tower crane to move) must have7: the rotary limiter (no collector on the revolving part) must have8: car broken rope protection9: anemometer (boom root hinge point height is greater than 50m should be set)10: windproof device (rail type)11: buffer and end stop12: Rail sweeping plate (rail)13: protective cover14: derailment device15: emergency power off switch (red mushroom head)

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords