• Fixed Types of QTZ160 Used Self Erecting Tower Crane for Sale in Dubai System 1
  • Fixed Types of QTZ160 Used Self Erecting Tower Crane for Sale in Dubai System 2
  • Fixed Types of QTZ160 Used Self Erecting Tower Crane for Sale in Dubai System 3
  • Fixed Types of QTZ160 Used Self Erecting Tower Crane for Sale in Dubai System 4
  • Fixed Types of QTZ160 Used Self Erecting Tower Crane for Sale in Dubai System 5
  • Fixed Types of QTZ160 Used Self Erecting Tower Crane for Sale in Dubai System 6
Fixed Types of QTZ160 Used Self Erecting Tower Crane for Sale in Dubai

Fixed Types of QTZ160 Used Self Erecting Tower Crane for Sale in Dubai

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Tower Crane

1) TC5013A tower crane is one of the key product of cnbm company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 140m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

  

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.


Main Features of Tower Crane

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

Fixed Types of QTZ160 Used Self Erecting Tower Crane for Sale in Dubai

Fixed Types of QTZ160 Used Self Erecting Tower Crane for Sale in Dubai

Fixed Types of QTZ160 Used Self Erecting Tower Crane for Sale in Dubai

Fixed Types of QTZ160 Used Self Erecting Tower Crane for Sale in Dubai

Fixed Types of QTZ160 Used Self Erecting Tower Crane for Sale in Dubai

Fixed Types of QTZ160 Used Self Erecting Tower Crane for Sale in Dubai

Fixed Types of QTZ160 Used Self Erecting Tower Crane for Sale in Dubai

Fixed Types of QTZ160 Used Self Erecting Tower Crane for Sale in Dubai



Tower crane Specifiction

Fixed Types of QTZ160 Used Self Erecting Tower Crane for Sale in Dubai

FAQ of Tower Crane

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  


About CNBM


CNBM is the largest state owned company under central government of China that deals with building materials and construction and industrial equipment.
We are among Fortune Global 500 and No.1 in China building materials industry. We have our own factory, logistics system, e-business platform, and oversea warehouse. Our products meet international quality standard.
For more information about us you can go to our official website icnbm dot com and okorder dot com.

Q:I'm a bit confused as to what happened to him. I guess I skimed a bit at a certain important part of the book. When Seneca Crane's name was written on the dummy during training, why did the people gasp at the name written in berry juice? What happened to him? PS. I am at the begining of Mockingjay. So no spoilers please. (:
This Site Might Help You. RE: What happened to Seneca Crane in the Hunger Games? I'm a bit confused as to what happened to him. I guess I skimed a bit at a certain important part of the book. When Seneca Crane's name was written on the dummy during training, why did the people gasp at the name written in berry juice? What happened to him? PS. I am at the begining of...
Q:I've always wondered, how do they lift cranes? Bigger cranes? What do you think/know?
they build it peice by peice.
Q:I'm trying to workout the best height of a truss for a ship-to-shore container crane project. The crane will have a 65m outreach, 18m center section and 15m backreach. I was thinking in the region of 2m-3m truss height.Any input would be great.Thanks
Jimmy: The American Society of Mechanical Engineers (ASME) produces design standards for many types of cranes: see the link below. Many crane owners, licensing and governmental authorities having jurisdiction over cranes require design, fabrication and testing to ASME standards.
Q:Is the working load of a crane the maximum weight it is able to lift?
yes it is , because when we Design a part usually we will ad safty factor 1.5 or more from the maximum weght is able.
Q:my friend is in the hospital with really bad burns
Vince M is right; My class decided to make 1,000 paper cranes. We are punching holes in the middles of the cranes and stringing them on yarn. Perhaps u should do that and give the seperate ones to the hospital. Sugest that they hang them from the ceiling......?
Q:please help i need it for a project
In the story no years are given, and in fact the end is left open ended. It seems to say that Ichabod Crane was still alive at the end: humiliated he had slipped out of town in the night. Though it does say the townsfolk spread rumors and stories told that he was carried off by the headless horseman. The fictional character of Ichabod Crane was based on the personality of a real person, Jesse Merwin, who died in 1852. (though thirty-two years after the story was published and not in any spooky way) The name, Ichabod Crane, also came from a real person, Colonel Ichabod Crane, who fought in the War of 1812 and died in 1857.
Q:Calculate the work the crane performs.
Crane work = weight to be lifted x 6.95 m Weight to be lifted = 2.75x10^3 N + 1.20 m^3 (2.00 x 10^3 kg/m^3) (9.8) = 2750 + 23520 = 26270 Therefore, Crane work = 26270 x 6.95 = 182576.5 J
Q:Tower crane attached concrete pump can be? Are there any state regulations?
The state expressly states that it is not possible to have serious safety incidents in Hunan and Zhuzhou before
Q:Method for operating tower crane
In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
Q:I alsways see projects where there are these massive cranes sitting on top of huge buildings...how they hell do they get them up there?
The big tower cranes you see on high rise structures actually....lift themselves. Their bases sit inside square lattice support structures and can climb them. When they get to the top of the structure they raise two more half squares that are bolted together around the base of the crane and the crane can then climb into the higher structure. The process is repeated until they get to the height limit of the crane. It's pretty amazing. Sometimes the crane base remains at the bottom, but sometimes, they close the floor below and remove the base that is no longer used, and just march the whole crane up the floors. Smaller cranes can be lifted by mobile cranes that go elsewhere, but the big ones use the method above.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords