HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--016
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 500000 m³/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q: What is the real estate industry?
- the real estate regulation and management, that is, the establishment of real estate capital market, technology market, labor market
- Q: What is the real estate level market secondary market three market
- that is, the state through its designated government departments will be urban state-owned land or rural collective land requisition for state-owned land to sell to the user's market
- Q: What is the meaning of the term in the real estate?
- Washing dishes generally refers to the 2 hand room. A district in a break time will have owners to take their own house out to sell
- Q: What are the specific real estate stocks
- There are many real estate stocks, real estate four leading is the move, security, million, gold (investment real estate, Vanke, Poly Real Estate, Golden Group) China's largest real estate stocks has been Vanke.
- Q: How is China's housing market trend ?
- grow and mature, their behavior will be standardized; related system construction will gradually be improved.
- Q: When China introduct the real estate?
- mainly in China's southern, Hainan, Shenzhen, Zhuhai, Huizhou, Beihai city appeared in the real estate market overheating problem
- Q: What is the difference between land valuation and real estate valuation?
- taking full account of socio-economic development, land use, land expected benefits and land use policies and other factors on the impact of land revenue
- Q: Kentucky is selling real estate how to understand?
- KFC has always attached great importance to the geographical location of each branch
- Q: What is the relationship between interest rates and the real estate market?
- the level of interest rates directly affect the cost of real estate development and profits
- Q: What is the trend of real estate now?
- Since 2000, China's real estate investment has been accounted for more than 5% of GDP share, 2006, 2007 is more than 10% for two consecutive years, is the fact that the pillar industry
Send your message to us
HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--016
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 500000 m³/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches