• HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--003 System 1
  • HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--003 System 2
  • HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--003 System 3
  • HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--003 System 4
HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--003

HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--003

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
500000 m³/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1.     Project Information, usage, construction area, height, how many storeys

2.      Weather report and geological for the location district

3.     Production process:

1.     Confirm design plan.

2.      Building the mould to confirm the design is correct.

3.     Mass production, packing and transportation.

4.     Installation

5.      After sale service.

 

4. Packing choice:

 

1. We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 2.Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

1.     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

2. Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 1.     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

2.     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

Q:What is the characteristics of real estate prices
According to "China real estate valuation industry development prospects and investment strategy planning analysis report" statistical analysis
Q:What is the status quo of China's real estate market?
At present, China's real estate industry by the economic environment, political law, social and cultural and technological environment and other aspects of the tremendous changes
Q:What is the characteristics of real estate?
(D) investment in a large number of sex.
Q:What is the land deed tax rate for real estate?
donation and exchange, housing sale, house donation and house exchange need to pay deed tax; In the current, real estate enterprises to pay land tax is 3%.
Q:According to the use of housing classification?
1, residential 2, industrial plants and warehouses 3, shopping malls and shops 4, office buildings
Q:Kentucky is selling real estate how to understand?
because he knows the property and location will be the success of each branch of the most important Factor
Q:What kind of factors in our housing market?
they will release a huge purchasing power and demand, thereby stimulating the development of China's real estate
Q:What is the real estate industry?
information market, to develop a reasonable real estate prices, the establishment and improvement of real estate regulations to achieve the country 's macro - control of the real estate market
Q:What is the red line in the real estate project?
Red line from the planning department with a red pencil on the topographic map to draw the land boundary of the land
Q:What is the real estate development prospects now?
so that supply is greater than demand, but in the medium and long term, the supply is still tight.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches