HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--002
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 500000 m³/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q: What is the characteristics of real estate?
- (A) the location of the fixed and immutable.(B) the use of long-term.
- Q: What are the aspects of the risk of real estate investment and development?
- long construction period, the impact of factors such as diversity, making real estate development and investment activities are facing many risks
- Q: What is the impact of the economic environment on real estate?
- From the demand and transactions, it is expected that some of the second-tier cities in 2010 is expected to rise in house prices and the impact of insufficient supply will decline
- Q: How is China's housing market in other aspects ?
- the degree of supply and demand matching will be improved.the market order will gradually improve.
- Q: What are the specific real estate stocks
- Real estate stocks have been one of the hottest groups in China's stock market. As early as 1990-1994
- Q: What is the difference between land valuation and real estate valuation?
- taking full account of socio-economic development, land use, land expected benefits and land use policies and other factors on the impact of land revenue
- Q: Kentucky is selling real estate how to understand?
- because he knows the property and location will be the success of each branch of the most important Factor
- Q: How is the real estate sales invoice open?
- the first payment, the mortgage to open the invoice, pay the time to open the invoice
- Q: How to classify real estate?
- Residential real estate market can be further divided into ordinary residential market, high - end apartment market, villa market
- Q: What is the trend of real estate now?
- Since 2000, China's real estate investment has been accounted for more than 5% of GDP share, 2006, 2007 is more than 10% for two consecutive years, is the fact that the pillar industry
Send your message to us
HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--002
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 500000 m³/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches