• Heavy Equipment TC6014(QTZ100) Hydraulic Tower Crane System 1
  • Heavy Equipment TC6014(QTZ100) Hydraulic Tower Crane System 2
  • Heavy Equipment TC6014(QTZ100) Hydraulic Tower Crane System 3
  • Heavy Equipment TC6014(QTZ100) Hydraulic Tower Crane System 4
  • Heavy Equipment TC6014(QTZ100) Hydraulic Tower Crane System 5
  • Heavy Equipment TC6014(QTZ100) Hydraulic Tower Crane System 6
Heavy Equipment TC6014(QTZ100) Hydraulic Tower Crane

Heavy Equipment TC6014(QTZ100) Hydraulic Tower Crane

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our Heavy Equipment TC6014(QTZ100) Hydraulic Tower Crane:

1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our Heavy Equipment TC6014(QTZ100) Hydraulic Tower Crane


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.


Features of our Heavy Equipment TC6014(QTZ100) Hydraulic Tower Crane


ItemParameter
Independent height (m)46
Max height with attachment (m)138(200)
Working range can be adjusted(m) 48/54/60
Min working range(m) 2.5
Max lifting capacity(t)8
Tip load @ 60m(t)1.4
Hoist mechanismFalls24
Lifting capacity(t)0-20-40-40-8
Speed(m/min)0-800-400-400-20
MotorYZRWFC250M-4/8 30/30KW
Trolleying mechanismSpeed(m/min)53/27/12
MotorYZTDE132L-4/8/16 3.3/2.2/1.1KW
Slewing mechanismSpeed(r/min)0-0.6
MotorYZR132M2-6-3.7KW×2
Climbing speed(m/min)0.5
Counterweight(t)17.0
Mast section size(L×W×H)mm1600×1600×3000
Working temperature-40-+60°C
Total power(KW)42
Power supply requirement(KVA)190KVA for generator
Cable type ( within 35 meters from site power source to lower electric box of tower crane )50mm2(3+2, 5 cores)
Startup voltage & current380V×95%=361V       179A
Rated working voltage & current380V     128A

Heavy Equipment TC6014(QTZ100) Hydraulic Tower CraneHeavy Equipment TC6014(QTZ100) Hydraulic Tower CraneHeavy Equipment TC6014(QTZ100) Hydraulic Tower Crane

Heavy Equipment TC6014(QTZ100) Hydraulic Tower Crane

Heavy Equipment TC6014(QTZ100) Hydraulic Tower Crane


Heavy Equipment TC6014(QTZ100) Hydraulic Tower Crane

FAQ Heavy Equipment TC6014(QTZ100) Hydraulic Tower Crane

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q: what do sand-hill cranes eat-as far as planting a food source for them?
Cranes eat fish so unless you know of a fish plant, I would put in a large pond with fish.
Q: Denny Crane (played by William Shattner), and Alan Shore (played by James Spader) are partners in a Boston law firm. I would like to know if those those two are father and son in the series,
SPOILER ALERT So far we have seen Donny Crane in Season 1's in Catch and Release we found that he isnt his son and than again in Season 1's Tourted Souls and Season 2's Squid Pro Quo
Q: How much do you know about construction cranes??
that depends, what do u need to know
Q: open boat by stephen crane
The Open Boat is a true story - Crane was sent to Cuba as a war correspondent in 1897, and he boarded a vessel named the Commodore. The vessel sank off New Smyrna Beach, Florida in heavy weather, and the survivors made their way to shore in the open boat described. The wreck of the Commodore is in 90 feet of water, fourteen miles out and is currently under an Admiralty salvage claim.
Q: We would like some ideas from folks who have the cranes coming to their bird feeders. What foods are they attracted to?
I give them black sunflower oil seeds along with chicken seed as we have chickens and ducks, They have just started to come and I am thrilled as I watched them do their jumping, dance,and expanding their wings Just beautiful. I also gave them bread crumbs which they devoured!!
Q: does anyone have a good slogan for the whooping crane?
**** the whooping crane
Q: I'm folding 1000 origami cranes for my upcoming wedding. It's a tradition. I'm trying to find a website that can show me how to make the cranes into a large picture or an idea for a mobile. I found some sites that show pictures of each, but nothing with a how to on it.
from most of the pictures i saw, it seems pretty simple to figure out thinking of it logically. Origami cranes, string, wood sticks, Love and care. And with a bit of your own creativity and whatever supplies you can gather I think you will do a great thing. (making a paper crane now :)
Q: Where are cranes mostly found in the world?
Most cranes for building are in China I have seen Sandhill Cranes (birds) by the thousand flying north in South Dakota.
Q: What is the safe distance of a tower crane to the surrounding buildings?
The latest specification is that the tower crane is 4M from the proposed building.According to the safety regulations of tower craneRegulation 10.3: the tower crane tail and the surrounding building and its surrounding construction facilities between not less than 0.6m.Article 10.5 stipulates: between the two tower cranes of minimum distance should be erected to ensure that at least 2m in the distance between the tower crane boom end and another tower crane tower; the most part of the high tower crane (hook up to the highest or lowest part of the balance weight) should not be confused with the vertical distance of tower crane at in between the highest position of the components is less than 2m.The latest specification is that the tower crane is 4M from the proposed building.The distance from the tower to the building shall be considered:1, the slewing radius of the tower itself.2. The distance between the double shelf of building and tower crane.3, double shelf and tower crane safe distance.4, according to the specific type of tower crane to determine the specific.
Q: Are there any standard requirements? If so, please show me some reference materials. Thank you, 20It's urgent, online, etc.. Thank youWould you please not write down the specifications? The specific methods of operation, with what materials are written on, thank you, good, you can add points
The main purpose is to prevent the main cable fixed tower crane tower crane cable weight lead cable pulled bad (insulation damage, core pulling) etc.,

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords