• HDG Construction Scaffolding Cuplock System CNBM System 1
  • HDG Construction Scaffolding Cuplock System CNBM System 2
  • HDG Construction Scaffolding Cuplock System CNBM System 3
HDG Construction Scaffolding Cuplock System CNBM

HDG Construction Scaffolding Cuplock System CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of HDG Construction Scaffolding Cuplock System

  • NameCuplock Scaffold System
    SizeMany sizes or as your request
    Main MaterialQ235/345 Steel
    Surface TreatmentHigh Protected Painted, Powder Coating, Electric Gavenized, Hot Dip Gavenized.
    ColorSilver, Orange, Red
    CertificateSGS, EN12810.
    ServiceOEM Service available
    MOQ50T
    PaymentT/T, Western Union
    Delivery Time15-25  days  after  deposite
    Packingin bulk or steel pallet or as your request
    production capability50 tons per day
    Main  MarketAfrica, South America, the Middle East and Asia

    HDG Construction Scaffolding Cuplock System CNBM

  • HDG Construction Scaffolding Cuplock System CNBM

  • HDG Construction Scaffolding Cuplock System CNBM


Descriptions of  HDG Construction Scaffolding Cuplock System

Cuplock is a kind of multi-purpose and versatile modular system scaffolding, suitable for access and formwork support in all types of construction of building & civil engineering projects, offshore projects, etc. This complete galvanized Cuplock system is probably the fastest and most widely preferred scaffolding system. It has flexible erection as straight, curved or circular configuration for both access and support purposes.


Futures of HDG Construction Scaffolding Cuplock System

1.Cuplock scaffold system is simple in structure,including top cup,bottom cup and ledger blade.

  

2.Quick installation of horizontals and verticals,you can easily fit the ledger blade into the cups with a hammer.

 

3.Cuplock scaffold system standards are made from higher quality steel tube which allow more than 58KN load per leg.

 

4.Cuplock scaffold system is a multi-functional scaffolding system which is suitable for all forms of access and support structures,especially used in bridege building.

 

5.People can fasten joint of ledgers by putting two extra ledger blades in the cups.

6.This cuplock scaffold system are interlocked by cups and ledgers which is very safe and stable steel scaffolding system.

7.This is a heavy duty scaffold system which can load about 16tons for each cuplock scaffolding system.

8.Cuplock scaffold system can be used both interior or outerior high-rise building construction project, expecially for arc shape building such as bridge, tunnel, subway, or gym building. it's multifunctional.

9.This is a galvanized cuplock scaffold system which surface is hot dip galvanized, it can keep a longer working life.

10.Gavanized cuplock scaffold system is water-proof scaffold sysem which can prevent the air and water to damage the cups and ledgers very effectively.

11.Cuplock scaffold system can be quick to errect by interting  the cuplock blade into bottom cup, then swivel the top cup to fixed it.

12.Suitable for transportation and storage: Single cuplock scaffold system standard and ledger occupy less space. Wiht no extra parts.


  • The Measures of HDG Construction Scaffolding Cuplock System

  • Standard: 3000mm, 2500mm, 2000mm, 1500mm, 1000mm, 500mm. 
    Ledger: 3000mm, 2000mm, 1780mm, 1500mm, 1000mm, 500mm. 
    Diagonal brace: 3000X2000mm, 1780X2000mm, 1000X1500mm, 1000X2000mm, 1500X2000mm, 
    Tube specification: Φ 48.3X4.0mm, φ 48.0 X3.25mm, φ 48.0 X3.0mm 

  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q: I would like a scaffold piercing, but my parents aren't going to let me have two cartilage piercings at once. So, can they be done separately, as in weeks apart?
Technically yes but it is better to have them done at the same time so the holes are aligned properly. It is better to get them done at the same time, as the second piercing will be less painful because you are all adrenalin-ed up! Probably cheaper too.
Q: I've had my scaffolding piercing for about a week now and when cleaning i've just dabbed the hydrogen peroxide and salt water around my ear. However i read that i should be rotating it when cleaning it. Should i rotate it after only a week?
don't rotate it and stop using hydrogen peroxide only use warm water mixed with sea salt or anti-bacterial soap(dial),saline solution(contact cleaner),h20ocean piercing spray found at hottopic. you can turn the bar to clean it to get the other side clean but never rotate it. it'll make the piercing healing process alot slower and it can cause problems.
Q: If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
Q: Where to use scaffolding in construction
Construction height of 2m above to use scaffolding. Most of the site is the exterior, internal walls and paint.Scaffolding (scaffold) refers to the construction site for the workers to operate and solve the vertical and horizontal transport and erection of various stents. The general term of the construction industry, refers to the construction site used in the external walls, interior decoration or high level can not be directly construction. Mainly in order to work on or off the construction of the external security network and the installation of high altitude and other components, it is put on the shelf, scaffolding materials are usually made of bamboo, wood, steel or synthetic materials, etc.. Some projects also use scaffolding as a template, in addition to advertising, municipal, transportation, Luqiao, mining and other sectors are widely used.
Q: What is the bowl buckle scaffolding, bowl buckle scaffold what are the characteristics
(c) the cross bar is made of welded joints of 48 mm x 3.5mm steel pipe with a certain length. Horizontal connecting rod for vertical rod, or horizontal bearing rod of frame;
Q: I'm reading the novel by nathaniel hawthorne. There seems to be a lot going on in the scaffold scenes that i kind of not understand. Can someone explain the significance of these scenes? I am not a fan of cliffnotes or sparknotes because i actually READ the books. please someone who has read it tell me, i appreciate it.
No. Santa doesn't like this movie.
Q: why scaffold need for inspected within the preceding 7 days and after adverse weather condition?
It is a work safety issue. Past experience has shown that scaffolding sometimes gets modified by unqualified people (or weather) resulting in injury or death.
Q: Latch type disc scaffolding accessories is a national patent product
Disk lock scaffolding called socket type Pankou scaffold.
Q: Cantilever scaffold technical disclosure Find satisfaction free speed!!!
Fastener:(1) new fasteners shall have production licenses, product quality certificates and inspection reports. Old fasteners should be used before the quality inspection, there are cracks, deformation is strictly prohibited, the use of bolts must be replaced sliding silk. New and old fasteners should be anti rust treatment. Corrosion of fasteners and damaged fasteners timely repair replacement bolts. Bolt oil support easy to use.(2) the fastener and the joint surface of the steel pipe should be in good contact with the steel pipe, and the minimum distance of the opening should be less than 5mm. The fastener in the bolt was 65N.m, shall not be damaged.
Q: Which accessories are included in a movable scaffold
Chinese now used in the steel pipe scaffold material made of steel tubular scaffolding, bowl button steel scaffolding, buckle disc scaffolding, socket type steel pipe scaffolding, scaffolding, ladder scaffolding, and every kind of the scaffolding, hanging scaffold and the scaffold steel pipe materials.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords