Good Quality Needle-punched PET/PP Nonwoven Geotextile
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1*20FCL m.t.
- Supply Capability:
- 100 Million M2 Per Year m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Technical specification of short fiber needle punched nonwoven geotextile:
Density |
Thickness | Breaking Strength | Elongation of Fracture | Tearing Strength | CBR Bursting Strength | Vertical Penetration Parameter | Equivalent Aperture |
g/m2 | mm | KN/m | % | KN | KN | cm/s | O95mm |
100 | 0.9 | 2.5 |
25 ~ 100 | 0.08 | 0.3 |
K x (10-1 ~ 10-3) (K = 1.0 ~ 9.9) |
0.07 ~ 0.2 |
150 | 1.3 | 4.5 | 0.12 | 0.6 | |||
200 | 1.7 | 6.5 | 0.16 | 0.9 | |||
250 | 2.1 | 8.0 | 0.20 | 1.2 | |||
300 | 2.4 | 9.5 | 0.24 | 1.5 | |||
350 | 2.7 | 11.0 | 0.28 | 1.8 | |||
400 | 3.0 | 12.5 | 0.33 | 2.1 | |||
450 | 3.3 | 14.0 | 0.38 | 2.4 | |||
500 | 3.6 | 16.0 | 0.42 | 2.7 | |||
600 | 4.1 | 19.0 | 0.46 | 3.2 | |||
800 | 5.0 | 25.0 | 0.60 | 4.0 |
|
Nonwoven Geotextile Applications:
1) Filtration :
The filtration layer of the dykes, river canal, seacoast, concrete slope, retaining walls. At the same time of preventing the clay granule from passing, it allows the water and the gas pass through freely.
2) Separation :
The isolation of the railway dregs and the roadbed, roadbed and the soft base, surface of the airdrome and parking lot and the groundsill, different dam materials. It isolates the soil and the gravel of two kinds different granule pathway from the groundsill or other buildings.
3) Adding muscle :
The highway, railway, soil-stone dam, breakwater, airport, backfill soil of retaining wall, slope protection, etc in which distributes the earth stress, prevents the side-displacement of the earth body and improves the earth body stability.
4) Protection :
It prevents the bank from being washed out, protects the bank and the bottom, prevents the water and soil from being washed away.
- Q: Do you need a cushion on the ground floor?
- As well as the time to build a wooden building with concrete pier, from the ground or contact the ground to do a good job preserving.
- Q: Can the cushion on the prefabricated board floor be dug?
- 1, can not be dug, the prefabricated board seam is too big. 2, in addition, now rarely used prefabricated panels, the earthquake effect is not good; especially after the Wenchuan earthquake. If it is cast-in-place floor, you can dig out.
- Q: The cushion is usually in the housing which parts
- First of all, the foundation refers to the basis of the ground below, the cushion is generally below the base, the base should be there, if the sewage treatment station, then you look at the sewage pool, the bottom of the pool should also have it
- Q: Foam concrete for the roof cushion generally do much bulk ah
- in recent years, the density of 160kg / m3 ultra-light foam concrete is also used in construction projects.
- Q: When the cushion is used, the thickness of the protective layer is not less than ()
- Master roof: the general use of 40 thick C20 reinforced fine stone concrete protection.
- Q: Why do the basics of the cushion waterproofing
- Base cushion waterproofing is not contact with the soil (Ying water) to prevent water into the cushion, but in the cushion and the base of the bottom of the contact, in fact, is the basis of the bottom of the waterproof.
- Q: Is it possible to make a waterproof layer
- 2, waterproof layer: In order to prevent the rain into the roof, groundwater into the wall, basement and underground structures, indoor water into the floor and walls and other materials layer.
- Q: Cushion, waterproof layer construction to do what information
- 4, waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5 -8 hours) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
- Q: Is foam concrete suitable for use as a cushion?
- The foamed concrete is a foaming system through a foaming machine that allows the foaming agent to be fully mechanically foamed and the foam is mixed evenly with the slurry.
- Q: Maintenance time of the cushion on the roof of the building
- According to the "concrete structure construction quality acceptance criteria" provides: Concrete should be poured within 12h after the completion of the concrete to be covered, and moisturizing conservation;
1. Manufacturer Overview
Location | Shangdong, China |
Year Established | 2010 |
Annual Output Value | Above US$ 50 Million |
Main Markets | America; Europe; Asia |
Company Certifications | ISO 9001; ISO 14001 |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Qindao; Yantai |
Export Percentage | 50% - 100% |
No.of Employees in Trade Department | 6-10 People |
Language Spoken: | English; Chinese |
b) Factory Information | |
Factory Size: | 40000square meters |
No. of Production Lines | Above 5 |
Contract Manufacturing | OEM Service Offered; Design Service Offered |
Product Price Range |
Send your message to us
Good Quality Needle-punched PET/PP Nonwoven Geotextile
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1*20FCL m.t.
- Supply Capability:
- 100 Million M2 Per Year m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches