• PVC Blacklit Flex Banner System 1
  • PVC Blacklit Flex Banner System 2
  • PVC Blacklit Flex Banner System 3
PVC Blacklit Flex Banner

PVC Blacklit Flex Banner

Ref Price:
get latest price
Loading Port:
Wuhan
Payment Terms:
TT or LC
Min Order Qty:
5000 Meter m²
Supply Capability:
20 Container Per Month m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

PVC Blacklit Flex Banner, is ideal advertisment material, with characteristics of 

1. High strength               
2. Weather resistant            
3. Waterproof              
4. Self-cleaning             
5. Good smoothness
6. Perfect printing ability
7. Best color fastness
8. Gloss or Matt available
9. Customer's requirement available
10. Anti flame is available


Typical specifications of  PVC blacklit flex banner


 PVC Blacklit Flex Banner

 

Package: Each roll of PVC flex banner is wrapped with kraft paper or paper tube.


 PVC Blacklit Flex Banner  PVC Blacklit Flex Banner

Q: Can the cushion on the prefabricated board floor be dug?
Prefabricated board floor layer of cement layer is not called the cushion, should be called leveling layer, this layer can be removed, but be careful not to damage the prefabricated plate.
Q: Why do the basics of the cushion waterproofing
Raft foundation do not do waterproof mainly depends on the design of the groundwater level considerations, calculated if the floor itself to meet the requirements, you can not do, and not rigid to do
Q: The roof cushion is waterproof on the slope roof
and the formation of the ice dam will lead to roof water, water will find the path into the house.
Q: Is it possible to make a waterproof layer
3, waterproof layer set and standard construction methods: to be painted 2 to 3 times, or should be added fiberglass cloth, and each brushing the thickness of the cured material shall not be less than 1 mm, and should be completely dry (about 5 -8 hours) and then the next construction. After brushing, but also in the paint waterproof layer to do a mortar protective layer, and finally paste the tile.
Q: Is the raft cushion waterproofing full of the cushion?
Base cushion waterproofing is not contact with the soil (Ying water) to prevent water into the cushion, but in the cushion and the base of the bottom of the contact, in fact, is the basis of the bottom of the waterproof. The general basis of the foundation, the bar base is not necessary to do, like a raft in the basement, it is necessary to prevent the water from dipping into the basement (so the basement design may have to do anti-floating calculations).
Q: Can the floor tiles be removed from the cement mats on the prefabricated board floor?
Cushion generally no steel mesh, even if there can be removed, it is used to inhibit the cushion cement mortar layer cracking.
Q: What is the relationship between the cushion and the ring beam?
Ring beam is reinforced concrete. Is to increase the overall wall and overall stiffness, improve the side resistance performance, according to the earthquake or masonry specifications set. There may be in the ground wall, there may be in the underground wall.
Q: How to build a fine stone concrete cushion?
The main role of the cushion is to meet the requirements of the design elevation. In addition, the cushion to meet the sound insulation, insulation, insulation, slope and buried pipeline and other functional requirements and set a variety of levels.
Q: Basement floor mattress dry to what degree can do coil waterproof?
First, the basement moisture treatment structure is usually: first in the basement wall outer surface wiping 20mm thick 1: 2 waterproof mortar, basement walls should be used cement mortar masonry, gray seam must be full; and in the basement floor and the first Floor floor is divided into two walls of the level of moisture-proof layer. The outer wall of the basement wall should be tampered with the soil with poor permeability.
Q: Maintenance time of the cushion on the roof of the building
According to the "concrete structure construction quality acceptance criteria" provides: Concrete should be poured within 12h after the completion of the concrete to be covered, and moisturizing conservation;

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords