• Gel System Inverter Sealed Lead Acid Agm 12V 24ah Battery System 1
  • Gel System Inverter Sealed Lead Acid Agm 12V 24ah Battery System 2
  • Gel System Inverter Sealed Lead Acid Agm 12V 24ah Battery System 3
  • Gel System Inverter Sealed Lead Acid Agm 12V 24ah Battery System 4
Gel System Inverter Sealed Lead Acid Agm 12V 24ah Battery

Gel System Inverter Sealed Lead Acid Agm 12V 24ah Battery

Ref Price:
get latest price
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
100 carton
Supply Capability:
50000 carton/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Features :
1. Maintenance-Free Operation 
Absorbent Glass Mat (AGM) technology ensures efficient gas recombination up to 99% and freedom from electrolyte maintenance. During the expected float service life of batteries, no need to check the specific gravity of the electrolyte or add water.
2. Good Discharging Ability
Tight assembly technology ensures an excellent high-rate discharge performance.
3. Long Service Life
A unique corrosion-resistant grid alloy ensures batteries have long service life.
4. Low Self Discharge
Using high purity raw materials ensures batteries have less self-discharge.
5. Environmental & Non-polluting
Gas Recombination technology ensures the battery high seal reacting rate, which can prevent the acid fog from separating out.
6. Safe & Reliable
Efficient venting system automatically release excess gas when the pressure rises above the normal level & reseals the valves when it returns to the normal rate, which can protect the battery from bursting.

Applied Scope :
1. Communication Systems: Switch, Microwave Stations, Mobile Base Stations, Data Centers, Radio and Broadcasting Stations
2. Motivity Field: Robots, Electric Toys, Electric Tools & Portable Vacuum Cleaners
3. Solar & Wind Power Generation Systems
4. Signal System & Emergency Lighting Systems
5. EPS & UPS Systems

 

ModelSEL 100-12
Voltage12V
Capacity100AH  (C20)
97AH    (C10)
90AH    (C5)
79AH    (C1)
Dimension (mm)lenth: 407
width: 172
height: 214
total height: 238
Weight29KG
Maintenancefree(valve regular)
Working terperature-40°C~60°C
Floating life5 years
Design life5 years
Warranty2 years
Discharge details
DoD data  3000-3500 (25%)
600-800(75%)
200-300(100%)
Self discharge (25°C)91%(3 month)
82%(6 month)
64%(12 month)
Internal Resistance4.9 Ω (Fully charged battery at 25°C)
Material 
Grid Plate CaPb alloy, PbSn alloy, PbSb alloy
Diachylon 1# ceruse(99.99%)
Liquid Dilute sulfuric acid
Terminal Lead, Zinc, Copper
Shell PC\ABS
OriginalChina

 

Anatomy                                                                      

 

FAQ

1.   How do I decide which system is right for me ?

For protection from long outages, include a generator or solar panels in your Must solar system. Shorter outages can be handled by a battery-only system.

2.    Where my system will be installed ?

Must solar systems are usually wall-mounted near a home's main electrical (circuit breaker) panel.

3. How do I install my system ?

A solar backup inverter is connected to a home electric system , we will supply detailed installation manual and videos for our customers .

 

Q: Maintenance of electrical equipment, security measures to ensure that what
Maintenance of electrical equipment is the safety measures are as follows:1, strict implementation of the "coal mine safety regulations," the provisions of the electricity sector.2, all mechanical and electrical workers must go through rigorous technical training and safety training, qualified after the certificate, undocumented personnel are prohibited posts.3, mechanical and electrical workers to carry the complete power tools and instruments, voltage levels meet the requirements.
Q: What is the definition of abnormal equipment, equipment failure, equipment failure and equipment accident? From which power standard?
Accident: has occurred, resulting in loss of damage,Such as short circuit arc circuit breaker tripping, burning, scrap.
Q: What is the installation equipment of the transformer on the power installation project
Installation of drop fuseHigh and low voltage side of distribution transformer should be equipped with fuse. High voltage side fuse at the bottom of the vertical distance from the ground is not less than 4.5m, the fuse and the horizontal distance of not less than 0.5m, in order to smooth down the fuse tube is easy to operate and fuse, axis drop type fuse with the vertical line of 15% ~ 30% angle. The vertical distance to the surface of the bottom of the low voltage side fuse shall not be less than 3.5m, and the horizontal distance of each fuse shall not be less than 0.2m.
Q: Under the same voltage level, the rated voltage of the equipment is not exactly the same
And some appliances have no effect. For example: switching power supply, it can work in a wide range of voltage, the output voltage remains unchanged. It should be noted that, as long as the manufacturers in the normal operating voltage range, generally will not cause the state of work and security issues, can be assured that the use of.
Q: Reactive power compensation methods commonly used in power equipment
Hello!Electrical equipment commonly used in reactive power compensation and the method of improving power factor are: synchronous motor, synchro, series capacitor compensation, shunt capacitor and series reactor compensation (EHV transmission line) and SVC, SVG compensation. SVG is through the power electronic device IGBT and its control circuit, a active VaR of equal amplitude and opposite to the size of the system, the reactive power compensation device for reactive power compensation to offset the system in recent years is the development direction of reactive power compensation.
Q: What specific enterprises and units are used to test the power of the equipment ah
The other really did not ~ ~ ~ ~ ~What do you mean by electrical testing equipment??? High? Low?
Q: How to run a company that operates electric equipment
First to find a company to do the power equipment, their prices, of course, the ex factory price to come over
Q: What is the meaning of the station control layer in the power system
Power system (mainly refers to the substation, power plant can also) for the control of the entire system is currently divided into the station control layer and the interlayer, after the digital substation outlet,
Q: The difference between electric load and power supply capacity
There is a correlation coefficient between them, the power supply capacity = power load * demand coefficient.
Q: The relationship between primary equipment and two equipment in power system
The electrical equipment of electric power system is divided into the primary equipment and the two equipment, and the primary equipment (also called the main equipment) is the main body of the power system

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords