• Maglev VAWT 300W System 1
Maglev VAWT 300W

Maglev VAWT 300W

Ref Price:
get latest price
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
2000 units/month set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Rated Power:300W  

Wind wheel diameter:1230MM(D)/1090MM (H)  

Weight:29KG        

Blade Material: Aluminum Alloy                                                                            

The number of blade:3  

Minimum wind speed start:1m/s  

Minimum power wind speed:2m/s                                                                      

Minimum charge wind speed:2.5m/s    

Rated wind speed:12m/s    

Maximum cut off wind speed:15m/s                                                                      

Resistant to wind speed limit:65m/s    

The type of Generator: Three-phase AC maglev wind turbine                      

Controller output voltage:12V or 24V  

Controller output current:<20Amp                                                                        

Controller brake system: Over speed automatic Three-phase short-circuit braking Normal operating temperature:-30~50 ℃



Q: Is the GIS in the electric power high voltage switch cabinet
GIS is a shorthand for two conceptsThe 1 is the geographic information system.2 refers to the (GAS INSULATED SWITCHGEAR) gas insulated fully enclosed combination of electrical appliances, closed inside the main circuit breaker, isolation switch, grounding switch, bus, lightning arrester, etc.. Many power plants, substations, switching stations are made of GIS, so that the small footprint, or maintenance. With the high voltage switch cabinet or not.
Q: Electric power automation equipment
Power grid dispatching automation, power system analysis and control, power electronics, power market, distribution automation,
Q: Power transformers and other equipment are what units procurement bidding, all those procedures!
There are also a small number of individual units, such as large projects and large enterprises.The procedure is according to the conditions of the project are open to the public, the public required invitation required. There is also a project that is only through the construction project bidding units, equipment, the overall package to the construction unit, organized by the construction unit procurement.
Q: Large engineering construction (such as buildings, factories, institutions) distribution room of the power equipment as required? What's the difference? For example, some requirements never power, and some to eliminate harmonics to improve power quality, the more detailed the better the program
In the vicinity of the power grid in the supply of power on the requirements of their own generators to ensure that the dual power supply. Factories and institutions to see what the main work, if it is steel, hospital, such as the load category one or two categories of power needs of the dual power supply. And the load such as electric furnace, easy to produce harmonics, in order to ensure the power quality of the grid, it requires the installation of harmonic elimination device.
Q: What equipment is necessary on the list of electrical engineering equipment?
Take 35KV power engineering, the need for ZGF-400kV/2mA DC high voltage generator
Q: For example, EPS emergency power supply and so on, as well as those used in public emergencies.
The key is not the equipment problem, but to attach importance to the power emergency platform and power dispatching platformOf course, in addition to EPS lighting / power emergency power supply, there are the following emergency equipment:
Q: Definition of power equipment defects
General defectIn the short term will not be reduced to major defects, emergency defects, although the impact of the operation but can still operate.
Q: Ask the expert about the design of the power system diagram, 6kV side of the electrical equipment how to supply
For 35/6KV step-down stationEach line with the 6/0.4KV transformer, or 6KV equipment (such as 6KV synchronous motor), are the load of the stationSo, there are 6KV devices, single occupancy 6KV bus on a certain line can be
Q: What principles should be followed in power equipment maintenance
(2) the maintenance plan shall be arranged according to the unified arrangement of the power grid to improve the coordination and reduce the outage time of the equipment,. Improve operation reliability and equipment availability.
Q: Power equipment is required to replace the dimension, the state has no relevant provisions
This depends on the provisions of the local power supply department, generally not mandatory requirements.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches