Maglev VAWT 300W
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 2000 units/month set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Rated Power:300W
Wind wheel diameter:1230MM(D)/1090MM (H)
Weight:29KG
Blade Material: Aluminum Alloy
The number of blade:3
Minimum wind speed start:1m/s
Minimum power wind speed:2m/s
Minimum charge wind speed:2.5m/s
Rated wind speed:12m/s
Maximum cut off wind speed:15m/s
Resistant to wind speed limit:65m/s
The type of Generator: Three-phase AC maglev wind turbine
Controller output voltage:12V or 24V
Controller output current:<20Amp
Controller brake system: Over speed automatic Three-phase short-circuit braking Normal operating temperature:-30~50 ℃
- Q:Private enterprises must be free transfer of power facilities
- 4, in the public substation by the user to invest in the construction of power supply equipment, such as transformers, communications equipment, switches, knife gate, etc., by the unified management of power supply enterprises. Prior to the completion of commissioning, the two parties shall sign an agreement on the operation, maintenance, repair and spare parts.5, temporary electricity and other properties of the power supply facilities, in principle, by the owner of the property rights operation and maintenance management, or by the two sides agreed to negotiate and sign an agreement.Three, in fact, property rights is a "negotiation" thing, to see both sides of "power supply contract" about how the past, users are not willing to power assets, because of electricity on the line, you want the assets, after the electrical accidents and other things, will be responsible for asset owners repair, this is the main reason of users not assets.
- Q:The production and transportation process of electric power
- Transmission lines can be divided into overhead transmission lines and underground transmission lines according to the structure. The former is composed of line tower, conductor, insulator and so on, which is erected on the ground; the latter is mainly used for laying underground cable (or underwater). According to the nature of the current, the transmission can be divided into DC and AC transmission. In 1880s, the first successful realization of DC transmission, due to the low voltage limit (the transmission capacity is roughly proportional to the square of the transmission voltage) in the end of nineteenth Century for AC transmission replaced. AC transmission success ushered in the era of electrification in twentieth Century. Since 1960s, because of the development of power electronics technology, DC transmission has a new development, and AC transmission, with the formation of AC and DC hybrid power system.
- Q:What are the two devices in the power system
- Connect the two device circuit, called the two line. In the two line of DC is generally used for communication detection equipment, such as PABX, PDH, MUX, generally for 48V DC power supply, AC line for AC equipment use
- Q:The company has a number of power equipment to be exported, need to go through the sea, the technical requirements of three, I would like to ask what is the three here? How to check whether the complete sets of components used to do three treatment? Please exhibitions, grateful!
- The complete set of power distribution equipment is a complete set of equipment supplied by the manufacturer. The electric main circuit is divided into a plurality of units, each unit is a circuit, and the circuit breaker, the knife gate, the current transformer and the voltage transformer of each unit are connected
- Q:Power test equipment sales to find power supply company which departments? Which departments of the power supply company will use the power test equipment?
- Procurement is generally the Department of materials management, to find a high class, livelihood, materials department
- Q:What is the redundancy of electrical equipment
- Disk duplex: a I/O controller is added to the mirrored disk to form a dual disk to improve bus contention.RAID: cheap redundant array of disks (Redundant array of inexpensive disks). As the name suggests, it consists of a number of disks, through a controller to coordinate the movement of a single data flow into the disk. The RAID3 system consists of 5 disks, in which 4 disks store data, and the 1 stores the check information. If a disk fails, you can replace the disk on the line, and through the other 3 disks and check the disk to re create the data on the new site. RAID5 will check the information distributed on 5 disks, so you can replace any disk, the rest with the same RAID3.
- Q:In order to obtain the qualification test of power equipment, the company needs to have a hard condition
- Can not be directly applied for; there will be a variety of requirements for the application, including the number of test personnel configuration (to have a certificate, no evidence of personnel does not count), test equipment configuration (to provide invoices for the purchase of equipment, there is no light
- Q:In what way is it confirmed that the destroyer is an electrical device? Identification or what.
- The behavior of the power line that has been installed and has not yet been powered off shall be treated differently. If the stolen cut is not formally delivered to the power sector to use the line, should be handled in accordance with the theft case. If the actor knows the line has been delivered to the use of the power sector and steal cut wires, shall be designated as the crime of destruction of power equipment.
- Q:Pre checking and checking of goods in power system
- Check: the full name is a regular inspection, with the role of pre trial is almost the same as the general power system is the two equipmentGoods inspection heard, just heard of items set is the item visit orderly, convenient for production work.
- Q:Electric power equipment start-up and commissioning of the project there is a difference?
- The start of the equipment is started in the single test.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Maglev VAWT 300W
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 2000 units/month set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches