Tunnel Light Model TM-T120A / T150A / T180A /T270A
- Loading Port:
- Shekou
- Payment Terms:
- TT or LC
- Min Order Qty:
- 50 set
- Supply Capability:
- 500 units / month set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Tunnel Light Model TM-T120A / T150A / T180A /T270A
The tunnel light aims to solve the problem that the vehicles go into or out of the tunnel when the mutation of the brightness make visual "black hole effect" or "white hole effect". And special lamps and lanterns are used for tunnel lighting. The light source used commonly: sodium lamp, metal halide lamp sometimes use energy-saving lamps. Tunnel light can also be applied in workshops, large warehouses, gas stations, stadiums, and all kinds of manufacturing for metallurgy. We have diverse model for your choice.
2. Main Features of Tunnel Light Model TM-T120A / T150A / T180A /T270A
(1) high lighting efficiency and energy saving
(2) long lifespan
(3) perfectly match different kinds of mirrors
3. Tunnel Light Model TM-T120A / T150A / T180A /T270A Images
4. Tunnel Light Model TM-T120A / T150A / T180A /T270A Specification
Model No. | TM-T120A | TM-T150A | TM-T180A | TM-T270A |
Rated Power | 120W | 150W | 180W | 270W |
Size | 564*353*205 | 651*353*205 | 738*353*205 | 915*353*205 |
Weight | 5.2KG | 6.3KG | 7.4KG | 9.7KG |
Material | Extruded aluminum & Die casting aluminum | Extruded aluminum & Die casting aluminum | Extruded aluminum & Die casting aluminum | Extruded aluminum & Die casting aluminum |
Input Voltage | AC 90-305V | AC 90-305V | AC 90-305V | AC 90-305V |
Power Efficienty | >93% | >93% | >93% | >93% |
Power Factor | >0.95 | >0.95 | >0.95 | >0.95 |
LED Luminous Efficiency | 130-140LM | 130-140LM | 130-140LM | 130-140LM |
Light Flux | 12860LM | 13710LM | 17240LM | 26630LM |
Whole Lighting Efficiency | >90LM/W | >90LM/W | >90LM/W | >90LM/W |
Color Temperature | 2700K-6000K | 2700K-6000K | 2700K-6000K | 2700K-6000K |
Color Rendering Index | Ra>70 | Ra>70 | Ra>70 | Ra>70 |
Light Distribution Curve | Batwing Light Distribution Curve | Batwing Light Distribution Curve | Batwing Light Distribution Curve | Batwing Light Distribution Curve |
Beam Angle | 87° *134° | 87° *134° | 87° *134° | 87° *134° |
Junction Temperature | <65℃(Ta=25℃) | <65℃(Ta=25℃) | <65℃(Ta=25℃) | <65℃(Ta=25℃) |
Working Temperature | -30℃~40℃ | -30℃~40℃ | -30℃~40℃ | -30℃~40℃ |
Working Humidity | 10%~90% RH | 10%~90% RH | 10%~90% RH | 10%~90% RH |
Life Span | 5000H | 5000H | 5000H | 5000H |
Protection Level | IP65 | IP65 | IP65 | IP65 |
Installation Way | Rack Mounting | Rack Mounting | Rack Mounting | Rack Mounting |
Dimmer(selectable) | PWM Intelligent Dimming | PWM Intelligent Dimming | PWM Intelligent Dimming | PWM Intelligent Dimming |
5. FAQ
1. Do you have samples?
Re: Sorry we can’t offer samples, for the transportation cost much more than the product itself.
2. How could you give discount?
Re: Only if you are the regular customer of CNBM or OKORDER, and if your order sheet has got an amount large enough, we can have further discussion for the price discount.
- Q: What is the GIS in power system
- GIS has the advantages of small footprint, high reliability, high security, maintenance workload is very small, the main parts of the maintenance interval of not less than 20 years.In the Three Gorges project, the left bank power station and the right bank power station has a 550 thousand volt GIS high voltage power distribution device. Left bank power station 550 thousand volt GIS and ancillary equipment in the upstream of the Deputy plant height of 93.6 meters GIS indoor. Main transformer and 500 thousand volt shunt reactor. GIS and the main transformer and shunt reactor with oil, six sulfur hexafluoride casing connection. Room GIS upper Deputy plant roof, layout of a GIS air, oil outlet pipe and open the trap, capacitor voltage transformer, lightning arrester, air outlet, six sulfur hexafluoride overhead line connected by the casing with these devices. GIS indoor type.Indoor GIS is hardly affected by atmospheric conditions. GIS overhaul cycle is generally 15 years or more, the Three Gorges power plant GIS main parts of the maintenance interval of not less than 20 years. And AIS or H - GIS, due to the impact of the external atmospheric conditions, the aging and damage speed, overhaul cycle is short and overhaul times.
- Q: What is the definition of abnormal equipment, equipment failure, equipment failure and equipment accident? From which power standard?
- Obstacles: not clear, probably not normal and must be modified to be normal,If the circuit breaker parameter is not appropriate, change the parameter specification.
- Q: Ready to do electrical engineering commissioning, but do not know the work tired? Is there any danger?
- 3, the State Grid Substation Intelligent Inspection Robot infrastructure design, installation, commissioning, operation and maintenance work;4, master the progress of debugging, coordinate and solve the problems in the debugging process;5, sorting out the relevant information required for inspection, organization of the specific project acceptance;6, complete other tasks assigned by the leadership.
- Q: Reactive power compensation methods commonly used in power equipment
- The centralized compensation is to set up the reactive power compensation device in the power distribution room to compensate the reactive power in the region. Due to the introduction of several kinds of compensation sampling is set at the point of measurement, so you can minimize the interest rate generated electricity.In the professional field and transmission line compensation (high and low), furnace low-pressure grid compensation, flameproof compensation device etc..
- Q: Power test equipment sales to find power supply company which departments? Which departments of the power supply company will use the power test equipment?
- Procurement is generally the Department of materials management, to find a high class, livelihood, materials department
- Q: Power equipment Market Overview
- The first quarter of 2013, China's economy once again showed signs of slowing down, iron and steel, nonferrous metals and other raw material prices low volatility, electric power equipment manufacturing production costs at a relatively low level; at the same time by the industry overcapacity, fierce competition in the product market, a common means of low bid for corporate competition. Affected by the above two factors, the 1 quarter of China's power equipment manufacturing industry most price decline, in the electric power equipment Chinese Machinery Industry Federation statistics, 22 small manufacturing industries, there is decline in price index rose only 16 sub sectors, 6 sub industry price index.
- Q: For example, EPS emergency power supply and so on, as well as those used in public emergencies.
- High / low voltage switchgear, power distribution cabinets, industrial ovens, constant temperature and humidity test box, ovens, air curtain machine (invisible door), inductive automatic door, air conditioning and industrial fans, NELL thyristor module, thyristor, single / three-phase bridge rectifier, fast recovery module
- Q: The cost calculation of power equipment
- The cost of your equipment maintenance is calculated according to the method of replacement and maintenance
- Q: What is the meaning of the high - voltage high - voltage device in power system, which is mainly used to protect the situation,
- That response to the power parameters is high frequency, this requires high cycle splitting device, tripping the corresponding circuit breaker, to remove the part of power grid connected or separated from the original into two or more power, get rid of the accident or the narrow scope of the accident to
- Q: Ask the expert about the design of the power system diagram, 6kV side of the electrical equipment how to supply
- For 35/6KV step-down stationEach line with the 6/0.4KV transformer, or 6KV equipment (such as 6KV synchronous motor), are the load of the stationSo, there are 6KV devices, single occupancy 6KV bus on a certain line can be
Send your message to us
Tunnel Light Model TM-T120A / T150A / T180A /T270A
- Loading Port:
- Shekou
- Payment Terms:
- TT or LC
- Min Order Qty:
- 50 set
- Supply Capability:
- 500 units / month set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches