Maglev Vertical Axis Wind Turbine 300W
- Loading Port:
- Shekou
- Payment Terms:
- TT or LC
- Min Order Qty:
- -
- Supply Capability:
- 2000 units/month set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Maglev Vertical Axis Wind Turbine 300W
Maglev Vertical Axis Wind Turbine 300W is ranged as three-phase AC maglev wind turbine, which is designed for utility and adopts three Aluminum Alloy blades with magnetic levitation technology theory, it can work with no mechanical friction,no gear in the motor case.
2. Main Features of Maglev Vertical Axis Wind Turbine 300W
Benefits maglev VAWT in comparison to a propeller wind generators:
(1) higher efficiency than the propeller blades works even in turbulence
(2) visually pleasing appearance
(3) rotation of the blade quiet or almost minimal acoustic noise
(4) movement of the blades even in low wind 1m/sec
(5) turbine construction is resistant to gale 160km/h (100MPH)
(6) designed for mounting on mast, straight or saddle area
(7) design: aluminum, stainless steel, fiberglass
(8) direction of rotation by earth hemisphere using Coriolis force
(9) half design against vane turbines, with the same power
3. Maglev Vertical Axis Wind Turbine 300W Specification
Rated Power:300W
Wind wheel diameter:1230MM(D)/1090MM (H)
Weight:29KG
Minimum wind speed start:1m/s
Minimum power wind speed:2m/s
Minimum charge wind speed:2.5m/s
Rated wind speed:12m/s
Maximum cut off wind speed:15m/s
Resistant to wind speed limit:65m/s
Controller output voltage:12V or 24V
Controller output current:<20Amp
Controller brake system: Over speed automatic Three-phase short-circuit braking
Normal operating temperature:-30~50 ℃
4. Maglev Vertical Axis Wind Turbine 300W Images
5. FAQ
Q1: How is the installation for the wind turbine?
Re: It is easy to instal the turbine, and the system can be assembled in under an hour without any welding.
Q2: Is it difficult to be connected to the PV system?
Re: No, it is easy acturally.
- Q: What are the main interference sources of the two power system
- The main source of disturbance in power system are: high voltage isolation switch and circuit breaker operation; short circuit and lightning system; partial discharge; two switch operation system; voltage load change and faults when the power grid has sag, interruption, unbalance, harmonics and frequency variation of power frequency and harmonic electric field and harassment; the magnetic field generator and transformer; transmission circuit in the surrounding electric field and magnetic field; high frequency conduction disturbance and radiation disturbance automation equipment, radio equipment; natural phenomena such as lightning, electrostatic discharge, geomagnetic disturbance and dry harassment pulse generated by nuclear power.
- Q: Recently went out to do the test, do not know the difference between the two tests
- Preventive testing is to test or test equipment periodically and regularly. For example, once a month, 3 months or a few times a year of preventive testing or testing, to exclude the existence of hidden dangers...
- Q: The problem of electric power equipment withstand voltageWhy does the pressure decrease when the altitude is high? The air is thin, is not easy to breakdown (vacuum breakdown is not very low atmospheric pressure)
- Although the degree of vacuum is higher than that of the low altitude, the relationship between the insulation strength and the degree of vacuum, especially from the atmosphere to the beginning of the high vacuum. Insulation strength is high - low - high change process
- Q: In the communication and power equipment in the data access to a "remote message quantity" concept, then what is called "remote information", how to define it? Thank you
- . When the circuit breaker is switched on, the position of the gate is the remote signal. Generally can be defined according to their needs!
- Q: Private enterprises must be free transfer of power facilities
- In accordance with the provisions of the "power supply business rules," article forty-sixth: user owned, joint ventures or fund-raising construction of transmission, substation, distribution and other power supply facilities, the operation and maintenance management to determine the following provisions:
- Q: All I know is a generator, a transformer. I also want to fully understand the power system related to the equipment, from power generation to end users (enterprises, factories, they will design the equipment, production equipment is not to say, but they will be transferred to the electricity, in use is the processing equipment, such as transformer, I only know this involved) equipment, detailed list, thank you ah
- Divided into primary equipment and two equipmentOnce the equipment is responsible for the transmission of electrical energy, the two equipment is responsible for monitoring and protection of primary equipment.
- Q: The company has a number of power equipment to be exported, need to go through the sea, the technical requirements of three, I would like to ask what is the three here? How to check whether the complete sets of components used to do three treatment? Please exhibitions, grateful!
- As well as protection, control, measurement and other devices are assembled in a whole cabinet, there are a number of high-voltage switchgear in power plants, substations or power distribution equipment installed after the installation of the power plant is called a complete set of power distribution equipment.
- Q: How to handle the qualification test, what kind of power equipment
- To submit the application form for the installation of power equipment (repair, test)";
- Q: I do sales of electrical equipment, how to deal with the power supply bureau?
- 380 low voltage line equipment (switchboard, overcurrent protector, etc.) or electrical equipment (such as electric energy metering, checking table, meter and electric meter box, etc.) if you want to make better cooperation effect you, if you have the ability, then of course you directly to the main leadership of the power department is better the.
- Q: Power equipment is required to replace the dimension, the state has no relevant provisions
- This depends on the provisions of the local power supply department, generally not mandatory requirements.
Send your message to us
Maglev Vertical Axis Wind Turbine 300W
- Loading Port:
- Shekou
- Payment Terms:
- TT or LC
- Min Order Qty:
- -
- Supply Capability:
- 2000 units/month set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords